Upper Peninsula Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 53051-53052 [2014-21166]
Download as PDF
rmajette on DSK2TPTVN1PROD with NOTICES
Federal Register / Vol. 79, No. 172 / Friday, September 5, 2014 / Notices
miles of its 6-inch diameter P–20 line in
Rice, McPherson, and Marion Counties,
Kansas. The portion of the P–20 line
that is to be abandoned has been
disconnected from the KPC system and
has not been used to provide service
since approximately 1992, all as more
fully set forth in the application, which
is on file with the Commission and open
to public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Cathy
Pocock, KPC Pipeline, LLC, 14000 Quail
Springs Pkwy., Suite 250, Oklahoma
City, OK 73134, phone: (405) 608–8557,
fax: (405) 608–8600, or email: cpocock@
mvpipelines.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
VerDate Mar<15>2010
14:29 Sep 04, 2014
Jkt 232001
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Comment Date: 5 p.m. Eastern Time
on September 17, 2014.
Dated: August 27, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–21157 Filed 9–4–14; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
53051
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1864–187]
Upper Peninsula Power Company;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-project Use
of Project Lands.
b. Project No: 1864–187.
c. Date Filed: June 20, 2014.
d. Applicant: Upper Peninsula Power
Company.
e. Name of Project: Bond Falls.
f. Location: Ontonagon River in
Ontonagon and Gogebic Counties,
Michigan, and Vilas County, Wisconsin.
The project occupies federal lands
administered by the U.S. Forest Service
within the Ottawa National Forest.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Shawn Puzen,
Upper Peninsula Power Company, 700
North Adams Street, P.O. Box 19001,
Green Bay, Wisconsin 54307–9001;
Telephone: (920) 433–1094.
i. FERC Contact: Patricia A. Grant at
(312) 596–4435, or email:
patricia.grant@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
September 26, 2014.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Secretary,
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426. Please include the project
number (P–1864–187) on any
comments, motions, or
recommendations filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
E:\FR\FM\05SEN1.SGM
05SEN1
rmajette on DSK2TPTVN1PROD with NOTICES
53052
Federal Register / Vol. 79, No. 172 / Friday, September 5, 2014 / Notices
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: The
licensee proposes to remove the current
maintenance building at the Victoria
development (02) of the Bond Falls
project, and replace it with a new
building, to be constructed in the area
of the existing boat landing parking
area. The boat landing parking area and
associated recreation facilities will be
moved to the area vacated by the current
maintenance building.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field (P–9951) to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, call 1–
866–208–3676 or email
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above. Agencies may obtain copies of
the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
VerDate Mar<15>2010
14:29 Sep 04, 2014
Jkt 232001
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: August 26, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–21166 Filed 9–4–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–542–000]
Southern Star Central Gas Pipeline,
Inc.; Notice of Application
Take notice that on August 22, 2014,
Southern Star Central Gas Pipeline, Inc.
(Southern Star) filed in the above
referenced docket an application,
pursuant to section 7(c) of the Natural
Gas Act (NGA) and Part 157 of the
Commission’s regulations, requesting
authorization to further expand the
existing certificated boundary and
buffer zone of Southern Star’s Alden
Gas Storage Field, located in Rice
County, Kansas, all as more fully
described in the Application which is
on file with the Commission and open
to public inspection. The filing may be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application may be directed to David N.
Roberts, Analyst Staff, Regulatory
Compliance, Southern Star Central Gas
Pipeline, Inc., 4700 Highway 56,
Owensboro, Kentucky 42301, by phone
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
(270) 852–4654, by fax (270) 852–5010,
or by email at
David.N.Roberts@sscgp.com, or to W.
Douglas Field, Senior Attorney,
Southern Star Central Gas Pipeline, Inc.,
4700 Highway 56, Owensboro,
Kentucky 42301, by phone (270) 852–
4657, or by email at
W.Doug.Field@sscgp.com.
Specifically, Southern Star requests
authorization to acquire the gas storage
easements and related mineral rights to
(1) 2,652 acres of the Simpson formation
within the northern part of current
certificated boundary of the Alden field,
(2) 660 acres outside the current
certificated boundary on the north,
northeast, and northwest flanks, from
the base of the Kansas City Limestone to
the top of the Arbuckle Limestone, to
include both the Simpson and Misener
formations, and (3) 350 acres of the
Simpson formation within the southeast
part of the current boundary. The
acquisition is part of Southern Star’s
efforts to halt migration of storage gas
from the Misener formation into the
Simpson formation. Southern Star
estimates the total capital cost for the
acquisition of the property interest to be
approximately $1,357,946.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
E:\FR\FM\05SEN1.SGM
05SEN1
Agencies
[Federal Register Volume 79, Number 172 (Friday, September 5, 2014)]
[Notices]
[Pages 53051-53052]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-21166]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1864-187]
Upper Peninsula Power Company; Notice of Application Accepted for
Filing and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Non-project Use of Project Lands.
b. Project No: 1864-187.
c. Date Filed: June 20, 2014.
d. Applicant: Upper Peninsula Power Company.
e. Name of Project: Bond Falls.
f. Location: Ontonagon River in Ontonagon and Gogebic Counties,
Michigan, and Vilas County, Wisconsin. The project occupies federal
lands administered by the U.S. Forest Service within the Ottawa
National Forest.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Shawn Puzen, Upper Peninsula Power Company,
700 North Adams Street, P.O. Box 19001, Green Bay, Wisconsin 54307-
9001; Telephone: (920) 433-1094.
i. FERC Contact: Patricia A. Grant at (312) 596-4435, or email:
patricia.grant@ferc.gov.
j. Deadline for filing comments, motions to intervene, and
protests: September 26, 2014.
All documents may be filed electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Secretary, Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426.
Please include the project number (P-1864-187) on any comments,
motions, or recommendations filed.
The Commission's Rules of Practice and Procedure require all
intervenors
[[Page 53052]]
filing documents with the Commission to serve a copy of that document
on each person whose name appears on the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. Description of Request: The licensee proposes to remove the
current maintenance building at the Victoria development (02) of the
Bond Falls project, and replace it with a new building, to be
constructed in the area of the existing boat landing parking area. The
boat landing parking area and associated recreation facilities will be
moved to the area vacated by the current maintenance building.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field (P-9951) to access the document. You
may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, call 1-866-
208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-
8659. A copy is also available for inspection and reproduction at the
address in item (h) above. Agencies may obtain copies of the
application directly from the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: August 26, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-21166 Filed 9-4-14; 8:45 am]
BILLING CODE 6717-01-P