Regulus Solar, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 49510-49511 [2014-19860]
Download as PDF
49510
Federal Register / Vol. 79, No. 162 / Thursday, August 21, 2014 / Notices
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the User’s Guide under
the ‘‘e-filing’’ link on the Commission’s
Web site.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site at www.ferc.gov using the
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and
enter the docket number, excluding the
last three digits in the Docket Number
field (i.e., CP14–514). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries, and direct links
to the documents. Go to www.ferc.gov/
docs-filing/esubscription.asp.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–19861 Filed 8–20–14; 8:45 am]
mstockstill on DSK4VPTVN1PROD with NOTICES
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. ER14–2630–000]
[Docket No. CP14–96–000]
Algonquin Gas Transmission, LLC;
Notice of Revised Public Comment
Meeting and Additional Public
Comment Meeting on the Draft
Environmental Impact Statement for
the Algonquin Incremental Market
Project
On August 6, 2014, the Federal
Energy Regulatory Commission (FERC
or Commission) issued the Draft
Environmental Impact Statement (EIS)
for the Algonquin Incremental Market
Project. The Draft EIS announced the
close of the comment period on
September 29, 2014 and identified four
public comment meetings. This notice
revises the date of the meeting to be
held in Cortlandt Manor, New York
from September 11, 2014 to September
15, 2014; and adds one new meeting in
Mapleville, Rhode Island on September
16, 2014. The other announced meetings
in Connecticut and Massachusetts will
be held at the dates, times, and locations
previously identified. The new meetings
noticed herein will begin at 6:30 p.m.
and are scheduled as follows:
Date
Location
Monday, September
15, 2014 (There is
NO meeting on
September 11,
2014).
Muriel H. Morabito
Community Center,
29 Westbrook
Drive, Cortlandt
Manor, NY 10567,
(914) 739–5845.
Crystal Lake Golf
Club, 100 Bronco
Highway,
Mapleville, RI
02839, (401) 567–
4500.
Tuesday, September
16, 2014.
This and all public meetings will be
posted on the Commission’s calendar
located at www.ferc.gov/EventCalendar/
EventsList.aspx along with other related
information. Additional information
about the project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site at www.ferc.gov using the
‘‘eLibrary’’ link and the project docket
number (i.e., CP–14–96).
Dated: August 15, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–19864 Filed 8–20–14; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
17:18 Aug 20, 2014
Jkt 232001
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
Regulus Solar, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Regulus
Solar, LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
Part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR Part 34, of
future issuances of securities and
assumptions of liability, is September 4,
2014.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
E:\FR\FM\21AUN1.SGM
21AUN1
Federal Register / Vol. 79, No. 162 / Thursday, August 21, 2014 / Notices
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: August 15, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014–19860 Filed 8–20–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–532–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Tennessee Gas Pipeline Company,
L.L.C.; Notice of Request Under
Blanket Authorization
Take notice that on August 8, 2014,
Tennessee Gas Pipeline Company,
L.L.C. (Tennessee), 1001 Louisiana
Street, Houston, Texas 77002, filed in
Docket No. CP14–532–000, a prior
notice request pursuant to sections
157.205 and 157.216 of the
Commission’s regulations under the
Natural Gas Act (NGA) as amended,
requesting authorization to abandon an
inactive injection and withdrawal well
(Well 4789) and related lateral pipeline
and appurtenances in the Hebron
Storage Field in Potter County,
Pennsylvania, all as more fully set forth
in the application which is on file with
the Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Specifically, Tennessee proposes to
plug and abandon Well 4789 and
abandon by removal the related well
head, a meter run, approximately 350
feet of 6-inch diameter lateral pipeline
and riser. Tennessee states that it has
made numerous attempts to clean and
repair Well 4789, which have proved
unsuccessful. Tennessee asserts that
Well 4789 is inactive and, due to its
mechanical condition, cannot be
utilized as an injection and withdrawal
well. Tennessee avers that the proposed
abandonment of Well 4789 will not
affect either the capacity or
deliverability of the Hebron Storage
Field and has not been used to provide
service to any customer for more than
12 months. Tennessee estimates the cost
of the proposed project to be $545,860.
VerDate Mar<15>2010
17:18 Aug 20, 2014
Jkt 232001
Any questions concerning this
application may be directed to Thomas
G. Joyce, Manager, Certificates,
Tennessee Gas Pipeline Company,
L.L.C., 1001 Louisiana Street, Houston,
Texas 77002, by telephone at (713) 420–
3299, or by email tom_joyce@
kindermorgan.com; John E. Griffin,
Assistant General Counsel, Tennessee
Gas Pipeline Company, L.L.C., 1001
Louisiana Street, Houston, Texas 77002,
by telephone at (713) 420–5751, or by
email at john_griffin2@
kindermorgan.com; or Debbie Kalisek,
Regulatory Analyst, Tennessee Gas
Pipeline Company, L.L.C., 1001
Louisiana Street, Houston, Texas 77002,
by telephone at (713) 420–3292, or by
email at debbie_kalisek@
kindermorgan.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
49511
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 7 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Dated: August 15, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–19862 Filed 8–20–14; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OECA–2014–0523; FRL 9915–42–
OECA]
Agency Information Collection
Activities; Proposed Collection;
Comment Request; Air Stationary
Source Compliance and Enforcement
Information Reporting
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
In compliance with the
Paperwork Reduction Act (PRA), this
document announces that EPA is
planning to submit a request to renew
an existing approved Information
Collection Request (ICR) to the Office of
Management and Budget (OMB). This
ICR is scheduled to expire on Jan 31,
2015. Before submitting the ICR to OMB
for review and approval, EPA is
soliciting comments on specific aspects
of the proposed information collection
as described below.
DATES: Comments must be submitted on
or before October 20, 2014.
ADDRESSES: Submit your comments,
identified by Docket ID No. EPA–HQ–
SUMMARY:
E:\FR\FM\21AUN1.SGM
21AUN1
Agencies
[Federal Register Volume 79, Number 162 (Thursday, August 21, 2014)]
[Notices]
[Pages 49510-49511]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-19860]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER14-2630-000]
Regulus Solar, LLC; Supplemental Notice That Initial Market-Based
Rate Filing Includes Request for Blanket Section 204 Authorization
This is a supplemental notice in the above-referenced proceeding of
Regulus Solar, LLC's application for market-based rate authority, with
an accompanying rate tariff, noting that such application includes a
request for blanket authorization, under 18 CFR Part 34, of future
issuances of securities and assumptions of liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR Part 34, of future issuances of securities and assumptions of
liability, is September 4, 2014.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426.
The filings in the above-referenced proceeding are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
eSubscription link on the Web site that enables subscribers to receive
email notification when a document is added to a subscribed docket(s).
For assistance with any FERC Online service, please email
[[Page 49511]]
FERCOnlineSupport@ferc.gov. or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Dated: August 15, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014-19860 Filed 8-20-14; 8:45 am]