In the Matter of Geisser Engineering Corporation, 46469-46472 [2014-18815]
Download as PDF
46469
Federal Register / Vol. 79, No. 153 / Friday, August 8, 2014 / Notices
NUCLEAR REGULATORY
COMMISSION
[NRC–2014–0163]
Setpoints for Safety-Related
Instrumentation
Nuclear Regulatory
Commission.
ACTION: Draft regulatory guide;
extension of comment period and
correction.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is correcting a notice
that was published in the Federal
Register (FR) on July 11, 2014,
announcing the release of draft
regulatory guide (DG), DG–1141,
‘‘Setpoints for Safety-Related
Instrumentation,’’ for a 60 day public
comment period. This action is being
taken to correct the Agencywide
Documents Access and Management
System (ADAMS) Accession number for
DG–1141. The document at the
corrected ADAMS number includes
editorial changes that were not included
in the previously referenced version of
DG–1141, but there are no technical
changes. Due to this error, the NRC is
extending the comment period from
September 9, 2014, to October 10, 2014.
DATES: This correction is effective
immediately. Submit comments by
October 10, 2014. Comments received
after this date will be considered if
practical to do so, but the NRC is able
to ensure consideration only for
comments received on or before this
date.
SUMMARY:
Please refer to Docket ID
NRC–2014–0163 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2014–0163. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–287–3422;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual(s) listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The draft
regulatory guide is available
electronically in ADAMS under
Accession No. ML081630179. The
regulatory analysis may be found in
ADAMS under Accession No.
ML101820157.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Paul
J. Rebstock, telephone: 301–415–7000,
email: paul.rebstock@nrc.gov or Mark
Orr, telephone: 301–415–7000, email:
Mark.Orr@nrc.gov, both of the Office of
Nuclear Regulatory Research, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001.
SUPPLEMENTARY INFORMATION: In the FR
on July 11, 2014, in FR Doc. 2014–
16165, on page 40164, in the first
column, third paragraph under the
heading ‘‘I. Obtaining Information and
Submitting Comments,’’ the ADAMS
Accession number ‘‘ML14149A361’’ is
corrected to read ‘‘ML081630179.’’
Dated at Rockville, Maryland, this 31st day
of July 2014.
For the Nuclear Regulatory Commission.
Thomas H. Boyce,
Chief, Regulatory Guidance and Generic
Issues Branch, Division of Engineering, Office
of Nuclear Regulatory Research.
[FR Doc. 2014–18757 Filed 8–7–14; 8:45 am]
BILLING CODE 7590–01–P
mstockstill on DSK4VPTVN1PROD with NOTICES
ADDRESSES:
VerDate Mar<15>2010
16:51 Aug 07, 2014
Jkt 232001
Dated at Rockville, Maryland, this 31st day
of July 2014.
For the Nuclear Regulatory Commission.
Patricia K. Holahan,
Acting Director, Office of Enforcement.
NUCLEAR REGULATORY
COMMISSION
[EA–13–105; NRC–2014–0186]
In the Matter of Geisser Engineering
Corporation
Nuclear Regulatory
Commission.
ACTION: Order; issuance.
AGENCY:
PO 00000
Frm 00075
Fmt 4703
Sfmt 4703
UNITED STATES OF AMERICA
NUCLEAR REGULATORY
COMMISSION
In the Matter of:
The U.S. Nuclear Regulatory
Commission (NRC) is issuing an order
imposing a civil monetary penalty to
Geisser Engineering Corporation. The
order requires Geisser Engineering
Corporation to pay a civil penalty in the
amount of $8,400.
DATES: Effective Date: See attachment.
ADDRESSES: Please refer to Docket ID
NRC–2014–0186 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this action by the
following methods:
SUMMARY:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2014–0186. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–287–3422;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may access publicly
available documents online in the NRC
Library at https://www.nrc.gov/readingrm/adams.html. To begin the search,
select ‘‘ADAMS Public Documents’’ and
then select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced in this document
(if that document is available in
ADAMS) is provided the first time that
a document is referenced.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT:
Thomas Marenchin, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001; telephone: 301–415–
2979, email: Thomas.Marenchin@
nrc.gov.
SUPPLEMENTARY INFORMATION: The text of
the Order and appendix are attached.
Geisser Engineering
Corporation)
Riverside, Rhode Island
Docket No. 15000038
License No.: RI 3L–
050–01 EA–13–
105
ORDER IMPOSING CIVIL MONETARY
PENALTY
I
Geisser Engineering Corporation
(GEC) is the holder of a materials license
issued by the State of Rhode Island, an
NRC Agreement State. The Rhode Island
license authorizes the possession, use,
and storage of portable moisture density
gauges containing radioactive material
E:\FR\FM\08AUN1.SGM
08AUN1
46470
Federal Register / Vol. 79, No. 153 / Friday, August 8, 2014 / Notices
within the State of Rhode Island. GEC,
as holder of a State license, may perform
work authorized by its license in other
States or Federal jurisdictions provided
GEC files for reciprocity with the
appropriate regulatory authority.
