Combined Notice of Filings, 49508 [2014-19859]

Download as PDF 49508 Federal Register / Vol. 79, No. 162 / Thursday, August 21, 2014 / Notices Dated: August 13, 2014. Nathaniel J. Davis, Sr., Deputy Secretary. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [FR Doc. 2014–19857 Filed 8–20–14; 8:45 am] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP14–514–000] BILLING CODE 6717–01–P [Project No. 13590–001] DEPARTMENT OF ENERGY Lockhart Power Company, Inc.; Notice of Availability of Final Environmental Assessment Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP11–1844–000. Applicants: Rockies Express Pipeline LLC. Description: Settlement Refund Report in RP11–1844, et al. Filed Date: 8/11/14. Accession Number: 20140811–5056. Comments Due: 5 p.m. ET 8/25/14. mstockstill on DSK4VPTVN1PROD with NOTICES Docket Numbers: RP14–1178–000. Applicants: Northern Natural Gas Company. Description: 20140812 Annual Carlton Requirements to be effective 11/ 1/2014. Filed Date: 8/12/14. Accession Number: 20140812–5040. Comments Due: 5 p.m. ET 8/25/14. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR § 385.211 and § 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated August 13, 2014. Nathaniel J. Davis, Sr., Deputy Secretary. In accordance with the National Environmental Policy Act of 1969 (NEPA) and the Federal Energy Regulatory Commission’s (Commission or FERC) regulations, 18 CFR pt. 380, the Office of Energy Projects has reviewed Lockhart Power Company, Inc.’s application for license for the Riverdale Hydroelectric Project (FERC Project No. 13590–001), located on the Enoree River, near the town of Enoree, in Spartanburg and Laurens Counties, South Carolina. The project does not occupy federal lands. Staff prepared a final environmental assessment (FEA), which analyzes the potential environmental effects of licensing the project, and concludes that licensing the project, with appropriate environmental protective measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the FEA is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ ferc.gov, at (866) 208–3676 (toll free), or, 202–502–8659 (TTY). You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. FOR FURTHER INFORMATION CONTACT: Sarah Salazar by phone at 202–502– 6863, or by email at sarah.salazar@ ferc.gov. Dated: August 15, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–19865 Filed 8–20–14; 8:45 am] [FR Doc. 2014–19859 Filed 8–20–14; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P VerDate Mar<15>2010 17:18 Aug 20, 2014 Jkt 232001 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 ANR Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the Proposed Sulphur Springs Compression Project and Request for Comments on Environmental Issues August 15, 2014. The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the Sulphur Springs Compression Project involving construction and operation of facilities by ANR Pipeline Company (ANR) in Henry County, Indiana. The Commission will use this EA in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies on the project. Your input will help the Commission staff determine what issues they need to evaluate in the EA. Please note that the scoping period will close on September 15, 2014. This notice is being sent to the Commission’s current environmental mailing list for this project. State and local government representatives should notify their constituents of this proposed project and encourage them to comment on their areas of concern. ANR provided landowners with a fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ This fact sheet addresses a number of typically-asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. It is also available for viewing on the FERC Web site (www.ferc.gov). Summary of the Proposed Project ANR proposes to construct and operate one new compressor unit and appurtenant facilities at its existing Sulphur Springs Compressor Station in Henry County, Indiana. The Sulphur Springs Compression Project would provide about 133.6 million standard cubic feet of natural gas per day to ANR’s wholly owned portion of the Lebanon Lateral which connects the Glen Karn meter facilities in Darke County, Ohio to the Sulphur Springs Compressor Station. E:\FR\FM\21AUN1.SGM 21AUN1

Agencies

[Federal Register Volume 79, Number 162 (Thursday, August 21, 2014)]
[Notices]
[Page 49508]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-19859]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

Filings Instituting Proceedings

    Docket Numbers: RP11-1844-000.
    Applicants: Rockies Express Pipeline LLC.
    Description: Settlement Refund Report in RP11-1844, et al.
    Filed Date: 8/11/14.
    Accession Number: 20140811-5056.
    Comments Due: 5 p.m. ET 8/25/14.

    Docket Numbers: RP14-1178-000.
    Applicants: Northern Natural Gas Company.
    Description: 20140812 Annual Carlton Requirements to be effective 
11/1/2014.
    Filed Date: 8/12/14.
    Accession Number: 20140812-5040.
    Comments Due: 5 p.m. ET 8/25/14.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR Sec.  385.211 and Sec.  385.214) on or 
before 5:00 p.m. Eastern time on the specified comment date. Protests 
may be considered, but intervention is necessary to become a party to 
the proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated August 13, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014-19859 Filed 8-20-14; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.