Seminole Electric Cooperative, Inc. Florida Municipal Power Agency v. Duke Energy Florida; Notice of Complaint, 49301-49302 [2014-19663]

Download as PDF emcdonald on DSK67QTVN1PROD with NOTICES Federal Register / Vol. 79, No. 161 / Wednesday, August 20, 2014 / Notices Filed Date: 8/12/14. Accession Number: 20140812–5001. Comments Due: 5 p.m. ET 9/2/14. Docket Numbers: ER14–2632–000. Applicants: Delmarva Power & Light Company. Description: Market-Based Rate Tariff Revisions to be effective 8/12/2014. Filed Date: 8/12/14. Accession Number: 20140812–5002. Comments Due: 5 p.m. ET 9/2/14. Docket Numbers: ER14–2633–000. Applicants: Potomac Electric Power Company. Description: Market-Based Rate Tariff Revisions to be effective 8/12/2014. Filed Date: 8/12/14. Accession Number: 20140812–5003. Comments Due: 5 p.m. ET 9/2/14. Docket Numbers: ER14–2634–000. Applicants: Potomac Power Resources, LLC. Description: Market-Based Rate Tariff Revisions and Notice of Succession to be effective 8/12/2014. Filed Date: 8/12/14. Accession Number: 20140812–5004. Comments Due: 5 p.m. ET 9/2/14. Docket Numbers: ER14–2635–000. Applicants: Bethlehem Renewable Energy, LLC. Description: Market-Based Rate Tariff Revisions to be effective 8/12/2014. Filed Date: 8/12/14. Accession Number: 20140812–5005. Comments Due: 5 p.m. ET 9/2/14. Docket Numbers: ER14–2636–000. Applicants: Fauquier Landfill Gas, LLC. Description: Market-Based Rate Tariff Revisions to be effective 8/12/2014. Filed Date: 8/12/14. Accession Number: 20140812–5006. Comments Due: 5 p.m. ET 9/2/14. Docket Numbers: ER14–2637–000. Applicants: Eastern Landfill Gas, LLC. Description: Market-Based Rate Tariff Revisions to be effective 8/12/2014. Filed Date: 8/12/14. Accession Number: 20140812–5007. Comments Due: 5 p.m. ET 9/2/14. Docket Numbers: ER14–2638–000. Applicants: Pepco Energy Services, Inc. Description: Market-Based Rate Tariff Revisions to be effective 8/12/2014. Filed Date: 8/12/14. Accession Number: 20140812–5041. Comments Due: 5 p.m. ET 9/2/14. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s VerDate Mar<15>2010 16:44 Aug 19, 2014 Jkt 232001 Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 12, 2014. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2014–19656 Filed 8–19–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: PR14–48–000. Applicants: Kinder Morgan Keystone Gas Storage LLC. Description: Tariff filing per 284.123(e) + (g): Name Change Filing to be effective 8/1/2014 TOFC: 1280. Filed Date: 8/7/14. Accession Number: 20140807–5130. Comments Due: 5 p.m. ET 8/28/14. 284.123(g) Protests Due: 5 p.m. ET 10/ 6/14. Docket Numbers: RP14–1173–000. Applicants: Eastern Shore Natural Gas Company. Description: Off Peak Firm Transportation to be effective 8/7/2014. Filed Date: 8/7/14. Accession Number: 20140807–5063. Comments Due: 5 p.m. ET 8/19/14. Docket Numbers: RP14–1174–000. Applicants: Transcontinental Gas Pipe Line Company. Description: Report of Refund Transco’s GSS LSS Customer Share of DTI Penalty Revenue 2014. Filed Date: 8/7/14. Accession Number: 20140807–5094. Comments Due: 5 p.m. ET 8/19/14. Docket Numbers: RP14–1175–000. Applicants: Dauphin Island Gathering Partners. Description: Negotiated Rate Filing 8– 7–14 to be effective 9/1/2014. Filed Date: 8/7/14. Accession Number: 20140807–5148. PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 49301 Comments Due: 5 p.m. ET 8/19/14. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the comment date(s). Protests may be considered, but intervention is necessary to become a party to the proceeding. Filings in Existing Proceedings Docket Numbers: RP14–1049–001. Applicants: American Midstream (Midla), LLC. Description: Midla Compliance Filing in RP14–1049 to be effective 7/17/2014. Filed Date: 8/7/14. Accession Number: 20140807–5129. Comments Due: 5 p.m. ET 8/19/14. Any person desiring to protest in any of the above proceedings must file in accordance with Rule 211 of the Commission’s Regulations (18 CFR § 385.211) on or before 5:00 p.m. Eastern time on the specified comment date. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 11, 2014. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2014–19658 Filed 8–19–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL14–90–000] Seminole Electric Cooperative, Inc. Florida Municipal Power Agency v. Duke Energy Florida; Notice of Complaint Take notice that on August 12, 2014, pursuant to Rule 206 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.206, and sections 206, 306, and 309 of the Federal Power Act, 16 U.S.C. 824(e), 825(e), and 825(h), Seminole Electric Cooperative, Inc. and Florida Municipal Power Agency (Complainants) filed a formal complaint against Duke Energy E:\FR\FM\20AUN1.SGM 20AUN1 emcdonald on DSK67QTVN1PROD with NOTICES 49302 Federal Register / Vol. 79, No. 161 / Wednesday, August 20, 2014 / Notices Florida (Respondent) alleging that the return on equity (ROE) in the Respondent’s transmission formula rate is unjust and unreasonable and should be replaced with a just and reasonable ROE. Complainants certify that copies of the complaint were served on the contacts for Respondent as listed on the Commission’s list of Corporate Officials. In addition, as a courtesy, the Florida Public Service Commission was also served with a copy of the complaint. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on September 2, 2014. Dated: August 13, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–19663 Filed 8–19–14; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 16:44 Aug 19, 2014 Jkt 232001 Dated: August 14, 2014. Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [FR Doc. 2014–19751 Filed 8–19–14; 8:45 am] BILLING CODE 6717–01–P [Docket No. ID–7500–000] Harris, Kimberly J.; Notice of Filing DEPARTMENT OF ENERGY Take notice that on August 13, 2014, Kimberly J. Harris submitted for filing, an application for authority to hold interlocking positions, pursuant to section 305(b) of the Federal Power Act (FPA), 16 U.S.C. 825d(b), Part 45 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR Part 45, and Order No. 664.1 Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on September 3, 2014. Federal Energy Regulatory Commission 1 Commission Authorization to Hold Interlocking Positions, 112 FERC ¶ 61,298 (2005) (Order No. 664); order on reh’g, 114 FERC ¶ 61,142 (2006) (Order No. 664–A). PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 [Docket No. AD14–14–000] Price Formation in Energy and Ancillary Services Markets Operated by Regional Transmission Organizations and Independent System Operators; Supplemental Notice of Workshop on Price Formation and Issuance of Report on Uplift in RTO and ISO Markets As announced in a Notice issued on July 9, 2014, the Federal Energy Regulatory Commission (Commission) will hold a workshop on Monday, September 8, 2014 to commence a discussion with industry on uplift payments in energy and ancillary service markets operated by the Regional Transmission Organizations and Independent System Operators (RTOs/ISOs). The workshop will commence at 8:45 a.m. and conclude at 5:15 p.m. and be held at the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This workshop is free of charge and open to the public. Commission members may participate in the workshop. The agenda and a list of participants for this workshop are attached. A report on uplift in RTO/ISO markets has been posted to the Commission Web site at: https://www.ferc.gov/legal/staff-reports/ 2014/08-13-14-uplift.pdf. Those who plan to attend the workshop are encouraged to complete the registration form located at: https://www.ferc.gov/whats-new/ registration/09-08-14-form.asp. There is no registration deadline. The workshop will be transcribed. Transcripts of the workshop will be available for a fee from Ace-Federal Reporters, Inc. (202–347–3700 or 1–800–336–6646). Additionally, there will be a free webcast of the workshop. The webcast will allow persons to listen to the workshop but not participate. Anyone with Internet access who wants to listen to the workshop can do so by navigating to the Calendar of Events at www.ferc.gov, locating the technical workshop in the Calendar, and clicking on the webcast link. The Capitol Connection provides technical support for the webcast and offers the option of E:\FR\FM\20AUN1.SGM 20AUN1

