Drawbridge Operation Regulation; Bishop Cut, Between King Island and Bishop Tract, CA, 49683-49684 [2014-19992]
Download as PDF
Federal Register / Vol. 79, No. 163 / Friday, August 22, 2014 / Rules and Regulations
waterway. During the enforcement
period, entry into, transiting, or
anchoring in the safety zone is
prohibited to all vessels not registered
with the sponsor as participants or
official patrol vessels, unless
specifically authorized by the Captain of
the Port (COTP) Pittsburgh or a
designated representative.
List of Subjects in 26 CFR Part 1
Income taxes, Reporting and
recordkeeping requirements.
Correction of Publication
Accordingly, 26 CFR part 1 is
corrected by making the following
correcting amendments:
PART 1—INCOME TAXES
The regulations in 33 CFR
100.801 will be enforced with actual
notice on August 30–31, 2014 from 9:00
a.m. until 6:00 p.m.
DATES:
Paragraph 1. The authority citation
for part 1 continues to read in part as
follows:
■
Authority: 26 U.S.C. 7805 * * *
§ 1.861–9 Allocation and apportionment of
interest expense.
(h) * * *
(4) * * *
(iii) * * *
(A) * * * The value of these assets
has been determined using generally
accepted valuation techniques, as
required by § 1.861–9T(h)(1)(ii). * * *
*
*
*
*
*
Martin V. Franks,
Chief, Publications and Regulations Branch,
Legal Processing Division, Associate Chief
Counsel (Procedure and Administration).
[FR Doc. 2014–19873 Filed 8–21–14; 8:45 am]
BILLING CODE 4830–01–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 100
[Docket No. USCG–2014–0580]
RIN 1625–AA08
Eighth Coast Guard District Annual
Marine Events; Wheeling Vintage
Raceboat Regatta; Ohio River Mile 90.2
to 90.8; Wheeling, WV
Coast Guard, DHS.
Notice of enforcement of
regulation.
AGENCY:
ACTION:
The Coast Guard will enforce
a special local regulation for the
Wheeling Vintage Raceboat Regatta on
the Ohio River, from mile 90.2 to 90.8,
extending the entire width of the river.
This zone will be in effect on August
30–31, 2014 from 9:00 a.m. until 6:00
p.m. This regulated area is necessary to
protect vessels participating in the event
and event spectators from the hazards
associated with a boat race on the
rmajette on DSK2TPTVN1PROD with RULES
SUMMARY:
VerDate Mar<15>2010
14:40 Aug 21, 2014
Jkt 232001
If
you have questions on this notice of
enforcement, call or email Ariana
Mohnke, Marine Safety Unit Pittsburgh,
U.S. Coast Guard, at telephone (412)
644–5808, email Ariana.L.Mohnke@
uscg.mil.
FOR FURTHER INFORMATION CONTACT:
Par. 2. Section 1.861–9 is amended by
revising the third to the last sentence of
paragraph (h)(4)(iii)(A) to read as
follows:
■
The Coast
Guard will enforce the special local
regulation for the annual Wheeling
Vintage Raceboat Regatta listed in 33
CFR 100.801 Table 1, Entry No. 25;
Sector Ohio Valley on August 30–31,
2014 from 9:00 a.m. until 6:00 p.m.
Under the provisions of 33 CFR
100.801, entry into the safety zone listed
in Table 1, Entry No. 25; Sector Ohio
Valley, is prohibited unless authorized
by the COTP or a designated
representative. Persons or vessels
desiring to enter into or passage through
the safety zone must request permission
from the COTP or a designated
representative. If permission is granted,
all persons and vessels shall comply
with the instructions of the COTP
Pittsburgh or designated representative.
This notice is issued under authority
of 5 U.S.C. 552(a) and 33 U.S.C. 1233.
The Coast Guard will provide the
maritime community with advance
notification of this enforcement period
via Local Notice to Mariners and
updates via Marine Information
Broadcasts.
If the COTP or designated
representative determines that the
special local regulation need not be
enforced for the full duration stated in
this notice of enforcement, he or she
may use a Broadcast Notice to Mariners
to remove this restriction or to grant
general permission to enter the
regulated area.
SUPPLEMENTARY INFORMATION:
Dated: August 1, 2014.
L. N. Weaver,
Commander, U. S. Coast Guard, Captain of
the Port, Pittsburgh.
[FR Doc. 2014–19984 Filed 8–21–14; 8:45 am]
BILLING CODE 9110–04–P
PO 00000
Frm 00025
Fmt 4700
Sfmt 4700
49683
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2014–0736]
Drawbridge Operation Regulation;
Bishop Cut, Between King Island and
Bishop Tract, CA
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the San Joaquin
County highway bridge across Bishop
Cut, mile 1.0 between King Island and
Bishop Tract, CA. The deviation is
necessary to allow the bridge owner to
make necessary bridge repairs. This
deviation allows the bridge to remain in
the closed-to-navigation position during
the deviation period.
