DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. DI14–5–000]
emcdonald on DSK67QTVN1PROD with NOTICES
Cordova Electric Cooperative; Notice
of Declaration of Intention and
Soliciting Comments, Protests, and/or
Motions To Intervene
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Declaration of
Intention.
b. Docket No: DI14–05–000.
c. Date Filed: July 18, 2014.
d. Applicant: Cordova Electric
Cooperative.
e. Name of Project: Cordova Water
and Power Hydroelectric Project.
f. Location: The proposed Cordova
Water and Power Project will be located
on a Crater Lake outflow stream (Crater
Creek), northeast of the city of Cordova,
in the Valdez-Cordova Census Area,
Alaska, affecting T. 15S, R. 3W, Copper
River Meridian.
g. Filed Pursuant to: Section 23(b)(1)
of the Federal Power Act, 16 USC 817(b)
(2012).
h. Applicant Contact: Clay Koplin,
P.E., CEO, Cordova Electric Cooperative,
P.O Box 20, Cordova. Alaska, 99574–
0020, telephone: (907) 424–5026, email:
ckoplin@cordovaelectric.com.
i. FERC Contact: Any questions on
this notice should be addressed to
Jennifer Polardino, (202) 502–6437, or
Email address: Jennifer.Polardino@
ferc.gov.
j. Deadline for filing comments,
protests, and/or motions is: September
12, 2014, 30 days from the issuance of
this notice by the Commission.
Comments, Motions to Intervene, and
Protests may be filed electronically via
the Internet. See 18 CFR
385.2001(a)(l)(iii) (2014) and the
instructions on the Commission’s Web
site under the ‘‘eFiling’’ link. If unable
to be filed electronically, documents
may be paper-filed. To paper-file, an
original and eight copies should be
mailed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426. For more information on how to
submit these types of filings, please go
to the Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp.
Please include the docket number
(DI14–5–000) on any comments,
protests, and/or motions filed.
k. Description of Project: The
proposed Crater Lake Water and Power
VerDate Mar<15>2010
16:44 Aug 19, 2014
Jkt 232001
Hydroelectric Project will consist of: (1)
The natural reservoir of water in Crater
Lake, with a current estimated capacity
of 400 acre-feet; (2) a 20-foot-high,
concrete dam at an elevation of 1,580
feet above mean sea level; (3) a 3,800foot-long, 1.05 diameter above-ground
steel penstock; (4) a steel-frame
powerhouse containing a single, onemegawatt generating unit rated at 1,450
feet of net head and a discharge of 2.85
cfs; (5) a tailrace that would extend
approximately 20 yards south from the
powerhouse to discharge into Crater
Creek, a tributary of the Orca Inlet; (6)
a short 1.47 kV three-phase transmission
line conveying power to an existing
12.47 kV distribution line; (7) a pipe or
channel conduit linking the powerhouse
outflow with the water supply pipeline;
(8) and appurtenant facilities.
When a Declaration of Intention is
filed with the Federal Energy Regulatory
Commission, the Federal Power Act
requires the Commission to investigate
and determine if the project would
affect the interests of interstate or
foreign commerce. The Commission also
determines whether or not the project:
(1) Would be located on a navigable
waterway; (2) would occupy public
lands or reservations of the United
States; (3) would utilize surplus water
or water power from a government dam;
or (4) would be located on a nonnavigable stream over which Congress
has Commerce Clause jurisdiction and
would be constructed or enlarged after
1935.
l. Locations of the Application: Copies
of this filing are on file with the
Commission and are available for public
inspection. This filing may be viewed
on the Web at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the Docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions To
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
49297
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—All filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘PROTESTS’’, AND/OR ‘‘MOTIONS TO
INTERVENE’’, as applicable, and the
Docket Number of the particular
application to which the filing refers. A
copy of any Motion to Intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
p. Agency Comments—Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Dated: August 12, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–19669 Filed 8–19–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2146–162]
Alabama Power Company; Notice of
Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Shoreline
Management Plan.
b. Project No: 2146–162.
c. Date Filed: June 19, 2014.
d. Applicant: Alabama Power
Company.
e. Name of Project: Coosa River
Hydroelectric Project.
f. Location: Coosa River in Cherokee
and Etowah Counties, Alabama and
Floyd County, Georgia.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: David K.