mstockstill on DSK4VPTVN1PROD with NOTICES
II
An inspection of the GEC’s activities
was conducted on May 9, 2012, with
continued in-office review through
August 15, 2013. The inspection
identified one violation involving
multiple examples of GEC’s failure to
file for reciprocity with the U.S. Nuclear
Regulatory Commission (NRC) prior to
conducting work in NRC jurisdiction. In
addition to the inspection activities, the
NRC Office of Investigations conducted
an investigation to determine whether a
senior official of GEC deliberately
engaged in the use of licensed material
in areas of NRC jurisdiction without
filing for reciprocity. The investigation
concluded that the president and owner
of GEC deliberately engaged in the use
of licensed material in the State of
Connecticut and at the Newport Naval
Station in Rhode Island, areas of NRC
jurisdiction, without filing for
reciprocity with the NRC. A written
Notice of Violation and Proposed
Imposition of Civil Penalty (Notice) was
served upon GEC by letter dated March
20, 2014. The Notice states the nature of
the violation, the provision of the NRC’s
requirements that GEC violated, and the
amount of the civil penalty proposed for
the violation. GEC responded to the
Notice in a letter dated April 15, 2014.
In its response and in subsequent
communications with the NRC, GEC
acknowledged the violation, but
disputed the willful aspect of the
violation (the willful aspect of the
violation will be addressed in a separate
correspondence) and requested that the
NRC mitigate the civil penalty.
Specifically, in an email
correspondence dated April 30, 2014,
the president of GEC stated, in part, that
GEC was seeking relief from the
proposed civil penalty due to the
unexpected payment of a fine to the
Commonwealth of Massachusetts
(Commonwealth) for GEC’s failure to
file for reciprocity prior to using a
nuclear density gauge in the
Commonwealth’s jurisdiction. The
president also stated that payment of the
proposed NRC civil penalty would pose
a financial hardship for GEC.
III
After consideration of GEC’s response
and statement of fact, explanation, and
argument for mitigation contained
therein, the NRC has determined, as set
forth in the Appendix to this Order,
VerDate Mar<15>2010
16:51 Aug 07, 2014
Jkt 232001
there is an adequate basis to reduce the
civil penalty for the associated NRC
violation, that the violation occurred as
stated, that the amount of the proposed
penalty should be reduced by $2800
(25%), and a civil penalty in the amount
of $8,400 should be imposed.
IV
In view of the foregoing and pursuant
to Section 234 of the Atomic Energy Act
of 1954, as amended (Act), 42 U.S.C.
2282, and 10 CFR 2.205, IT IS HEREBY
ORDERED THAT: GEC pay a civil
penalty in the amount of $8,400 within
30 days of the date of this Order, in
accordance with NUREG/BR–0254. In
addition, at the time payment is made,
GEC shall submit a statement indicating
when and by what method payment was
made, to the Director, Office of
Enforcement, U.S. Nuclear Regulatory
Commission, One White Flint North,
11555 Rockville Pike, Rockville, MD
20852–2738.
V
In accordance with Title 10 of the
Code of Federal Regulations (10 CFR)
2.202, GEC must, and any other person
adversely affected by this Order may,
submit an answer to this Order within
30 days of the date of this Order. In
addition, GEC may demand a hearing on
all or part of this Order. Any other
person adversely affected by this Order
may request a hearing on this Order
within 30 days of the date of this Order.
Where good cause is shown,
consideration will be given to extending
the time to answer or request a hearing.
A request for extension of time must be
directed to the Director, Office of
Enforcement, NRC, and include a
statement of good cause for the
extension.
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing, a petition for leave
to intervene, any motion or other
document filed in the proceeding prior
to the submission of a request for
hearing or petition to intervene, and
documents filed by interested
governmental entities participating
under 10 CFR 2.315(c), must be filed in
accordance with the NRC E-Filing rule
(72 FR 49139, August 28, 2007, as
amended by 77 FR 46562, August 3,
2012), codified in pertinent part at 10
CFR Part 2, Subpart C. The E-Filing
process requires participants to submit
and serve all adjudicatory documents
over the internet, or in some cases to
mail copies on electronic storage media.
Participants may not submit paper
copies of their filings unless they seek
an exemption in accordance with the
procedures described below.
PO 00000
Frm 00076
Fmt 4703
Sfmt 4703
To comply with the procedural
requirements of E-Filing, at least 10
days prior to the filing deadline, the
participant should contact the Office of
the Secretary by email at
hearing.docket@nrc.gov, or by telephone
at (301) 415–1677, to request (1) a
digital ID certificate, which allows the
participant (or its counsel or
representative) to digitally sign
documents and access the E-Submittal
server for any proceeding in which it is
participating; and (2) advise the
Secretary that the participant will be
submitting a request or petition for
hearing (even in instances in which the
participant, or its counsel or
representative, already holds an NRCissued digital ID certificate). Based upon
this information, the Secretary will
establish an electronic docket for the
hearing in this proceeding if the
Secretary has not already established an
electronic docket.
