Combined Notice of Filings #1, 45793-45795 [2014-18580]
Download as PDF
Federal Register / Vol. 79, No. 151 / Wednesday, August 6, 2014 / Notices
DEPARTMENT OF ENERGY
Office of Energy Efficiency and
Renewable Energy
Request for Information (RFI) on
Advanced Manufacturing Office
Software Tools
Office of Energy Efficiency and
Renewable Energy (EERE), Department
of Energy.
ACTION: Notice of posting for public
comment, a Request for Information
(RFI) on Advanced Manufacturing
Office Software Tools.
AGENCY:
The U.S. Department of
Energy (DOE) invites public comment
on its Request for Information (RFI)
number DE–FOA–0001165 regarding
Advanced Manufacturing Office
Software Tools. The RFI document is
posted at https://eereexchange.energy.gov/.
EERE’s Advanced Manufacturing
Office (AMO) seeks information from
industry, academia, research
laboratories, government agencies, and
other stakeholders on issues related to
market opportunities to enhance and
expand upon certain AMO system
software tools and related assets. At the
present time these software tool
resources/assets are primarily
maintained and managed by the U.S.
Department of Energy’s Advanced
Manufacturing Office. This RFI seeks
information to assist with the transition
of these resources to be primarily or
solely managed by a third party (or
parties). AMO is particularly interested
in business strategies to ensure:
• The resource content is maintained,
improved and enhanced.
• The resources remain available to
the industrial sector.
• The current and future market
needs for these system assets are
addressed.
• Adaptation to rapidly changing and
progressing electronic and IT
infrastructure is embraced and
addressed.
This is solely a request for
information and not a Funding
Opportunity Announcement (FOA).
EERE is not accepting applications.
DATES: Responses to the RFI must be
received on or before September 30,
2014.
ADDRESSES: The complete RFI document
is located at https://eereexchange.energy.gov/.
FOR FURTHER INFORMATION CONTACT:
Responses to the RFI and questions
should be sent via email or email
attachment to AMOTools@ee.doe.gov.
Further instruction can be found in the
mstockstill on DSK4VPTVN1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
17:14 Aug 05, 2014
Jkt 232001
RFI document posted on EERE
Exchange.
SUPPLEMENTARY INFORMATION: The RFI is
not a Funding Opportunity
Announcement (FOA); therefore, EERE
is not accepting applications at this
time. EERE may issue a FOA in the
future based on or related to the content
and responses to the RFI; however,
EERE may also elect not to issue a FOA.
There is no guarantee that a FOA will
be issued as a result of the RFI.
Responding to the RFI does not provide
any advantage or disadvantage to
potential applicants if EERE chooses to
issue a FOA regarding the subject
matter. Final details, including the
anticipated award size, quantity, and
timing of EERE funded awards, will be
subject to Congressional appropriations
and direction.
Any information obtained as a result
of the RFI is intended to be used by the
Government on a non-attribution basis
for planning and strategy development;
the RFI does not constitute a formal
solicitation for proposals or abstracts.
Responses to the RFI will be treated as
information only. EERE will review and
consider all responses in its formulation
of program strategies for the identified
materials of interest that are the subject
of this request. EERE will not provide
reimbursement for costs incurred in
responding to the RFI. Respondents are
advised that EERE is under no
obligation to acknowledge receipt of the
information received or provide
feedback to respondents with respect to
any information submitted under the
RFI. Responses to the RFI do not bind
EERE to any further actions related to
this topic.
Issued in Washington, DC, on July 25,
2014.
Mark A. Johnson,
Director, Advanced Manufacturing Office,
Energy Efficiency and Renewable Energy.
[FR Doc. 2014–18570 Filed 8–5–14; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC14–119–000.
Applicants: Grays Harbor Energy LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act and Request for
Waivers and Expedited Action of Grays
Harbor Energy LLC.
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
45793
Filed Date: 7/29/14.
Accession Number: 20140729–5140.
Comments Due: 5 p.m. ET 8/19/14.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2984–011.
Applicants: Merrill Lynch
Commodities, Inc.