DATES: This deviation is effective
without actual notice from August 22,
2014 through 5 p.m. on October 23,
2014. For the purposes of enforcement,
actual notice will be used from 7 a.m.
on August 18, 2014, until August 22,
2014.
ADDRESSES: The docket for this
deviation, [USCG–2014–0736], is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email David H.
Sulouff, Chief, Bridge Section, Eleventh
Coast Guard District; telephone 510–
437–3516, email David.H.Sulouff@
uscg.mil. If you have questions on
viewing the docket, call Cheryl Collins,
Program Manager, Docket Operations,
telephone 202–366–9826.
SUPPLEMENTARY INFORMATION: The
County of San Joaquin has requested a
temporary change to the operation of the
San Joaquin County highway bridge,
mile 1.0, over Bishop Cut, between King
Island and Bishop Tract, CA. The
drawbridge navigation span provides
approximately 6 feet vertical clearance
above Mean High Water in the closedSUMMARY:
E:\FR\FM\22AUR1.SGM
22AUR1
49684
Federal Register / Vol. 79, No. 163 / Friday, August 22, 2014 / Rules and Regulations
to-navigation position. In accordance
with 33 CFR 117.143, the draw opens on
signal if at least 12 hours notice is given
to the San Joaquin County Department
of Public Works at Stockton. Navigation
on the waterway is commercial and
recreational.
The drawspan will be secured in the
closed-to-navigation position from 7
a.m. on August 18, 2014 to 5 p.m. on
October 23, 2014 to allow the bridge
owner to make necessary structural
maintenance repairs and to replace
approach deck slabs. This temporary
deviation has been coordinated with the
waterway users. No objections to the
proposed temporary deviation were
raised.
Vessels able to pass through the
bridge in the closed position may do so
at any time. The bridge will not be able
to open for emergencies, and
Disappointment Slough can be used as
an alternate route for vessels unable to
pass through the bridge in closed
position. The Coast Guard will inform
waterway users of this temporary
deviation via our Local and Broadcast
Notices to Mariners, to minimize
resulting navigational impacts.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: August 6, 2014.
D.H. Sulouff,
District Bridge Chief, Eleventh Coast Guard
District.
[FR Doc. 2014–19992 Filed 8–21–14; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2014–0670]
Drawbridge Operation Regulation;
Lake Washington Ship Canal, Seattle,
WA
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Montlake
Bridge across the Lake Washington Ship
Canal, mile 5.2, at Seattle, WA. The
deviation continues to allow the
Washington State Department of
Transportation to accommodate
rmajette on DSK2TPTVN1PROD with RULES
SUMMARY:
VerDate Mar<15>2010
14:40 Aug 21, 2014
Jkt 232001
vehicular traffic attending football
games, and maintain the bridge in the
closed to navigation position. This
deviation modifies the previously
approved deviation under the same
docket number.
DATES: This deviation is effective from
September 6, 2014 through November
22, 2014.
ADDRESSES: The docket for this
deviation, [USCG–2014–0670] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Steven M.
Fischer, Bridge Administrator,
Thirteenth District, Coast Guard;
telephone 206–220–7282, email
Steven.M.Fischer3@uscg.mil. If you
have questions on viewing the docket,
call Cheryl Collins, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUPPLEMENTARY INFORMATION: This
temporary deviation supersedes the
previous deviation of the same docket
number published on August 5, 2014
(79 FR 45344) with respect to the closer
times from September 6, 2014 to
November 22, 2014. The Washington
State Department of Transportation, on
behalf of the University of Washington
Police Department, has requested that
30 additional minutes be added to the
requested time periods published on
August 5, 2014 to facilitate timely
movement of pre-game and post-game
football traffic. The Montlake Bridge
bascule span will remain closed and
need not open to vessel traffic from 9:30
a.m. to 12:30 p.m., and from 2:30 p.m.
to 5:30 p.m. on September 6, 2014; from
10:30 a.m. to 1:30 p.m. and from 3:30
p.m. to 6:30 p.m. on September 13,
2014. The times for the closures on
September 20, 2014, September 27,
2014, October 25, 2014, November 8,
2014, and November 22, 2014 will be
determined and announced in the Coast
Guard’s Local Notice to Mariners and
Broadcast Notice to Mariners as they
become available. Due to NCAA
television scheduling, the times for the
games are not currently available. The
bridge shall operate in accordance to 33
CFR 117.1051(e) at all other times.
