Regulus Solar, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 49510-49511 [2014-19860]

Download as PDF 49510 Federal Register / Vol. 79, No. 162 / Thursday, August 21, 2014 / Notices proceeding. Intervenors play a more formal role in the process and are able to file briefs, appear at hearings, and be heard by the courts if they choose to appeal the Commission’s final ruling. An intervenor formally participates in the proceeding by filing a request to intervene. Instructions for becoming an intervenor are in the User’s Guide under the ‘‘e-filing’’ link on the Commission’s Web site. Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC Web site at www.ferc.gov using the ‘‘eLibrary’’ link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number, excluding the last three digits in the Docket Number field (i.e., CP14–514). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission now offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/ docs-filing/esubscription.asp. Finally, public meetings or site visits will be posted on the Commission’s calendar located at www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. Kimberly D. Bose, Secretary. [FR Doc. 2014–19861 Filed 8–20–14; 8:45 am] mstockstill on DSK4VPTVN1PROD with NOTICES BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. ER14–2630–000] [Docket No. CP14–96–000] Algonquin Gas Transmission, LLC; Notice of Revised Public Comment Meeting and Additional Public Comment Meeting on the Draft Environmental Impact Statement for the Algonquin Incremental Market Project On August 6, 2014, the Federal Energy Regulatory Commission (FERC or Commission) issued the Draft Environmental Impact Statement (EIS) for the Algonquin Incremental Market Project. The Draft EIS announced the close of the comment period on September 29, 2014 and identified four public comment meetings. This notice revises the date of the meeting to be held in Cortlandt Manor, New York from September 11, 2014 to September 15, 2014; and adds one new meeting in Mapleville, Rhode Island on September 16, 2014. The other announced meetings in Connecticut and Massachusetts will be held at the dates, times, and locations previously identified. The new meetings noticed herein will begin at 6:30 p.m. and are scheduled as follows: Date Location Monday, September 15, 2014 (There is NO meeting on September 11, 2014). Muriel H. Morabito Community Center, 29 Westbrook Drive, Cortlandt Manor, NY 10567, (914) 739–5845. Crystal Lake Golf Club, 100 Bronco Highway, Mapleville, RI 02839, (401) 567– 4500. Tuesday, September 16, 2014. This and all public meetings will be posted on the Commission’s calendar located at www.ferc.gov/EventCalendar/ EventsList.aspx along with other related information. Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC Web site at www.ferc.gov using the ‘‘eLibrary’’ link and the project docket number (i.e., CP–14–96). Dated: August 15, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–19864 Filed 8–20–14; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 17:18 Aug 20, 2014 Jkt 232001 PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 Regulus Solar, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Regulus Solar, LLC’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability, is September 4, 2014. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email E:\FR\FM\21AUN1.SGM 21AUN1 Federal Register / Vol. 79, No. 162 / Thursday, August 21, 2014 / Notices FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 15, 2014. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2014–19860 Filed 8–20–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP14–532–000] mstockstill on DSK4VPTVN1PROD with NOTICES Tennessee Gas Pipeline Company, L.L.C.; Notice of Request Under Blanket Authorization Take notice that on August 8, 2014, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed in Docket No. CP14–532–000, a prior notice request pursuant to sections 157.205 and 157.216 of the Commission’s regulations under the Natural Gas Act (NGA) as amended, requesting authorization to abandon an inactive injection and withdrawal well (Well 4789) and related lateral pipeline and appurtenances in the Hebron Storage Field in Potter County, Pennsylvania, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Specifically, Tennessee proposes to plug and abandon Well 4789 and abandon by removal the related well head, a meter run, approximately 350 feet of 6-inch diameter lateral pipeline and riser. Tennessee states that it has made numerous attempts to clean and repair Well 4789, which have proved unsuccessful. Tennessee asserts that Well 4789 is inactive and, due to its mechanical condition, cannot be utilized as an injection and withdrawal well. Tennessee avers that the proposed abandonment of Well 4789 will not affect either the capacity or deliverability of the Hebron Storage Field and has not been used to provide service to any customer for more than 12 months. Tennessee estimates the cost of the proposed project to be $545,860. VerDate Mar<15>2010 17:18 Aug 20, 2014 Jkt 232001 Any questions concerning this application may be directed to Thomas G. Joyce, Manager, Certificates, Tennessee Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Houston, Texas 77002, by telephone at (713) 420– 3299, or by email tom_joyce@ kindermorgan.com; John E. Griffin, Assistant General Counsel, Tennessee Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Houston, Texas 77002, by telephone at (713) 420–5751, or by email at john_griffin2@ kindermorgan.com; or Debbie Kalisek, Regulatory Analyst, Tennessee Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Houston, Texas 77002, by telephone at (713) 420–3292, or by email at debbie_kalisek@ kindermorgan.com. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 49511 Secretary of the Commission. Environmental commenter’s will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenter’s will not be required to serve copies of filed documents on all other parties. However, the non-party commentary, will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE., Washington, DC 20426. Dated: August 15, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–19862 Filed 8–20–14; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OECA–2014–0523; FRL 9915–42– OECA] Agency Information Collection Activities; Proposed Collection; Comment Request; Air Stationary Source Compliance and Enforcement Information Reporting Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: In compliance with the Paperwork Reduction Act (PRA), this document announces that EPA is planning to submit a request to renew an existing approved Information Collection Request (ICR) to the Office of Management and Budget (OMB). This ICR is scheduled to expire on Jan 31, 2015. Before submitting the ICR to OMB for review and approval, EPA is soliciting comments on specific aspects of the proposed information collection as described below. DATES: Comments must be submitted on or before October 20, 2014. ADDRESSES: Submit your comments, identified by Docket ID No. EPA–HQ– SUMMARY: E:\FR\FM\21AUN1.SGM 21AUN1

Agencies

[Federal Register Volume 79, Number 162 (Thursday, August 21, 2014)]
[Notices]
[Pages 49510-49511]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-19860]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER14-2630-000]


Regulus Solar, LLC; Supplemental Notice That Initial Market-Based 
Rate Filing Includes Request for Blanket Section 204 Authorization

    This is a supplemental notice in the above-referenced proceeding of 
Regulus Solar, LLC's application for market-based rate authority, with 
an accompanying rate tariff, noting that such application includes a 
request for blanket authorization, under 18 CFR Part 34, of future 
issuances of securities and assumptions of liability.
    Any person desiring to intervene or to protest should file with the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426, in accordance with Rules 211 and 214 of the Commission's 
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone 
filing a motion to intervene or protest must serve a copy of that 
document on the Applicant.
    Notice is hereby given that the deadline for filing protests with 
regard to the applicant's request for blanket authorization, under 18 
CFR Part 34, of future issuances of securities and assumptions of 
liability, is September 4, 2014.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
5 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426.
    The filings in the above-referenced proceeding are accessible in 
the Commission's eLibrary system by clicking on the appropriate link in 
the above list. They are also available for electronic review in the 
Commission's Public Reference Room in Washington, DC. There is an 
eSubscription link on the Web site that enables subscribers to receive 
email notification when a document is added to a subscribed docket(s). 
For assistance with any FERC Online service, please email

[[Page 49511]]

FERCOnlineSupport@ferc.gov. or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

    Dated: August 15, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014-19860 Filed 8-20-14; 8:45 am]