Description: Second Supplement to
June 21, 2013 Updated Market Power
Analysis for the Southwest Region of
Merrill Lynch Commodities, Inc.
Filed Date: 7/29/14.
Accession Number: 20140729–5146.
Comments Due: 5 p.m. ET 8/19/14.
Docket Numbers: ER11–3643–000.
Applicants: PacifiCorp.
Description: Refund Report Filing
(2013 True-Up and Schedule 5 & 6) to
be effective N/A.
Filed Date: 7/30/14.
Accession Number: 20140730–5067.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: ER13–1489–003.
Applicants: Quantum Lake Power, LP.
Description: Amendment containing
Workpapers of Dr. John R. Morris to
March 26, 2014 Notification of NonMaterial Change in Status of Quantum
Lake Power, LP.
Filed Date: 7/29/14.
Accession Number: 20140729–5145.
Comments Due: 5 p.m. ET 8/19/14.
Docket Numbers: ER13–1489–003.
Applicants: Quantum Lake Power, LP.
Description: Amendment to March 26,
2014 Notification of Non-Material
Change in Status of Quantum Lake
Power, LP.
Filed Date: 7/29/14.
Accession Number: 20140729–5151.
Comments Due: 5 p.m. ET 8/19/14.
Docket Numbers: ER14–1872–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: 2014–07–30_SA 2650
METC E&P Supplement Filing to be
effective N/A.
Filed Date: 7/30/14.
Accession Number: 20140730–5039.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: ER14–2223–000.
Applicants: Sabine Cogen, LP.
Description: Second Amendment to
June 19, 2014 Sabine Cogen, LP tariff
filing.
Filed Date: 7/29/14.
Accession Number: 20140729–5147.
Comments Due: 5 p.m. ET 8/19/14.
Docket Numbers: ER14–2526–000.
Applicants: Southern California
Edison Company.
Description: Service Agreement for
Wholesale Distribution Service with
City of Industry to be effective 7/31/
2014.
E:\FR\FM\06AUN1.SGM
06AUN1
mstockstill on DSK4VPTVN1PROD with NOTICES
45794
Federal Register / Vol. 79, No. 151 / Wednesday, August 6, 2014 / Notices
Filed Date: 7/30/14.
Accession Number: 20140730–5002.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: ER14–2527–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Service Agreement No.
3686; Queue No. Y3–023 to be effective
7/1/2014.
Filed Date: 7/30/14.
Accession Number: 20140730–5043.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: ER14–2528–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: 2014–07–30 Attachment
P GFA Clean-up to be effective 9/29/
2014.
Filed Date: 7/30/14.
Accession Number: 20140730–5045.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: ER14–2529–000.
Applicants: Pacific Gas and Electric
Company.
Description: Transmission Owner
Rate Case 2015 (TO16) to be effective
10/1/2014.
Filed Date: 7/30/14.
Accession Number: 20140730–5071.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: ER14–2530–000.
Applicants: Arizona Public Service
Company.
Description: Service Agreement No.
218, Exhibit F Revision No. 8—Mead
Phoenix Project to be effective 7/1/2014.
Filed Date: 7/30/14.
Accession Number: 20140730–5081.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: ER14–2531–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Service Agreement No.
3911; Queue No. Y3–024 to be effective
7/1/2014.
Filed Date: 7/30/14.
Accession Number: 20140730–5082.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: ER14–2532–000.
Applicants: Tampa Electric Company.
Description: TEC’s Compliance Filing
Order 792 to be effective 8/1/2014.
Filed Date: 7/30/14.
Accession Number: 20140730–5087.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: ER14–2533–000.
Applicants: MATL LLP.
Description: Replacement for 792
Language to be effective 8/1/2014.
Filed Date: 7/30/14.
Accession Number: 20140730–5093.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: ER14–2534–000.
Applicants: New England Power
Company.
Description: New England Power
Filing of SGIA with Centennial Island
VerDate Mar<15>2010
17:14 Aug 05, 2014
Jkt 232001
Hydroelectric Company to be effective
6/23/2014.
Filed Date: 7/30/14.