Information about applying for a
digital ID certificate is available on
NRC’s public Web site at https://
www.nrc.gov/site-help/e-submittals/
getting-started.html. System
requirements for accessing the ESubmittal server are detailed in NRC’s
‘‘Guidance for Electronic Submission,’’
which is available on the agency’s
public Web site at https://www.nrc.gov/
site-help/e-submittals.html. Participants
may attempt to use other software not
listed on the Web site, but should note
that the NRC’s E-Filing system does not
support unlisted software, and the NRC
Meta System Help Desk will not be able
to offer assistance in using unlisted
software.
If a participant is electronically
submitting a document to the NRC in
accordance with the E-Filing rule, the
participant must file the document
using the NRC’s online, Web-based
submission form available from the
NRC’s Electronic Information Exchange
(EIE). In order to serve documents
through EIE, users will be required to
install a web browser plug-in from the
NRC Web site. Further information on
the web-based submission form,
including the installation of the Web
browser plug-in, is available on the
NRC’s public Web site at https://www.
nrc.gov/site-help/e-submittals.html.
After the Office of the Secretary has
created a docket and a participant has
obtained a digital ID certificate, then the
participant may submit a demand for
hearing or request for hearing or petition
for leave to intervene through the EIE.
Submissions should be in Portable
Document Format (PDF) in accordance
with NRC guidance available on the
NRC public Web site at https://
www.nrc.gov/site-help/e-
E:\FR\FM\08AUN1.SGM
08AUN1
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 79, No. 153 / Friday, August 8, 2014 / Notices
submittals.html. A filing is considered
complete at the time the documents are
submitted through the NRC’s E-Filing
system. To be timely, an electronic
filing must be submitted to the E-Filing
system no later than 11:59 p.m. Eastern
Time (ET) on the due date. Upon receipt
of a transmission, the E-Filing system
time-stamps the document and sends
the submitter an email notice
confirming receipt of the document. The
E-Filing system also distributes an email
notice that provides access to the
document to the NRC Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the documents on those
participants separately. Therefore, any
others who wish to participate in the
proceeding (or their counsel or
representative) must apply for and
receive a digital ID certificate before a
hearing request/petition to intervene is
filed so that they can obtain access to
the document via the E-Filing system.
A person filing electronically using
the agency’s adjudicatory E-Filing
system may seek assistance by
contacting the NRC Meta System Help
Desk through the ‘‘Contact Us’’ link
located on the NRC Web site at https://
www.nrc.gov/site-help/esubmittals.html, by email at
MSHD.Resource@nrc.gov, or by a tollfree call at (866) 672–7640. The NRC
Meta System Help Desk is available
between 8 a.m. and 8 p.m., Eastern
Time, Monday through Friday,
excluding government holidays.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing requesting authorization to
continue to submit documents in paper
format. Such filings must be submitted
by: (1) First class mail addressed to the
Office of the Secretary of the
Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemaking and
Adjudications Staff; or (2) courier,
express mail, or expedited delivery
service to the Office of the Secretary,
Sixteenth Floor, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland, 20852, Attention:
Rulemaking and Adjudications Staff.
Participants filing a document in this
manner are responsible for serving the
document on all other participants.
Filing is considered complete by firstclass mail as of the time of deposit in
the mail, or by courier, express mail, or
expedited delivery service upon
depositing the document with the
VerDate Mar<15>2010
16:51 Aug 07, 2014
Jkt 232001
provider of the service. A presiding
officer, having granted an exemption
request from using E-Filing, may require
a participant or party to use E-Filing if
the presiding officer subsequently
determines that the reason for granting
the exemption from use of E-Filing no
longer exists.
Documents submitted in adjudicatory
proceedings will appear in NRC’s
electronic hearing docket, which is
available to the public at https://ehd1.
nrc.gov/ehd/, unless excluded pursuant
to an order of the Commission, or the
presiding officer. Participants are
requested not to include personal
privacy information, such as social
security numbers, home addresses, or
home phone numbers in their filings,
unless an NRC regulation or other law
requires submission of such
information. With respect to
copyrighted works, participants are
requested not to include copyrighted
materials in their submission, except for
limited excerpts that serve the purpose
of the adjudicatory filings and would
constitute a Fair Use application.
If a person other than GEC requests a
hearing, that person shall set forth with
particularity the manner in which his
interest is adversely affected by this
Order and shall address the criteria set
forth in 10 CFR 2.309(d) and (f). If a
hearing is requested by GEC or a person
whose interest is adversely affected, the
Commission will issue an Order
designating the time and place of any
hearings. If a hearing is held, the issue
to be considered at such hearing shall be
whether this Order should be sustained.
In the absence of any request for a
hearing, or written approval of an
extension of time in which to request a
hearing, the provisions specified in
Section IV above shall be final 30 days
from the date this Order is issued
without further order or proceedings. If
an extension of time for requesting a
hearing has been approved, the
provisions specified in Section IV shall
be final when the extension expires if a
hearing request has not been received.
If payment has not been made by the
time specified above, the matter may be
referred to the Attorney General for
further action, including collection.
