Wister Lake Power, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 46797-46798 [2014-18889]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 79, No. 154 / Monday, August 11, 2014 / Notices
that wish to cooperate in the
preparation of the environmental
document should file a request to do so
by September 3, 2014. The Commission
strongly encourages electronic filing.
Please file your request using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. In
lieu of electronic filing, please send a
paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. Your filing
must include on the first page, the
project name (Kentucky River Lock &
Dam No. 11 Hydroelectric Project) and
number (P–14276–001), and bear the
heading: ‘‘Request to be a Cooperating
Agency.’’
Cooperating agencies should note the
Commission’s policy that agencies that
cooperate in the preparation of the
environmental document cannot also
intervene. See 94 FERC ¶ 61,076 (2001).
l. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, part 402; and NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920. We are
also initiating consultation with the
Kentucky State Historic Preservation
Officer, as required by section 106,
National Historical Preservation Act,
and the implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
m. With this notice, we are
designating FFP as the Commission’s
non-federal representative for carrying
out informal consultation pursuant to
section 7 of the Endangered Species Act
and section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act; and consultation
pursuant to section 106 of the National
Historic Preservation Act.
n. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: August 4, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–18885 Filed 8–8–14; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
17:35 Aug 08, 2014
Jkt 232001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commissioner and Staff
Attendance at North American Electric
Reliability Corporation Meetings
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the Commission
and/or Commission staff may attend the
following meetings:
North American Electric Reliability
Corporation
Member Representatives Committee and
Board of Trustees Meetings
Board of Trustees Corporate Governance
and Human Resources Committee,
Finance and Audit Committee,
Compliance Committee, and
Standards Oversight and Technology
Committee Meetings
The Westin Bayshore, 1601 Bayshore
Drive, Vancouver, BC V6G 2V4
Canada
August 13 (7:30 a.m.–5:00 p.m.) and
August 14 (8:30 a.m.–12:00 p.m.), 2014
Further information regarding these
meetings may be found at: https://
www.nerc.com/Pages/Calendar.aspx.
The discussions at the meetings,
which are open to the public, may
address matters at issue in the following
Commission proceedings:
Docket No. RD14–4, North American
Electric Reliability Corporation
Docket No. RR13–9, North American
Electric Reliability Corporation
Docket No. RR14–5, North American
Electric Reliability Corporation
For further information, please
contact Jonathan First, 202–502–8529,
or jonathan.first@ferc.gov.
Dated: July 31, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–18896 Filed 8–8–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14591–000]
Wister Lake Power, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On February 28, 2014, Wister Lake
Power, LLC filed an application for a
preliminary permit, pursuant to section
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
46797
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of a
hydropower project to be located at the
U.S. Army Corps of Engineers’ (Corps)
Wister Lake, on the Poteau River near
the town of Poteau in LeFlore County,
Oklahoma. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) Five 48 inch-diameter,
300-foot-long steel penstocks; (2) five
inline generation units with a total
capacity of 6-megawatts; (3) a
switchyard on the south bank adjacent
to the dam; (4) a 1-mile-long, 15kV
transmission line.
The project would have an average
annual generation of 16,000 megawatthours and operate utilizing surplus
water from the Wister Lake, as directed
by the Corps.
´
Applicant Contact: Mr. Magnus
´
Johannesson, Wister Power, LLC, 46
Peninsula Center, Suite E, Rolling Hills
Estates, CA 90274. (310) 699–6400.