Accession Number: 20140730–5097.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: ER14–2535–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Service Agreement No.
3330; Queue No. X1–095 to be effective
7/2/2014.
Filed Date: 7/30/14.
Accession Number: 20140730–5104.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: ER14–2536–000.
Applicants: California Independent
System Operator Corporation.
Description: 2014–07–30_
ContingencyReserveCostAllocation to be
effective 10/1/2014.
Filed Date: 7/30/14.
Accession Number: 20140730–5113.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: ER14–2537–000.
Applicants: Florida Power & Light
Company.
Description: FPL and Landfill Energy
Systems, LLC Service Agreement No.
327 to be effective 11/1/2014.
Filed Date: 7/30/14.
Accession Number: 20140730–5124.
Comments Due: 5 p.m. ET 8/20/14.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES14–46–000.
Applicants: Ameren Illinois
Company.
Description: Application for
Financing Authorization under Federal
Power Act Section 204 of Ameren
Illinois Company.
Filed Date: 7/30/14.
Accession Number: 20140730–5092.
Comments Due: 5 p.m. ET 8/20/14.
Take notice that the Commission
received the following land acquisition
reports:
Docket Numbers: LA14–2–000.
Applicants: Auburndale Peaker
Energy Center, LLC, Bethpage Energy
Center 3, LLC, Calpine Bethlehem, LLC,
Calpine Construction Finance Co., L.P.,
Calpine Energy Services, L.P., Calpine
Gilroy Cogen, L.P., Calpine Greenleaf,
Inc., Calpine Mid-Atlantic Generation,
LLC, Calpine Mid-Atlantic Marketing,
LLC, Calpine Mid Merit, LLC, Calpine
New Jersey Generation, LLC, Calpine
Newark, LLC, Calpine Power America—
CA, LLC, Calpine Vineland Solar, LLC,
CCFC Sutter Energy, LLC, CES
Marketing V, LLC, CES Marketing IX,
LLC, CES Marketing X, LLC, CPN
Bethpage 3rd Turbine, Inc., Creed
Energy Center, LLC, Delta Energy
Center, LLC, Geysers Power Company,
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
LLC, Gilroy Energy Center, LLC, Goose
Haven Energy Center, LLC, Hermiston
Power, LLC, KIAC Partners, Los Esteros
Critical Energy Facility, LLC, Los
Medanos Energy Center, LLC, Mankato
Energy Center, LLC, Metcalf Energy
Center, LLC, Morgan Energy Center,
LLC, Nissequogue Cogen Partners,
O.L.S. Energy-Agnews, Inc., Osprey
Energy Center, LLC, Otay Mesa Energy
Center, LLC, Pastoria Energy Facility
L.L.C., Pine Bluff Energy, LLC, Power
Contract Financing, L.L.C., RockGen
Energy, LLC, Russell City Energy
Company, LLC, South Point Energy
Center, LLC, TBG Cogen Partners,
Westbrook Energy Center, LLC, Zion
Energy LLC.
Description: Quarterly Land
Acquisition Report of the Calpine MBR
Sellers.
Filed Date: 7/29/14.
Accession Number: 20140729–5136.
Comments Due: 5 p.m. ET 8/19/14.
Docket Numbers: LA14–2–000.
Applicants: Cedar Creek II, LLC,
Copper Mountain Solar 1, LLC, Copper
Mountain Solar 2, LLC, Copper
Mountain Solar 3, LLC, Energia Sierra
Juarez U.S., LLC, Flat Ridge 2 Wind
Energy LLC, Fowler Ridge II Wind Farm
LLC, Mehoopany Wind Energy LLC,
Mesquite Power, LLC, Mesquite Solar 1,
LLC, San Diego Gas & Electric Company,
Sempra Generation, LLC,
Termoelectrica U.S., LLC.
Description: Quarterly Land
Acquisition Report of Sempra
Generation, LLC, et. al.
Filed Date: 7/29/14.
Accession Number: 20140729–5137
Comments Due: 5 p.m. ET 8/19/14.
Docket Numbers: LA14–2–000.