Dated at Rockville, Maryland, this
31st day of July 2014
For the Nuclear Regulatory
Commission
Patricia K. Holahan, Ph.D., Acting
Director Office of Enforcement
APPENDIX
EVALUATION AND CONCLUSION
On March 20, 2014, a Notice of
Violation and Proposed Imposition of
PO 00000
Frm 00077
Fmt 4703
Sfmt 4703
46471
Civil Penalty (Notice) was issued for a
violation of U.S. Nuclear Regulatory
Commission (NRC) requirements
involving the Geisser Engineering
Corporation’s (GEC’s) failure to file for
reciprocity prior to conducting work in
NRC jurisdiction. The violation was
identified during an NRC inspection.
GEC responded to the Notice in a letter
dated April 15, 2014. GEC
acknowledged the violation, but
requested mitigation of the civil penalty
assigned to GEC. The NRC’s evaluation
and conclusion regarding GEC’s request
to mitigate the civil penalty are as
follows:
Restatement of Violation as provided in
the Notice (March 20, 2014)
During an NRC inspection conducted
between May 9, 2012, and August 15,
2013, and an investigation initiated on
June 20, 2012, and completed on April
26, 2013, multiple occurrences of a
violation of NRC requirements were
identified. In accordance with the NRC
Enforcement Policy, the NRC proposes
to impose a civil penalty pursuant to
Section 234 of the Atomic Energy Act of
1954, as amended (Act), 42 U.S.C. 2282,
and 10 CFR 2.205. The particular
violation and associated civil penalty
are set forth below:
10 CFR 30.3 requires, in part, that
except for persons exempt as provided
in this part and part 150 of this chapter,
no person shall own, possess, or use
byproduct material except as authorized
in a specific or general license issued
pursuant to the regulations in 10 CFR
30.
10 CFR 150.20(a) states, in part, that
any person who holds a specific license
from an Agreement State is granted an
NRC general license to conduct the
same activity in Non-Agreement States
and areas of exclusive Federal
jurisdiction within Agreement States,
subject to the provisions of 10 CFR
150.20(b).
10 CFR 150.20(b)(1) requires, in part,
that any person engaging in activities in
Non-Agreement States shall, at least 3
days before engaging in each such
activity, file a submittal containing an
NRC Form 241, ‘‘Report of Proposed
Activities in Non-Agreement States,’’ a
copy of its Agreement State specific
license, and the appropriate fee, with
the Regional Administrator of the
appropriate NRC regional office.
Contrary to the above, between
October 21, 2009, and June 23, 2011,
Geisser Engineering Corporation, which
is authorized for possession and use of
radioactive material under a Rhode
Island Agreement State license, used
portable devices containing byproduct
material within NRC jurisdiction on 22
E:\FR\FM\08AUN1.SGM
08AUN1
46472
Federal Register / Vol. 79, No. 153 / Friday, August 8, 2014 / Notices
occasions without submitting NRC Form
241, a copy of its Agreement State
specific license, and the required fee for
calendar years 2009, 2010, and 2011,
with the Regional Administrator of the
appropriate NRC regional office.
This is a Severity Level II violation.
(Section 6.9) Civil Penalty—$11,200
(EA–13–105)
GEC’s Response to the Violation
In its letter dated April 15, 2014, GEC
acknowledged the violation, but
disagreed with the NRC’s conclusion
that the GEC president willfully (i.e.,
deliberately) caused the violation. The
NRC’s re-evaluation of the willful aspect
of the violation is addressed in a
separate correspondence to the
president of GEC.
mstockstill on DSK4VPTVN1PROD with NOTICES
Summary of GEC’s Request for
Mitigation of Civil Penalty Amount
In its response, GEC requested relief
from the civil penalty and requested
that the NRC consider the penalty
imposed on GEC by the Commonwealth
of Massachusetts for the use of a nuclear
density gauge in its jurisdiction without
filing for reciprocity.
In the April 15, 2014, letter, and in an
email correspondence dated April 30,
2014, GEC requested relief from the
proposed civil penalty due to the
unexpected payment to the
Commonwealth of Massachusetts for the
use of a nuclear density gauge in its
jurisdiction without filing for
reciprocity. Specifically, GEC stated that
payment of the additional NRC
proposed civil penalty would pose a
financial hardship for GEC. To support
its request, on May 5, 2014, GEC
submitted by email GEC’s tax returns for
calendar years 2011 and 2012.
NRC Evaluation of GEC’s Request for
Mitigation of Civil Penalty Amount
In response to GEC’s request, the NRC
reviewed GEC’s financial information,
the documentation included as part of
the inspection and investigation, and
the applicable enforcement guidance to
determine the appropriate action.
The Enforcement Policy Section 2.3.4
allows the use of discretion in
application of a Civil Penalty, including
a secondary consideration of the
licensee’s ability to pay. Specifically, it
is not the NRC’s intention that the
economic impact of a civil penalty be so
severe that it puts a licensee out of
business. However, the Enforcement
Policy Section 3.6 also states that one of
the civil penalty assessment factors to
be considered in applying discretion is
the presence of willful behavior that
caused a noncompliance with NRC
requirements in order to obtain an
VerDate Mar<15>2010
16:51 Aug 07, 2014
Jkt 232001
economic benefit. The NRC determined
that Mr. Geisser, President of GEC, acted
deliberately and provided GEC an
economic benefit of not paying NRC
reciprocity fees for calendar years 2009,
2010, and 2011. The reciprocity fees for
those years provided GEC an economic
benefit of approximately $6,000.
