Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization, 50646 [2014-20061]
Download as PDF
50646
Federal Register / Vol. 79, No. 164 / Monday, August 25, 2014 / Notices
commodity and capacity for receipt and
delivery points across multiple pipeline
systems.
This meeting is open to the public
and all interested parties, including
those in the electric power and financial
sectors, are invited to attend. There is
no registration fee to attend and this
meeting will not be Web cast or
transcribed. Meeting attendees are
reminded to allow sufficient time to
pass through building security
procedures.
Persons wishing to participate and
speak at this meeting should express
such interest no later than September 4,
2014 by contacting Jason Stanek, Legal
Advisor to the Commissioner at (202)
502–8403, or by email at
jason.stanek@ferc.gov.
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accommodations, please send an email
to accessibility@ferc.gov or call toll free
1–866–208–3372 (voice) or (202) 502–
8659 (TTY), or send a facsimile to (202)
208–2106 noting the accommodations
required.
Dated: August 19, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–20127 Filed 8–22–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–531–000]
emcdonald on DSK67QTVN1PROD with NOTICES
Southern Star Central Gas Pipeline,
Inc.; Notice of Request Under Blanket
Authorization
Take notice that on August 7, 2014,
Southern Star Central Gas Pipeline, Inc.
(Southern Star), 4700 State Highway 56,
Owensboro, Kentucky 42301, filed in
the above Docket, a prior notice request
pursuant to section 157.210 of the
Commission’s regulations under the
Natural Gas Act (NGA) for authorization
to increase the capacity along mainline
facilities from its Marionville/Billings
TB area on Line HQ to an existing
delivery meter known as Summit
Rogersville located in Greene County,
Missouri, all as more fully set forth in
the application which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
VerDate Mar<15>2010
17:31 Aug 22, 2014
Jkt 232001
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions concerning this
application may be directed to David N.
Roberts, Analyst Staff, Regulatory
Compliance, Southern Star Central Gas
Pipeline, Inc., 4700 State Highway 56,
Owensboro, Kentucky 42301, at (270)
852–4654.
Specifically, Southern Star’s proposed
increase in capacity, of 4,000 Mcf/d on
a portion of its 16-inch Line HQ, will
require yard piping modifications
upstream within the existing Saginaw
and Grabham Compressor Stations. The
estimated cost of the project is $423,000.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal thorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
Natural Gas Act (NGA) (18 CFR 157.205)
file a protest to the request. If no protest
is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
day after the time allowed for protest. If
a protest is filed and not withdrawn
within 30 days after the time allowed
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link.
Dated: August 18, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–20061 Filed 8–22–14; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–R09–OAR–2014–0484; FRL–9915–66–
Region–9]
Adequacy Status of Motor Vehicle
Emissions Budgets in Submitted Fine
Particulate Maintenance Plan for Yuba
City-Marysville; California
Environmental Protection
Agency.
ACTION: Notice of adequacy.
AGENCY:
The Environmental Protection
Agency (EPA) is notifying the public
that the Agency has found that the
motor vehicle emissions budgets
(MVEBs) for fine particulate (PM2.5) for
the years 2017 and 2024 in the Yuba
City-Marysville PM2.5 Nonattainment
Area Redesignation Request and
Maintenance Plan (April 1, 2013)
(‘‘Yuba City-Marysville PM2.5 Plan’’) are
adequate for transportation conformity
purposes. The Yuba City-Marysville
PM2.5 Plan was submitted to EPA on
May 23, 2013 by the California Air
Resources Board (CARB) as a revision to
the California State Implementation
Plan (SIP) and includes a maintenance
plan for the 2006 24-hour PM2.5 national
ambient air quality standard. Upon the
effective date of this notice of adequacy,
the Sacramento Area Council of
Governments and the U.S. Department
of Transportation must use the MVEBs
for future conformity determinations.
DATES: This finding is effective on
September 9, 2014.
FOR FURTHER INFORMATION CONTACT: John
Ungvarsky, U.S. EPA, Region IX, Air
Division AIR–2, 75 Hawthorne Street,
San Francisco, CA 94105–3901, (415)
972–3963 or ungvarsky.john@epa.gov.
SUPPLEMENTARY INFORMATION:
Throughout this document, whenever
‘‘we,’’ ‘‘us,’’ or ‘‘our’’ is used, we mean
EPA.
This notice is simply an
announcement of a finding that we have
already made. EPA Region IX sent a
letter to CARB on August 11, 2014
stating that the MVEBs in the submitted
Yuba City-Marysville PM2.5 Plan for
2017 and 2024 are adequate. The
adequate MVEBs are provided in the
following table:
SUMMARY:
E:\FR\FM\25AUN1.SGM
25AUN1
Agencies
[Federal Register Volume 79, Number 164 (Monday, August 25, 2014)]
[Notices]
[Page 50646]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-20061]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP14-531-000]
Southern Star Central Gas Pipeline, Inc.; Notice of Request Under
Blanket Authorization
Take notice that on August 7, 2014, Southern Star Central Gas
Pipeline, Inc. (Southern Star), 4700 State Highway 56, Owensboro,
Kentucky 42301, filed in the above Docket, a prior notice request
pursuant to section 157.210 of the Commission's regulations under the
Natural Gas Act (NGA) for authorization to increase the capacity along
mainline facilities from its Marionville/Billings TB area on Line HQ to
an existing delivery meter known as Summit Rogersville located in
Greene County, Missouri, all as more fully set forth in the application
which is on file with the Commission and open to public inspection. The
filing may also be viewed on the web at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY,
contact (202) 502-8659.
Any questions concerning this application may be directed to David
N. Roberts, Analyst Staff, Regulatory Compliance, Southern Star Central
Gas Pipeline, Inc., 4700 State Highway 56, Owensboro, Kentucky 42301,
at (270) 852-4654.
Specifically, Southern Star's proposed increase in capacity, of
4,000 Mcf/d on a portion of its 16-inch Line HQ, will require yard
piping modifications upstream within the existing Saginaw and Grabham
Compressor Stations. The estimated cost of the project is $423,000.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal thorizations within 90 days of
the date of issuance of the Commission staff's FEIS or EA.
Any person may, within 60 days after the issuance of the instant
notice by the Commission, file pursuant to Rule 214 of the Commission's
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of
intervention. Any person filing to intervene or the Commission's staff
may, pursuant to section 157.205 of the Commission's Regulations under
the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for protest. If a protest is filed and not
withdrawn within 30 days after the time allowed for filing a protest,
the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (www.ferc.gov) under the ``e-Filing'' link.
Dated: August 18, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-20061 Filed 8-22-14; 8:45 am]
BILLING CODE 6717-01-P