Applicants: All Dams Generation,
LLC, Arlington Valley Solar Energy II,
LLC, Bluegrass Generation Company,
L.L.C., Calhoun Power Company, LLC,
Carville Energy LLC, Centinela Solar
Energy, LLC, Cherokee County
Cogeneration Partners, LLC, Columbia
Energy LLC, Decatur Energy Center,
LLC, DeSoto County Generating
Company, LLC, Doswell Limited
Partnership, Lake Lynn Generation,
LLC, Las Vegas Power Company, LLC,
LS Power Marketing, LLC, LSP
University Park, LLC, Mobile Energy
LLC, Oneta Power, LLC, PE Hydro
Generation, LLC, Renaissance Power,
L.L.C., Riverside Generating Company,
L.L.C., Rocky Road Power, LLC, Santa
Rosa Energy Center, LLC, Seneca
Generation, LLC, Tilton Energy LLC,
University Park Energy, LLC,
Wallingford Energy LLC, West Deptford
Energy, LLC.
Description: Quarterly Land
Acquisition Report of the LS MBR
Sellers.
E:\FR\FM\06AUN1.SGM
06AUN1
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 79, No. 151 / Wednesday, August 6, 2014 / Notices
Filed Date: 7/29/14.
Accession Number: 20140729–5138
Comments Due: 5 p.m. ET 8/19/14.
Docket Numbers: LA14–2–000.
Applicants: Iberdrola Renewables,
LLC, Atlantic Renewable Projects II
LLC, Barton Windpower LLC, Big Horn
Wind Project LLC, Big Horn II Wind
Project LLC, Blue Creek Wind Farm
LLC, Buffalo Ridge I LLC, Buffalo Ridge
II LLC, Casselman Windpower LLC,
Colorado Green Holdings LLC, Dillon
Wind LLC, Dry Lake Wind Power, LLC,
Dry Lake Wind Power II LLC, Elk River
Windfarm, LLC, Elm Creek Wind, LLC,
Elm Creek Wind II LLC, Farmers City
Wind, LLC, Flat Rock Windpower LLC,
Flat Rock Windpower II LLC, Flying
Cloud Power Partners, LLC, Groton
Wind, LLC, Hardscrabble Wind Power
LLC, Hay Canyon Wind LLC, Juniper
Canyon Wind Power LLC, Klamath
Energy LLC, Klamath Generation LLC,
Klondike Wind Power LLC, Klondike
Wind Power II LLC, Klondike Wind
Power III LLC, Leaning Juniper Wind
Power II LLC, Lempster Wind, LLC,
Locust Ridge Wind Farm, LLC, Locust
Ridge II, LLC, Manzana Wind LLC,
MinnDakota Wind LLC, Moraine Wind
LLC, Moraine Wind II LLC, Mountain
View Power Partners III, LLC, New
England Wind, LLC, New Harvest Wind
Project LLC, Northern Iowa Windpower
II LLC, Pebble Springs Wind LLC,
Providence Heights Wind, LLC, Rugby
Wind LLC, San Luis Solar LLC, Shiloh
I Wind Project, LLC, South Chestnut
LLC, Star Point Wind Project LLC,
Streator-Cayuga Ridge Wind Power LLC,
Trimont Wind I LLC, and Twin Buttes
Wind LLC.
Description: Quarterly Land
Acquisition Report of the Iberdrola MBR
Sellers.
Filed Date: 7/29/14.
Accession Number: 20140729–5139.
Comments Due: 5 p.m. ET 8/19/14.
Docket Numbers: LA14–2–000.
Applicants: Blue Sky East, LLC,
Canandaigua Power Partners, LLC,
Canandaigua Power Partners II, LLC,
Erie Wind, LLC, Evergreen Wind Power,
LLC, Evergreen Wind Power III, LLC,
First Wind Energy Marketing, LLC,
Longfellow Wind, LLC, Milford Wind
Corridor Phase I, LLC, Milford Wind
Corridor Phase II, LLC, Palouse Wind,
LLC, Niagara Wind Power, LLC, Stetson
Holdings, LLC, Stetson Wind II, LLC,
Vermont Wind, LLC.