Anderson, Hydro Licensing Specialist,
E:\FR\FM\20AUN1.SGM
20AUN1
emcdonald on DSK67QTVN1PROD with NOTICES
49298
Federal Register / Vol. 79, No. 161 / Wednesday, August 20, 2014 / Notices
Alabama Power Company, 600 North
18th Street, P.O. Box 2641, Birmingham,
AL 35291; Phone: (205) 257–1398.
i. FERC Contact: Jon E. Cofrancesco at
(202) 502–8951, or email:
jon.cofrancesco@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
September 12, 2014.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Secretary,
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426. Please include the project
number (P–2146–162) on any
comments, motions, or
recommendations filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: As required
by article 414 of the license, Alabama
Power Company requests Commission
approval of a proposed shoreline
management plan (SMP) for the project.
The SMP defines shoreline management
policies and classifications for the
shorelines within the project boundary,
identifies allowable uses within the
shoreline areas, includes a shoreline use
permitting and compliance program,
and a public education and outreach
program.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
VerDate Mar<15>2010
16:44 Aug 19, 2014
Jkt 232001
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field (P–2146) to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, call 1–
866–208–3676 or email
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above. Agencies may obtain copies of
the application directly from the
applicant. Agencies may obtain copies
of the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions To
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
Dated: August 13, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–19664 Filed 8–19–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG14–80–000.
Applicants: Mountain Creek Power,
LLC.
Description: Mountain Creek Power,
LLC’s Notice of Self-Certification as an
Exempt Wholesale Generator.
Filed Date: 8/11/14.
Accession Number: 20140811–5088.
Comments Due: 5 p.m. ET 9/2/14.
Docket Numbers: EG14–81–000.
Applicants: LaPorte Power, LLC.
Description: LaPorte Power, LLC’s
Notice of Self-Certification as an Exempt
Wholesale Generator.
Filed Date: 8/11/14.
Accession Number: 20140811–5089.
Comments Due: 5 p.m. ET 9/2/14.
Docket Numbers: EG14–82–000.
Applicants: Handley Power, LLC.
Description: Handley Power LLC’s
Notice of Certification as an Exempt
Wholesale Generator.
Filed Date: 8/11/14.
Accession Number: 20140811–5090.
Comments Due: 5 p.m. ET 9/2/14.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2881–015;
ER10–2882–015; ER10–2883–015;
ER10–2884–015; ER10–2885–015;
ER10–2641–015; ER10–2663–015;
ER10–2886–015; ER13–1101–010;
ER13–1541–009; ER14–787–003.
Applicants: Alabama Power
Company, Southern Power Company,
Mississippi Power Company, Georgia
Power Company, Gulf Power Company,
Oleander Power Project, Limited
Partnership, Southern Company-Florida
LLC, Southern Turner Cimarron I, LLC,
Spectrum Nevada Solar, LLC, Campo
Verde Solar, LLC, Macho Springs Solar,
LLC.
Description: Notification of NonMaterial of Change in Status of Alabama
Power Company, et al.
Filed Date: 8/11/14.
Accession Number: 20140811–5038.
Comments Due: 5 p.m. ET 9/2/14.
Docket Numbers: ER13–1194–000;
ER12–1303–000.
E:\FR\FM\20AUN1.SGM
20AUN1
Agencies
[Federal Register Volume 79, Number 161 (Wednesday, August 20, 2014)]
[Notices]
[Pages 49297-49298]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-19664]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2146-162]
Alabama Power Company; Notice of Application Accepted for Filing,
Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Shoreline Management Plan.
b. Project No: 2146-162.
c. Date Filed: June 19, 2014.
d. Applicant: Alabama Power Company.
e. Name of Project: Coosa River Hydroelectric Project.
f. Location: Coosa River in Cherokee and Etowah Counties, Alabama
and Floyd County, Georgia.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: David K. Anderson, Hydro Licensing
Specialist,
[[Page 49298]]
Alabama Power Company, 600 North 18th Street, P.O. Box 2641,
Birmingham, AL 35291; Phone: (205) 257-1398.
i. FERC Contact: Jon E. Cofrancesco at (202) 502-8951, or email:
jon.cofrancesco@ferc.gov.
j. Deadline for filing comments, motions to intervene, and
protests: September 12, 2014.
All documents may be filed electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Secretary, Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426.
Please include the project number (P-2146-162) on any comments,
motions, or recommendations filed.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Request: As required by article 414 of the
license, Alabama Power Company requests Commission approval of a
proposed shoreline management plan (SMP) for the project. The SMP
defines shoreline management policies and classifications for the
shorelines within the project boundary, identifies allowable uses
within the shoreline areas, includes a shoreline use permitting and
compliance program, and a public education and outreach program.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field (P-2146) to access the document. You
may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, call 1-866-
208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-
8659. A copy is also available for inspection and reproduction at the
address in item (h) above. Agencies may obtain copies of the
application directly from the applicant. Agencies may obtain copies of
the application directly from the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions To Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: August 13, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-19664 Filed 8-19-14; 8:45 am]