In the NRC’s evaluation of GEC’s
request, the NRC considered the
potential financial implications and
hardships that payment of the proposed
civil penalty would place on GEC, the
financial penalty taken previously
against GEC by the Commonwealth of
Massachusetts, and the economic
benefit GEC received for not complying
with NRC requirements. Specifically,
the NRC considered that a substantial
financial penalty has already been
imposed on GEC by the Commonwealth
for the same violation during the same
time-frame, although in different
jurisdictions, and that payment of the
proposed NRC civil penalty may pose a
financial hardship for GEC.
The NRC determined that GEC
provided an adequate basis that the NRC
civil penalty may pose a financial
hardship for GEC. However, while some
reduction of the full civil penalty is
warranted, the NRC also considered that
the civil penalty should account for the
economic benefit that GEC gained by
not complying with NRC requirements
to file for reciprocity with the NRC and
pay the required fees.
NRC Conclusion
Based on its evaluation, the NRC has
concluded that the violation occurred as
stated and that GEC provided an
adequate basis for mitigation of the civil
penalty. Consequently, a civil penalty in
the amount of $8,400 is imposed.
[FR Doc. 2014–18815 Filed 8–7–14; 8:45 am]
BILLING CODE 7590–01–P
to confirm that fuel cycle facilities are
in compliance with appropriate
regulatory requirements. The NRC will
use information submitted by licensees
in response to the generic letter if
additional regulatory action is
warranted.
Submit comments by November
6, 2014. Comments received after this
date will be considered if it is practical
to do so, but the NRC is able to assure
consideration only for comments
received on or before this date.
ADDRESSES: You may submit comments
by any of the following methods (unless
this document describes a different
method for submitting comments on a
specific subject):
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2014–0187. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–287–3422;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• Mail comments to: Cindy Bladey,
Office of Administration, Mail Stop:
3WFN–06–A44M, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT:
Jonathan Marcano, Office of Nuclear
Materials Safety and Safeguards, U.S.
Nuclear Regulatory Commission,
Washington DC 20555–0001; telephone:
301–287–9063, email:
Jonathan.Marcano@nrc.gov.
SUPPLEMENTARY INFORMATION:
DATES:
NUCLEAR REGULATORY
COMMISSION
I. Obtaining Information and
Submitting Comments
[NRC–2014–0187]
A. Obtaining Information
Treatment of Natural Phenomena
Hazards in Fuel Cycle Facilities
Nuclear Regulatory
Commission.
ACTION: Draft generic letter; public
meeting and request for comment.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is seeking public
comment on a draft generic letter to
request information from licensees to
address the treatment of natural
phenomena hazards in fuel cycle
facilities. The NRC has determined that
facility-specific information is necessary
SUMMARY:
PO 00000
Frm 00078
Fmt 4703
Sfmt 4703
Please refer to Docket ID NRC–2014–
0187 when contacting the NRC about
the availability of information for this
action. You may obtain publiclyavailable information related to this
action by any of the following methods:
• Federal rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2014–0187.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
E:\FR\FM\08AUN1.SGM
08AUN1
Agencies
[Federal Register Volume 79, Number 153 (Friday, August 8, 2014)]
[Notices]
[Pages 46469-46472]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-18815]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[EA-13-105; NRC-2014-0186]
In the Matter of Geisser Engineering Corporation
AGENCY: Nuclear Regulatory Commission.
ACTION: Order; issuance.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing an
order imposing a civil monetary penalty to Geisser Engineering
Corporation. The order requires Geisser Engineering Corporation to pay
a civil penalty in the amount of $8,400.
DATES: Effective Date: See attachment.
ADDRESSES: Please refer to Docket ID NRC-2014-0186 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly-available information related to this action by the
following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2014-0186. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-287-
3422; email: Carol.Gallagher@nrc.gov. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may access publicly available documents online in the NRC
Library at https://www.nrc.gov/reading-rm/adams.html. To begin the
search, select ``ADAMS Public Documents'' and then select ``Begin Web-
based ADAMS Search.'' For problems with ADAMS, please contact the NRC's
Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-
4737, or by email to pdr.resource@nrc.gov. The ADAMS accession number
for each document referenced in this document (if that document is
available in ADAMS) is provided the first time that a document is
referenced.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Thomas Marenchin, U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-
2979, email: Thomas.Marenchin@nrc.gov.
SUPPLEMENTARY INFORMATION: The text of the Order and appendix are
attached.
Dated at Rockville, Maryland, this 31st day of July 2014.
For the Nuclear Regulatory Commission.