Description: Quarterly Land
Acquisition Report of the First Wind
MBR Companies.
Filed Date: 7/30/14.
Accession Number: 20140730–5028.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: LA14–2–000.
VerDate Mar<15>2010
17:14 Aug 05, 2014
Jkt 232001
Applicants: Southern Company
Services, Inc., Alabama Power
Company, Georgia Power Company,
Gulf Power Company, Mississippi
Power Company, Southern Power
Company.
Description: Quarterly Land
Acquisition Report of Southern
Company Services, Inc. (as Agent).
Filed Date: 7/30/14.
Accession Number: 20140730–5056.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: LA14–2–000.
Applicants: Alta Wind I, LLC, Alta
Wind II, LLC, Alta Wind III, LLC, Alta
Wind IV, LLC, Alta Wind V, LLC, Alta
Wind X, LLC, Alta Wind XI, LLC,
ArcLight Energy Marketing, LLC, Badger
Creek Limited, Coso Geothermal Power
Holdings, LLC, Double ‘‘C’’ Limited,
High Sierra Limited, Kern Front
Limited, Oak Creek Wind Power, LLC,
TGP Energy Management, LLC, and
Victory Garden Phase IV, LLC.
Description: Quarterly Land
Acquisition Report of Alta Wind I, LLC,
et. al.
Filed Date: 7/30/14.
Accession Number: 20140730–5106.
Comments Due: 5 p.m. ET 8/20/14.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 30, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014–18580 Filed 8–5–14; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
45795
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM98–1–000]
Records Governing Off-the-Record
Communications; Public Notice
This constitutes notice, in accordance
with 18 CFR 385.2201(b), of the receipt
of prohibited and exempt off-the-record
communications.
Order No. 607 (64 FR 51222,
September 22, 1999) requires
Commission decisional employees, who
make or receive a prohibited or exempt
off-the-record communication relevant
to the merits of a contested proceeding,
to deliver to the Secretary of the
Commission, a copy of the
communication, if written, or a
summary of the substance of any oral
communication.
Prohibited communications are
included in a public, non-decisional file
associated with, but not a part of, the
decisional record of the proceeding.
Unless the Commission determines that
the prohibited communication and any
responses thereto should become a part
of the decisional record, the prohibited
off-the-record communication will not
be considered by the Commission in
reaching its decision. Parties to a
proceeding may seek the opportunity to
respond to any facts or contentions
made in a prohibited off-the-record
communication, and may request that
the Commission place the prohibited
communication and responses thereto
in the decisional record. The
Commission will grant such a request
only when it determines that fairness so
requires. Any person identified below as
having made a prohibited off-the-record
communication shall serve the
document on all parties listed on the
official service list for the applicable
proceeding in accordance with Rule
2010, 18 CFR 385.2010.
Exempt off-the-record
communications are included in the
decisional record of the proceeding,
unless the communication was with a
cooperating agency as described by 40
CFR 1501.6, made under 18 CFR
385.2201(e)(1)(v).
The following is a list of off-therecord communications recently
received by the Secretary of the
Commission. The communications
listed are grouped by docket numbers in
ascending order. These filings are
available for electronic review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the eLibrary link.
E:\FR\FM\06AUN1.SGM
06AUN1
Agencies
[Federal Register Volume 79, Number 151 (Wednesday, August 6, 2014)]
[Notices]
[Pages 45793-45795]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-18580]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC14-119-000.
Applicants: Grays Harbor Energy LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act and Request for Waivers and Expedited Action of Grays
Harbor Energy LLC.
Filed Date: 7/29/14.
Accession Number: 20140729-5140.
Comments Due: 5 p.m. ET 8/19/14.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2984-011.
Applicants: Merrill Lynch Commodities, Inc.
Description: Second Supplement to June 21, 2013 Updated Market
Power Analysis for the Southwest Region of Merrill Lynch Commodities,
Inc.
Filed Date: 7/29/14.
Accession Number: 20140729-5146.
Comments Due: 5 p.m. ET 8/19/14.
Docket Numbers: ER11-3643-000.
Applicants: PacifiCorp.
