Alabama Power Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 49297-49298 [2014-19664]

Download as PDF Federal Register / Vol. 79, No. 161 / Wednesday, August 20, 2014 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. DI14–5–000] emcdonald on DSK67QTVN1PROD with NOTICES Cordova Electric Cooperative; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or Motions To Intervene Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Declaration of Intention. b. Docket No: DI14–05–000. c. Date Filed: July 18, 2014. d. Applicant: Cordova Electric Cooperative. e. Name of Project: Cordova Water and Power Hydroelectric Project. f. Location: The proposed Cordova Water and Power Project will be located on a Crater Lake outflow stream (Crater Creek), northeast of the city of Cordova, in the Valdez-Cordova Census Area, Alaska, affecting T. 15S, R. 3W, Copper River Meridian. g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 USC 817(b) (2012). h. Applicant Contact: Clay Koplin, P.E., CEO, Cordova Electric Cooperative, P.O Box 20, Cordova. Alaska, 99574– 0020, telephone: (907) 424–5026, email: ckoplin@cordovaelectric.com. i. FERC Contact: Any questions on this notice should be addressed to Jennifer Polardino, (202) 502–6437, or Email address: Jennifer.Polardino@ ferc.gov. j. Deadline for filing comments, protests, and/or motions is: September 12, 2014, 30 days from the issuance of this notice by the Commission. Comments, Motions to Intervene, and Protests may be filed electronically via the Internet. See 18 CFR 385.2001(a)(l)(iii) (2014) and the instructions on the Commission’s Web site under the ‘‘eFiling’’ link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. For more information on how to submit these types of filings, please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. Please include the docket number (DI14–5–000) on any comments, protests, and/or motions filed. k. Description of Project: The proposed Crater Lake Water and Power VerDate Mar<15>2010 16:44 Aug 19, 2014 Jkt 232001 Hydroelectric Project will consist of: (1) The natural reservoir of water in Crater Lake, with a current estimated capacity of 400 acre-feet; (2) a 20-foot-high, concrete dam at an elevation of 1,580 feet above mean sea level; (3) a 3,800foot-long, 1.05 diameter above-ground steel penstock; (4) a steel-frame powerhouse containing a single, onemegawatt generating unit rated at 1,450 feet of net head and a discharge of 2.85 cfs; (5) a tailrace that would extend approximately 20 yards south from the powerhouse to discharge into Crater Creek, a tributary of the Orca Inlet; (6) a short 1.47 kV three-phase transmission line conveying power to an existing 12.47 kV distribution line; (7) a pipe or channel conduit linking the powerhouse outflow with the water supply pipeline; (8) and appurtenant facilities. When a Declaration of Intention is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the project would affect the interests of interstate or foreign commerce. The Commission also determines whether or not the project: (1) Would be located on a navigable waterway; (2) would occupy public lands or reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4) would be located on a nonnavigable stream over which Congress has Commerce Clause jurisdiction and would be constructed or enlarged after 1935. l. Locations of the Application: Copies of this filing are on file with the Commission and are available for public inspection. This filing may be viewed on the Web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the Docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions To Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 49297 take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents—All filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTESTS’’, AND/OR ‘‘MOTIONS TO INTERVENE’’, as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any Motion to Intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments—Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Dated: August 12, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–19669 Filed 8–19–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2146–162] Alabama Power Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Shoreline Management Plan. b. Project No: 2146–162. c. Date Filed: June 19, 2014. d. Applicant: Alabama Power Company. e. Name of Project: Coosa River Hydroelectric Project. f. Location: Coosa River in Cherokee and Etowah Counties, Alabama and Floyd County, Georgia. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: David K. Anderson, Hydro Licensing Specialist, E:\FR\FM\20AUN1.SGM 20AUN1 emcdonald on DSK67QTVN1PROD with NOTICES 49298 Federal Register / Vol. 79, No. 161 / Wednesday, August 20, 2014 / Notices Alabama Power Company, 600 North 18th Street, P.O. Box 2641, Birmingham, AL 35291; Phone: (205) 257–1398. i. FERC Contact: Jon E. Cofrancesco at (202) 502–8951, or email: jon.cofrancesco@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: September 12, 2014. All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Please include the project number (P–2146–162) on any comments, motions, or recommendations filed. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: As required by article 414 of the license, Alabama Power Company requests Commission approval of a proposed shoreline management plan (SMP) for the project. The SMP defines shoreline management policies and classifications for the shorelines within the project boundary, identifies allowable uses within the shoreline areas, includes a shoreline use permitting and compliance program, and a public education and outreach program. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be VerDate Mar<15>2010 16:44 Aug 19, 2014 Jkt 232001 viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field (P–2146) to access the document. You may also register online at https://www.ferc.gov/ docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1– 866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. Agencies may obtain copies of the application directly from the applicant. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions To Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 Dated: August 13, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–19664 Filed 8–19–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG14–80–000. Applicants: Mountain Creek Power, LLC. Description: Mountain Creek Power, LLC’s Notice of Self-Certification as an Exempt Wholesale Generator. Filed Date: 8/11/14. Accession Number: 20140811–5088. Comments Due: 5 p.m. ET 9/2/14. Docket Numbers: EG14–81–000. Applicants: LaPorte Power, LLC. Description: LaPorte Power, LLC’s Notice of Self-Certification as an Exempt Wholesale Generator. Filed Date: 8/11/14. Accession Number: 20140811–5089. Comments Due: 5 p.m. ET 9/2/14. Docket Numbers: EG14–82–000. Applicants: Handley Power, LLC. Description: Handley Power LLC’s Notice of Certification as an Exempt Wholesale Generator. Filed Date: 8/11/14. Accession Number: 20140811–5090. Comments Due: 5 p.m. ET 9/2/14. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2881–015; ER10–2882–015; ER10–2883–015; ER10–2884–015; ER10–2885–015; ER10–2641–015; ER10–2663–015; ER10–2886–015; ER13–1101–010; ER13–1541–009; ER14–787–003. Applicants: Alabama Power Company, Southern Power Company, Mississippi Power Company, Georgia Power Company, Gulf Power Company, Oleander Power Project, Limited Partnership, Southern Company-Florida LLC, Southern Turner Cimarron I, LLC, Spectrum Nevada Solar, LLC, Campo Verde Solar, LLC, Macho Springs Solar, LLC. Description: Notification of NonMaterial of Change in Status of Alabama Power Company, et al. Filed Date: 8/11/14. Accession Number: 20140811–5038. Comments Due: 5 p.m. ET 9/2/14. Docket Numbers: ER13–1194–000; ER12–1303–000. E:\FR\FM\20AUN1.SGM 20AUN1