FERC Contact: Christiane Casey,
christiane.casey@ferc.gov, (202) 502–
8577.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and five copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
E:\FR\FM\11AUN1.SGM
11AUN1
46798
Federal Register / Vol. 79, No. 154 / Monday, August 11, 2014 / Notices
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14591) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: August 4, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–18889 Filed 8–8–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–526–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
WBI Energy Transmission, Inc.; Notice
of Request Under Blanket
Authorization
Take notice that on July 24, 2014, WBI
Energy Transmission, Inc., (WBI
Energy), 1250 West Century Avenue,
Bismarck, North Dakota 58503 filed in
Docket No. CP14–526–000, a prior
notice request pursuant to sections
157.205(b), 157.208(a) and 157.211
(a)(2)of the Commission’s regulations
under the Natural Gas Act for
authorization to construct and operate
new delivery point facilities in Stark
County, North Dakota. The new lateral
will be approximately 11,400 feet of 6inch diameter pipe and a measurement
station delivering up to 7,200 Mcf/day
to Red Trail Energy, L.L.C. The delivery
point facilities will constitute a bypass
of Montana-Dakota Utilities Company, a
local distribution company, all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
Application should be directed to Keith
A. Tiggelaar, Director of Regulatory
Affairs, WBI Energy Transmission, Inc.,
1250 West Century Avenue, Bismarck,
North Dakota 58503, or by calling (701)
530–1560, or by email at
keith.tiggelaar@wbienergy.com.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
VerDate Mar<15>2010
17:35 Aug 08, 2014
Jkt 232001
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with he Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link. Persons
unable to file electronically should
submit original and 5 copies of the
protest or intervention to the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Dated: August 1, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–18886 Filed 8–8–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Western Area Power Administration
Pick-Sloan Missouri Basin Program—
Eastern Division—Rate Order No.
WAPA–168
Western Area Power
Administration, DOE.
ACTION: Notice of Proposed Extension of
Transmission and Ancillary Services
Formula Rates.
AGENCY:
The Western Area Power
Administration (Western), a power
marketing administration within the
Department of Energy (DOE), is
proposing to extend the existing
transmission and ancillary services rates
for the Pick-Sloan Missouri Basin
Program—Eastern Division (P–SMB—
ED) through December 31, 2016. The
existing Rate Schedules UGP–NT1,
UGP–FPT1, UGP–NFPT1, UGP–AS1,
UGP–AS2, UGP–AS3, UGP–AS4, UGP–
AS5, UGP–AS6, UGP–AS7, and UGP–
TSP1 expire on December 31, 2014.
Publication of this Federal Register
notice begins the formal process for the
proposed extension of the formulary
rates.
SUMMARY:
A consultation and comment
period will end on September 10, 2014.
Western will accept oral and written
comments any time during the
consultation and comment period. In
accordance with 10 CFR 903.23(a),
Western has determined it is not
necessary to hold a public information
or public comment forum.
ADDRESSES: Send written comments to:
Mr. Robert J. Harris, Regional Manager,
Upper Great Plains Region, Western
Area Power Administration, 2900 4th
Avenue North, Billings, Montana
59101–1266; or email: UGPISRate@
wapa.gov. Written comments may also
be faxed to: (406) 255–2900, attention:
Linda Cady-Hoffman, Rates Manager.
Western will post official comments
received via letter, fax, and email to its
DATES:
E:\FR\FM\11AUN1.SGM
11AUN1
Agencies
[Federal Register Volume 79, Number 154 (Monday, August 11, 2014)]
[Notices]
[Pages 46797-46798]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-18889]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14591-000]
Wister Lake Power, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On February 28, 2014, Wister Lake Power, LLC filed an application
for a preliminary permit, pursuant to section 4(f) of the Federal Power
Act (FPA), proposing to study the feasibility of a hydropower project
to be located at the U.S. Army Corps of Engineers' (Corps) Wister Lake,
on the Poteau River near the town of Poteau in LeFlore County,
Oklahoma. The sole purpose of a preliminary permit, if issued, is to
grant the permit holder priority to file a license application during
the permit term. A preliminary permit does not authorize the permit
holder to perform any land-disturbing activities or otherwise enter
upon lands or waters owned by others without the owners' express
permission.
The proposed project would consist of the following: (1) Five 48
inch-diameter, 300-foot-long steel penstocks; (2) five inline
generation units with a total capacity of 6-megawatts; (3) a switchyard
on the south bank adjacent to the dam; (4) a 1-mile-long, 15kV
transmission line.
The project would have an average annual generation of 16,000
megawatt-hours and operate utilizing surplus water from the Wister
Lake, as directed by the Corps.
Applicant Contact: Mr. Magn[uacute]s J[oacute]hannesson, Wister
Power, LLC, 46 Peninsula Center, Suite E, Rolling Hills Estates, CA
90274. (310) 699-6400.
FERC Contact: Christiane Casey, christiane.casey@ferc.gov, (202)
502-8577.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and five copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
[[Page 46798]]
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14591) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: August 4, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-18889 Filed 8-8-14; 8:45 am]