Agencies

[Federal Register Volume 79, Number 161 (Wednesday, August 20, 2014)]
[Notices]
[Pages 49301-49302]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-19663]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL14-90-000]


Seminole Electric Cooperative, Inc. Florida Municipal Power 
Agency v. Duke Energy Florida; Notice of Complaint

    Take notice that on August 12, 2014, pursuant to Rule 206 of the 
Federal Energy Regulatory Commission's (Commission) Rules of Practice 
and Procedure, 18 CFR 385.206, and sections 206, 306, and 309 of the 
Federal Power Act, 16 U.S.C. 824(e), 825(e), and 825(h), Seminole 
Electric Cooperative, Inc. and Florida Municipal Power Agency 
(Complainants) filed a formal complaint against Duke Energy

[[Page 49302]]

Florida (Respondent) alleging that the return on equity (ROE) in the 
Respondent's transmission formula rate is unjust and unreasonable and 
should be replaced with a just and reasonable ROE.
    Complainants certify that copies of the complaint were served on 
the contacts for Respondent as listed on the Commission's list of 
Corporate Officials. In addition, as a courtesy, the Florida Public 
Service Commission was also served with a copy of the complaint.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. The Respondent's 
answer and all interventions, or protests must be filed on or before 
the comment date. The Respondent's answer, motions to intervene, and 
protests must be served on the Complainants.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for electronic review in the 
Commission's Public Reference Room in Washington, DC. There is an 
``eSubscription'' link on the Web site that enables subscribers to 
receive email notification when a document is added to a subscribed 
docket(s). For assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on September 2, 2014.

    Dated: August 13, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-19663 Filed 8-19-14; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.