Agencies

[Federal Register Volume 79, Number 161 (Wednesday, August 20, 2014)]
[Notices]
[Pages 49297-49298]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-19664]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2146-162]


Alabama Power Company; Notice of Application Accepted for Filing, 
Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Shoreline Management Plan.
    b. Project No: 2146-162.
    c. Date Filed: June 19, 2014.
    d. Applicant: Alabama Power Company.
    e. Name of Project: Coosa River Hydroelectric Project.
    f. Location: Coosa River in Cherokee and Etowah Counties, Alabama 
and Floyd County, Georgia.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: David K. Anderson, Hydro Licensing 
Specialist,

[[Page 49298]]

Alabama Power Company, 600 North 18th Street, P.O. Box 2641, 
Birmingham, AL 35291; Phone: (205) 257-1398.
    i. FERC Contact: Jon E. Cofrancesco at (202) 502-8951, or email: 
jon.cofrancesco@ferc.gov.
    j. Deadline for filing comments, motions to intervene, and 
protests: September 12, 2014.
    All documents may be filed electronically via the Internet. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, 
or for TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail an original and seven copies to: Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426. 
Please include the project number (P-2146-162) on any comments, 
motions, or recommendations filed.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. Description of Request: As required by article 414 of the 
license, Alabama Power Company requests Commission approval of a 
proposed shoreline management plan (SMP) for the project. The SMP 
defines shoreline management policies and classifications for the 
shorelines within the project boundary, identifies allowable uses 
within the shoreline areas, includes a shoreline use permitting and 
compliance program, and a public education and outreach program.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at https://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field (P-2146) to access the document. You 
may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, call 1-866-
208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-
8659. A copy is also available for inspection and reproduction at the 
address in item (h) above. Agencies may obtain copies of the 
application directly from the applicant. Agencies may obtain copies of 
the application directly from the applicant.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions To Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO 
INTERVENE'' as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person commenting, protesting or intervening; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis. Any filing made by an intervenor must be accompanied 
by proof of service on all persons listed in the service list prepared 
by the Commission in this proceeding, in accordance with 18 CFR 
385.2010.

    Dated: August 13, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-19664 Filed 8-19-14; 8:45 am]
BILLING CODE 6717-01-P