PO 00000
Frm 00026
Fmt 4700
Sfmt 4700
The Montlake Bridge crosses the Lake
Washington Ship Canal at mile 5.2, and
while in the closed position provides 30
feet of vertical clearance throughout the
navigation channel and 46 feet of
vertical clearance throughout the center
60-feet of the bridge. These vertical
clearance measurements are made in
reference to the Mean Water Level of
Lake Washington. The normal operating
schedule for the Montlake Bridge states
that the bridge opens on signal, subject
to the list of exceptions provided in 33
CFR 117.1051(e).
Waterway usage on the Lake
Washington Ship Canal ranges from
commercial tug and barge to small
pleasure craft. Vessels able to pass
through the bridge in the closed
positions may do so at any time. The
bridge will be able to open for
emergencies and there is no immediate
alternate route for vessels to pass. The
Coast Guard will also inform the users
of the waterways through our Local and
Broadcast Notices to Mariners of the
change in operating schedule for the
bridge so that vessels can arrange their
transits to minimize any impact caused
by the temporary deviation.
In accordance with 33 CFR 117.35(e),
the drawbridges must return to its
regular operating schedule immediately
at the end of the designated time period.
This deviation from the operating
regulations is authorized under 33 CFR
117.35.
Dated: August 11, 2014.
Steven M. Fischer,
Bridge Administrator, Thirteenth Coast Guard
District.
[FR Doc. 2014–20004 Filed 8–21–14; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2014–0735]
Drawbridge Operation Regulation;
Lake Washington Ship Canal, Seattle,
WA
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Seattle
Department of Transportation (SDOT)
Fremont Bridge, across the Lake
Washington Ship Canal, mile 2.6, at
Seattle, WA. This deviation is necessary
to allow the bridge to operate in single
SUMMARY:
E:\FR\FM\22AUR1.SGM
22AUR1
Agencies
[Federal Register Volume 79, Number 163 (Friday, August 22, 2014)]
[Rules and Regulations]
[Pages 49683-49684]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-19992]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2014-0736]
Drawbridge Operation Regulation; Bishop Cut, Between King Island
and Bishop Tract, CA
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the San Joaquin County highway bridge
across Bishop Cut, mile 1.0 between King Island and Bishop Tract, CA.
The deviation is necessary to allow the bridge owner to make necessary
bridge repairs. This deviation allows the bridge to remain in the
closed-to-navigation position during the deviation period.
DATES: This deviation is effective without actual notice from August
22, 2014 through 5 p.m. on October 23, 2014. For the purposes of
enforcement, actual notice will be used from 7 a.m. on August 18, 2014,
until August 22, 2014.
ADDRESSES: The docket for this deviation, [USCG-2014-0736], is
available at https://www.regulations.gov. Type the docket number in the
``SEARCH'' box and click ``SEARCH.'' Click on Open Docket Folder on the
line associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140 on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email David H. Sulouff, Chief, Bridge
Section, Eleventh Coast Guard District; telephone 510-437-3516, email
David.H.Sulouff@uscg.mil. If you have questions on viewing the docket,
call Cheryl Collins, Program Manager, Docket Operations, telephone 202-
366-9826.
SUPPLEMENTARY INFORMATION: The County of San Joaquin has requested a
temporary change to the operation of the San Joaquin County highway
bridge, mile 1.0, over Bishop Cut, between King Island and Bishop
Tract, CA. The drawbridge navigation span provides approximately 6 feet
vertical clearance above Mean High Water in the closed-
[[Page 49684]]
to-navigation position. In accordance with 33 CFR 117.143, the draw
opens on signal if at least 12 hours notice is given to the San Joaquin
County Department of Public Works at Stockton. Navigation on the
waterway is commercial and recreational.
The drawspan will be secured in the closed-to-navigation position
from 7 a.m. on August 18, 2014 to 5 p.m. on October 23, 2014 to allow
the bridge owner to make necessary structural maintenance repairs and
to replace approach deck slabs. This temporary deviation has been
coordinated with the waterway users. No objections to the proposed
temporary deviation were raised.
Vessels able to pass through the bridge in the closed position may
do so at any time. The bridge will not be able to open for emergencies,
and Disappointment Slough can be used as an alternate route for vessels
unable to pass through the bridge in closed position. The Coast Guard
will inform waterway users of this temporary deviation via our Local
and Broadcast Notices to Mariners, to minimize resulting navigational
impacts.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: August 6, 2014.
D.H. Sulouff,
District Bridge Chief, Eleventh Coast Guard District.
[FR Doc. 2014-19992 Filed 8-21-14; 8:45 am]
BILLING CODE 9110-04-P