Description: Refund Report Filing (2013 True-Up and Schedule 5 & 6)
to be effective N/A.
Filed Date: 7/30/14.
Accession Number: 20140730-5067.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: ER13-1489-003.
Applicants: Quantum Lake Power, LP.
Description: Amendment containing Workpapers of Dr. John R. Morris
to March 26, 2014 Notification of Non-Material Change in Status of
Quantum Lake Power, LP.
Filed Date: 7/29/14.
Accession Number: 20140729-5145.
Comments Due: 5 p.m. ET 8/19/14.
Docket Numbers: ER13-1489-003.
Applicants: Quantum Lake Power, LP.
Description: Amendment to March 26, 2014 Notification of Non-
Material Change in Status of Quantum Lake Power, LP.
Filed Date: 7/29/14.
Accession Number: 20140729-5151.
Comments Due: 5 p.m. ET 8/19/14.
Docket Numbers: ER14-1872-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: 2014-07-30--SA 2650 METC E&P Supplement Filing to be
effective N/A.
Filed Date: 7/30/14.
Accession Number: 20140730-5039.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: ER14-2223-000.
Applicants: Sabine Cogen, LP.
Description: Second Amendment to June 19, 2014 Sabine Cogen, LP
tariff filing.
Filed Date: 7/29/14.
Accession Number: 20140729-5147.
Comments Due: 5 p.m. ET 8/19/14.
Docket Numbers: ER14-2526-000.
Applicants: Southern California Edison Company.
Description: Service Agreement for Wholesale Distribution Service
with City of Industry to be effective 7/31/2014.
[[Page 45794]]
Filed Date: 7/30/14.
Accession Number: 20140730-5002.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: ER14-2527-000.
Applicants: PJM Interconnection, L.L.C.
Description: Service Agreement No. 3686; Queue No. Y3-023 to be
effective 7/1/2014.
Filed Date: 7/30/14.
Accession Number: 20140730-5043.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: ER14-2528-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: 2014-07-30 Attachment P GFA Clean-up to be effective
9/29/2014.
Filed Date: 7/30/14.
Accession Number: 20140730-5045.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: ER14-2529-000.
Applicants: Pacific Gas and Electric Company.
Description: Transmission Owner Rate Case 2015 (TO16) to be
effective 10/1/2014.
Filed Date: 7/30/14.
Accession Number: 20140730-5071.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: ER14-2530-000.
Applicants: Arizona Public Service Company.
Description: Service Agreement No. 218, Exhibit F Revision No. 8--
Mead Phoenix Project to be effective 7/1/2014.
Filed Date: 7/30/14.
Accession Number: 20140730-5081.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: ER14-2531-000.
Applicants: PJM Interconnection, L.L.C.
Description: Service Agreement No. 3911; Queue No. Y3-024 to be
effective 7/1/2014.
Filed Date: 7/30/14.
Accession Number: 20140730-5082.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: ER14-2532-000.
Applicants: Tampa Electric Company.
Description: TEC's Compliance Filing Order 792 to be effective 8/1/
2014.
Filed Date: 7/30/14.
Accession Number: 20140730-5087.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: ER14-2533-000.
Applicants: MATL LLP.
Description: Replacement for 792 Language to be effective 8/1/2014.
Filed Date: 7/30/14.
Accession Number: 20140730-5093.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: ER14-2534-000.
Applicants: New England Power Company.
Description: New England Power Filing of SGIA with Centennial
Island Hydroelectric Company to be effective 6/23/2014.
Filed Date: 7/30/14.
Accession Number: 20140730-5097.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: ER14-2535-000.
Applicants: PJM Interconnection, L.L.C.
Description: Service Agreement No. 3330; Queue No. X1-095 to be
effective 7/2/2014.
Filed Date: 7/30/14.
Accession Number: 20140730-5104.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: ER14-2536-000.
Applicants: California Independent System Operator Corporation.
Description: 2014-07-30--ContingencyReserveCostAllocation to be
effective 10/1/2014.
Filed Date: 7/30/14.
Accession Number: 20140730-5113.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: ER14-2537-000.