Patricia K. Holahan,
Acting Director, Office of Enforcement.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION
In the Matter of:
Geisser Engineering Corporation) Docket No. 15000038
Riverside, Rhode Island License No.: RI 3L-050-01 EA-13-
105
ORDER IMPOSING CIVIL MONETARY PENALTY
I
Geisser Engineering Corporation (GEC) is the holder of a materials
license issued by the State of Rhode Island, an NRC Agreement State.
The Rhode Island license authorizes the possession, use, and storage of
portable moisture density gauges containing radioactive material
[[Page 46470]]
within the State of Rhode Island. GEC, as holder of a State license,
may perform work authorized by its license in other States or Federal
jurisdictions provided GEC files for reciprocity with the appropriate
regulatory authority.
II
An inspection of the GEC's activities was conducted on May 9, 2012,
with continued in-office review through August 15, 2013. The inspection
identified one violation involving multiple examples of GEC's failure
to file for reciprocity with the U.S. Nuclear Regulatory Commission
(NRC) prior to conducting work in NRC jurisdiction. In addition to the
inspection activities, the NRC Office of Investigations conducted an
investigation to determine whether a senior official of GEC
deliberately engaged in the use of licensed material in areas of NRC
jurisdiction without filing for reciprocity. The investigation
concluded that the president and owner of GEC deliberately engaged in
the use of licensed material in the State of Connecticut and at the
Newport Naval Station in Rhode Island, areas of NRC jurisdiction,
without filing for reciprocity with the NRC. A written Notice of
Violation and Proposed Imposition of Civil Penalty (Notice) was served
upon GEC by letter dated March 20, 2014. The Notice states the nature
of the violation, the provision of the NRC's requirements that GEC
violated, and the amount of the civil penalty proposed for the
violation. GEC responded to the Notice in a letter dated April 15,
2014. In its response and in subsequent communications with the NRC,
GEC acknowledged the violation, but disputed the willful aspect of the
violation (the willful aspect of the violation will be addressed in a
separate correspondence) and requested that the NRC mitigate the civil
penalty. Specifically, in an email correspondence dated April 30, 2014,
the president of GEC stated, in part, that GEC was seeking relief from
the proposed civil penalty due to the unexpected payment of a fine to
the Commonwealth of Massachusetts (Commonwealth) for GEC's failure to
file for reciprocity prior to using a nuclear density gauge in the
Commonwealth's jurisdiction. The president also stated that payment of
the proposed NRC civil penalty would pose a financial hardship for GEC.
III
After consideration of GEC's response and statement of fact,
explanation, and argument for mitigation contained therein, the NRC has
determined, as set forth in the Appendix to this Order, there is an
adequate basis to reduce the civil penalty for the associated NRC
violation, that the violation occurred as stated, that the amount of
the proposed penalty should be reduced by $2800 (25%), and a civil
penalty in the amount of $8,400 should be imposed.
IV
In view of the foregoing and pursuant to Section 234 of the Atomic
Energy Act of 1954, as amended (Act), 42 U.S.C. 2282, and 10 CFR 2.205,
IT IS HEREBY ORDERED THAT: GEC pay a civil penalty in the amount of
$8,400 within 30 days of the date of this Order, in accordance with
NUREG/BR-0254. In addition, at the time payment is made, GEC shall
submit a statement indicating when and by what method payment was made,
to the Director, Office of Enforcement, U.S. Nuclear Regulatory
Commission, One White Flint North, 11555 Rockville Pike, Rockville, MD
20852-2738.
V
In accordance with Title 10 of the Code of Federal Regulations (10
CFR) 2.202, GEC must, and any other person adversely affected by this
Order may, submit an answer to this Order within 30 days of the date of
this Order. In addition, GEC may demand a hearing on all or part of
this Order. Any other person adversely affected by this Order may
request a hearing on this Order within 30 days of the date of this
Order. Where good cause is shown, consideration will be given to
extending the time to answer or request a hearing. A request for
extension of time must be directed to the Director, Office of
Enforcement, NRC, and include a statement of good cause for the
extension.
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in accordance with the NRC E-Filing rule (72 FR 49139,
August 28, 2007, as amended by 77 FR 46562, August 3, 2012), codified
in pertinent part at 10 CFR Part 2, Subpart C. The E-Filing process
requires participants to submit and serve all adjudicatory documents
over the internet, or in some cases to mail copies on electronic
storage media. Participants may not submit paper copies of their
filings unless they seek an exemption in accordance with the procedures
described below.
To comply with the procedural requirements of E-Filing, at least 10
days prior to the filing deadline, the participant should contact the
Office of the Secretary by email at hearing.docket@nrc.gov, or by
telephone at (301) 415-1677, to request (1) a digital ID certificate,
which allows the participant (or its counsel or representative) to
digitally sign documents and access the E-Submittal server for any
proceeding in which it is participating; and (2) advise the Secretary
that the participant will be submitting a request or petition for
hearing (even in instances in which the participant, or its counsel or
representative, already holds an NRC-issued digital ID certificate).
Based upon this information, the Secretary will establish an electronic
docket for the hearing in this proceeding if the Secretary has not
already established an electronic docket.