Applicants: Florida Power & Light Company.
Description: FPL and Landfill Energy Systems, LLC Service Agreement
No. 327 to be effective 11/1/2014.
Filed Date: 7/30/14.
Accession Number: 20140730-5124.
Comments Due: 5 p.m. ET 8/20/14.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES14-46-000.
Applicants: Ameren Illinois Company.
Description: Application for Financing Authorization under Federal
Power Act Section 204 of Ameren Illinois Company.
Filed Date: 7/30/14.
Accession Number: 20140730-5092.
Comments Due: 5 p.m. ET 8/20/14.
Take notice that the Commission received the following land
acquisition reports:
Docket Numbers: LA14-2-000.
Applicants: Auburndale Peaker Energy Center, LLC, Bethpage Energy
Center 3, LLC, Calpine Bethlehem, LLC, Calpine Construction Finance
Co., L.P., Calpine Energy Services, L.P., Calpine Gilroy Cogen, L.P.,
Calpine Greenleaf, Inc., Calpine Mid-Atlantic Generation, LLC, Calpine
Mid-Atlantic Marketing, LLC, Calpine Mid Merit, LLC, Calpine New Jersey
Generation, LLC, Calpine Newark, LLC, Calpine Power America--CA, LLC,
Calpine Vineland Solar, LLC, CCFC Sutter Energy, LLC, CES Marketing V,
LLC, CES Marketing IX, LLC, CES Marketing X, LLC, CPN Bethpage 3rd
Turbine, Inc., Creed Energy Center, LLC, Delta Energy Center, LLC,
Geysers Power Company, LLC, Gilroy Energy Center, LLC, Goose Haven
Energy Center, LLC, Hermiston Power, LLC, KIAC Partners, Los Esteros
Critical Energy Facility, LLC, Los Medanos Energy Center, LLC, Mankato
Energy Center, LLC, Metcalf Energy Center, LLC, Morgan Energy Center,
LLC, Nissequogue Cogen Partners, O.L.S. Energy-Agnews, Inc., Osprey
Energy Center, LLC, Otay Mesa Energy Center, LLC, Pastoria Energy
Facility L.L.C., Pine Bluff Energy, LLC, Power Contract Financing,
L.L.C., RockGen Energy, LLC, Russell City Energy Company, LLC, South
Point Energy Center, LLC, TBG Cogen Partners, Westbrook Energy Center,
LLC, Zion Energy LLC.
Description: Quarterly Land Acquisition Report of the Calpine MBR
Sellers.
Filed Date: 7/29/14.
Accession Number: 20140729-5136.
Comments Due: 5 p.m. ET 8/19/14.
Docket Numbers: LA14-2-000.
Applicants: Cedar Creek II, LLC, Copper Mountain Solar 1, LLC,
Copper Mountain Solar 2, LLC, Copper Mountain Solar 3, LLC, Energia
Sierra Juarez U.S., LLC, Flat Ridge 2 Wind Energy LLC, Fowler Ridge II
Wind Farm LLC, Mehoopany Wind Energy LLC, Mesquite Power, LLC, Mesquite
Solar 1, LLC, San Diego Gas & Electric Company, Sempra Generation, LLC,
Termoelectrica U.S., LLC.
Description: Quarterly Land Acquisition Report of Sempra
Generation, LLC, et. al.
Filed Date: 7/29/14.
Accession Number: 20140729-5137
Comments Due: 5 p.m. ET 8/19/14.
Docket Numbers: LA14-2-000.
Applicants: All Dams Generation, LLC, Arlington Valley Solar Energy
II, LLC, Bluegrass Generation Company, L.L.C., Calhoun Power Company,
LLC, Carville Energy LLC, Centinela Solar Energy, LLC, Cherokee County
Cogeneration Partners, LLC, Columbia Energy LLC, Decatur Energy Center,
LLC, DeSoto County Generating Company, LLC, Doswell Limited
Partnership, Lake Lynn Generation, LLC, Las Vegas Power Company, LLC,
LS Power Marketing, LLC, LSP University Park, LLC, Mobile Energy LLC,
Oneta Power, LLC, PE Hydro Generation, LLC, Renaissance Power, L.L.C.,
Riverside Generating Company, L.L.C., Rocky Road Power, LLC, Santa Rosa
Energy Center, LLC, Seneca Generation, LLC, Tilton Energy LLC,
University Park Energy, LLC, Wallingford Energy LLC, West Deptford
Energy, LLC.