Information about applying for a digital ID certificate is
available on NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/getting-started.html. System requirements for accessing the
E-Submittal server are detailed in NRC's ``Guidance for Electronic
Submission,'' which is available on the agency's public Web site at
https://www.nrc.gov/site-help/e-submittals.html. Participants may
attempt to use other software not listed on the Web site, but should
note that the NRC's E-Filing system does not support unlisted software,
and the NRC Meta System Help Desk will not be able to offer assistance
in using unlisted software.
If a participant is electronically submitting a document to the NRC
in accordance with the E-Filing rule, the participant must file the
document using the NRC's online, Web-based submission form available
from the NRC's Electronic Information Exchange (EIE). In order to serve
documents through EIE, users will be required to install a web browser
plug-in from the NRC Web site. Further information on the web-based
submission form, including the installation of the Web browser plug-in,
is available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals.html.
After the Office of the Secretary has created a docket and a
participant has obtained a digital ID certificate, then the participant
may submit a demand for hearing or request for hearing or petition for
leave to intervene through the EIE. Submissions should be in Portable
Document Format (PDF) in accordance with NRC guidance available on the
NRC public Web site at https://www.nrc.gov/site-help/e-
[[Page 46471]]
submittals.html. A filing is considered complete at the time the
documents are submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time (ET) on the due date. Upon
receipt of a transmission, the E-Filing system time-stamps the document
and sends the submitter an email notice confirming receipt of the
document. The E-Filing system also distributes an email notice that
provides access to the document to the NRC Office of the General
Counsel and any others who have advised the Office of the Secretary
that they wish to participate in the proceeding, so that the filer need
not serve the documents on those participants separately. Therefore,
any others who wish to participate in the proceeding (or their counsel
or representative) must apply for and receive a digital ID certificate
before a hearing request/petition to intervene is filed so that they
can obtain access to the document via the E-Filing system.
A person filing electronically using the agency's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System
Help Desk through the ``Contact Us'' link located on the NRC Web site
at https://www.nrc.gov/site-help/e-submittals.html, by email at
MSHD.Resource@nrc.gov, or by a toll-free call at (866) 672-7640. The
NRC Meta System Help Desk is available between 8 a.m. and 8 p.m.,
Eastern Time, Monday through Friday, excluding government holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville,
Maryland, 20852, Attention: Rulemaking and Adjudications Staff.
Participants filing a document in this manner are responsible for
serving the document on all other participants. Filing is considered
complete by first-class mail as of the time of deposit in the mail, or
by courier, express mail, or expedited delivery service upon depositing
the document with the provider of the service. A presiding officer,
having granted an exemption request from using E-Filing, may require a
participant or party to use E-Filing if the presiding officer
subsequently determines that the reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory proceedings will appear in
NRC's electronic hearing docket, which is available to the public at
https://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the
Commission, or the presiding officer. Participants are requested not to
include personal privacy information, such as social security numbers,
home addresses, or home phone numbers in their filings, unless an NRC
regulation or other law requires submission of such information. With
respect to copyrighted works, participants are requested not to include
copyrighted materials in their submission, except for limited excerpts
that serve the purpose of the adjudicatory filings and would constitute
a Fair Use application.
If a person other than GEC requests a hearing, that person shall
set forth with particularity the manner in which his interest is
adversely affected by this Order and shall address the criteria set
forth in 10 CFR 2.309(d) and (f). If a hearing is requested by GEC or a
person whose interest is adversely affected, the Commission will issue
an Order designating the time and place of any hearings. If a hearing
is held, the issue to be considered at such hearing shall be whether
this Order should be sustained. In the absence of any request for a
hearing, or written approval of an extension of time in which to
request a hearing, the provisions specified in Section IV above shall
be final 30 days from the date this Order is issued without further
order or proceedings. If an extension of time for requesting a hearing
has been approved, the provisions specified in Section IV shall be
final when the extension expires if a hearing request has not been
received.
If payment has not been made by the time specified above, the
matter may be referred to the Attorney General for further action,
including collection.
Dated at Rockville, Maryland, this 31st day of July 2014
For the Nuclear Regulatory Commission
Patricia K. Holahan, Ph.D., Acting Director Office of Enforcement
APPENDIX
EVALUATION AND CONCLUSION
On March 20, 2014, a Notice of Violation and Proposed Imposition of
Civil Penalty (Notice) was issued for a violation of U.S. Nuclear
Regulatory Commission (NRC) requirements involving the Geisser
Engineering Corporation's (GEC's) failure to file for reciprocity prior
to conducting work in NRC jurisdiction. The violation was identified
during an NRC inspection. GEC responded to the Notice in a letter dated
April 15, 2014. GEC acknowledged the violation, but requested
mitigation of the civil penalty assigned to GEC. The NRC's evaluation
and conclusion regarding GEC's request to mitigate the civil penalty
are as follows:
Restatement of Violation as provided in the Notice (March 20, 2014)
During an NRC inspection conducted between May 9, 2012, and August
15, 2013, and an investigation initiated on June 20, 2012, and
completed on April 26, 2013, multiple occurrences of a violation of NRC
requirements were identified. In accordance with the NRC Enforcement
Policy, the NRC proposes to impose a civil penalty pursuant to Section
234 of the Atomic Energy Act of 1954, as amended (Act), 42 U.S.C. 2282,
and 10 CFR 2.205. The particular violation and associated civil penalty
are set forth below:
10 CFR 30.3 requires, in part, that except for persons exempt as
provided in this part and part 150 of this chapter, no person shall
own, possess, or use byproduct material except as authorized in a
specific or general license issued pursuant to the regulations in 10
CFR 30.
10 CFR 150.20(a) states, in part, that any person who holds a
specific license from an Agreement State is granted an NRC general
license to conduct the same activity in Non-Agreement States and areas
of exclusive Federal jurisdiction within Agreement States, subject to
the provisions of 10 CFR 150.20(b).
10 CFR 150.20(b)(1) requires, in part, that any person engaging in
activities in Non-Agreement States shall, at least 3 days before
engaging in each such activity, file a submittal containing an NRC Form
241, ``Report of Proposed Activities in Non-Agreement States,'' a copy
of its Agreement State specific license, and the appropriate fee, with
the Regional Administrator of the appropriate NRC regional office.
Contrary to the above, between October 21, 2009, and June 23, 2011,
Geisser Engineering Corporation, which is authorized for possession and
use of radioactive material under a Rhode Island Agreement State
license, used portable devices containing byproduct material within NRC
jurisdiction on 22
[[Page 46472]]
occasions without submitting NRC Form 241, a copy of its Agreement
State specific license, and the required fee for calendar years 2009,
2010, and 2011, with the Regional Administrator of the appropriate NRC
regional office.
This is a Severity Level II violation. (Section 6.9) Civil
Penalty--$11,200 (EA-13-105)
GEC's Response to the Violation
In its letter dated April 15, 2014, GEC acknowledged the violation,
but disagreed with the NRC's conclusion that the GEC president
willfully (i.e., deliberately) caused the violation. The NRC's re-
evaluation of the willful aspect of the violation is addressed in a
separate correspondence to the president of GEC.
Summary of GEC's Request for Mitigation of Civil Penalty Amount
In its response, GEC requested relief from the civil penalty and
requested that the NRC consider the penalty imposed on GEC by the
Commonwealth of Massachusetts for the use of a nuclear density gauge in
its jurisdiction without filing for reciprocity.
In the April 15, 2014, letter, and in an email correspondence dated
April 30, 2014, GEC requested relief from the proposed civil penalty
due to the unexpected payment to the Commonwealth of Massachusetts for
the use of a nuclear density gauge in its jurisdiction without filing
for reciprocity. Specifically, GEC stated that payment of the
additional NRC proposed civil penalty would pose a financial hardship
for GEC. To support its request, on May 5, 2014, GEC submitted by email
GEC's tax returns for calendar years 2011 and 2012.
NRC Evaluation of GEC's Request for Mitigation of Civil Penalty Amount
In response to GEC's request, the NRC reviewed GEC's financial
information, the documentation included as part of the inspection and
investigation, and the applicable enforcement guidance to determine the
appropriate action.
The Enforcement Policy Section 2.3.4 allows the use of discretion
in application of a Civil Penalty, including a secondary consideration
of the licensee's ability to pay. Specifically, it is not the NRC's
intention that the economic impact of a civil penalty be so severe that
it puts a licensee out of business. However, the Enforcement Policy
Section 3.6 also states that one of the civil penalty assessment
factors to be considered in applying discretion is the presence of
willful behavior that caused a noncompliance with NRC requirements in
order to obtain an economic benefit. The NRC determined that Mr.
Geisser, President of GEC, acted deliberately and provided GEC an
economic benefit of not paying NRC reciprocity fees for calendar years
2009, 2010, and 2011. The reciprocity fees for those years provided GEC
an economic benefit of approximately $6,000.
In the NRC's evaluation of GEC's request, the NRC considered the
potential financial implications and hardships that payment of the
proposed civil penalty would place on GEC, the financial penalty taken
previously against GEC by the Commonwealth of Massachusetts, and the
economic benefit GEC received for not complying with NRC requirements.
Specifically, the NRC considered that a substantial financial penalty
has already been imposed on GEC by the Commonwealth for the same
violation during the same time-frame, although in different
jurisdictions, and that payment of the proposed NRC civil penalty may
pose a financial hardship for GEC.
The NRC determined that GEC provided an adequate basis that the NRC
civil penalty may pose a financial hardship for GEC. However, while
some reduction of the full civil penalty is warranted, the NRC also
considered that the civil penalty should account for the economic
benefit that GEC gained by not complying with NRC requirements to file
for reciprocity with the NRC and pay the required fees.
NRC Conclusion
Based on its evaluation, the NRC has concluded that the violation
occurred as stated and that GEC provided an adequate basis for
mitigation of the civil penalty. Consequently, a civil penalty in the
amount of $8,400 is imposed.
[FR Doc. 2014-18815 Filed 8-7-14; 8:45 am]
BILLING CODE 7590-01-P