Description: Quarterly Land Acquisition Report of the LS MBR
Sellers.
[[Page 45795]]
Filed Date: 7/29/14.
Accession Number: 20140729-5138
Comments Due: 5 p.m. ET 8/19/14.
Docket Numbers: LA14-2-000.
Applicants: Iberdrola Renewables, LLC, Atlantic Renewable Projects
II LLC, Barton Windpower LLC, Big Horn Wind Project LLC, Big Horn II
Wind Project LLC, Blue Creek Wind Farm LLC, Buffalo Ridge I LLC,
Buffalo Ridge II LLC, Casselman Windpower LLC, Colorado Green Holdings
LLC, Dillon Wind LLC, Dry Lake Wind Power, LLC, Dry Lake Wind Power II
LLC, Elk River Windfarm, LLC, Elm Creek Wind, LLC, Elm Creek Wind II
LLC, Farmers City Wind, LLC, Flat Rock Windpower LLC, Flat Rock
Windpower II LLC, Flying Cloud Power Partners, LLC, Groton Wind, LLC,
Hardscrabble Wind Power LLC, Hay Canyon Wind LLC, Juniper Canyon Wind
Power LLC, Klamath Energy LLC, Klamath Generation LLC, Klondike Wind
Power LLC, Klondike Wind Power II LLC, Klondike Wind Power III LLC,
Leaning Juniper Wind Power II LLC, Lempster Wind, LLC, Locust Ridge
Wind Farm, LLC, Locust Ridge II, LLC, Manzana Wind LLC, MinnDakota Wind
LLC, Moraine Wind LLC, Moraine Wind II LLC, Mountain View Power
Partners III, LLC, New England Wind, LLC, New Harvest Wind Project LLC,
Northern Iowa Windpower II LLC, Pebble Springs Wind LLC, Providence
Heights Wind, LLC, Rugby Wind LLC, San Luis Solar LLC, Shiloh I Wind
Project, LLC, South Chestnut LLC, Star Point Wind Project LLC,
Streator-Cayuga Ridge Wind Power LLC, Trimont Wind I LLC, and Twin
Buttes Wind LLC.
Description: Quarterly Land Acquisition Report of the Iberdrola MBR
Sellers.
Filed Date: 7/29/14.
Accession Number: 20140729-5139.
Comments Due: 5 p.m. ET 8/19/14.
Docket Numbers: LA14-2-000.
Applicants: Blue Sky East, LLC, Canandaigua Power Partners, LLC,
Canandaigua Power Partners II, LLC, Erie Wind, LLC, Evergreen Wind
Power, LLC, Evergreen Wind Power III, LLC, First Wind Energy Marketing,
LLC, Longfellow Wind, LLC, Milford Wind Corridor Phase I, LLC, Milford
Wind Corridor Phase II, LLC, Palouse Wind, LLC, Niagara Wind Power,
LLC, Stetson Holdings, LLC, Stetson Wind II, LLC, Vermont Wind, LLC.
Description: Quarterly Land Acquisition Report of the First Wind
MBR Companies.
Filed Date: 7/30/14.
Accession Number: 20140730-5028.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: LA14-2-000.
Applicants: Southern Company Services, Inc., Alabama Power Company,
Georgia Power Company, Gulf Power Company, Mississippi Power Company,
Southern Power Company.
Description: Quarterly Land Acquisition Report of Southern Company
Services, Inc. (as Agent).
Filed Date: 7/30/14.
Accession Number: 20140730-5056.
Comments Due: 5 p.m. ET 8/20/14.
Docket Numbers: LA14-2-000.
Applicants: Alta Wind I, LLC, Alta Wind II, LLC, Alta Wind III,
LLC, Alta Wind IV, LLC, Alta Wind V, LLC, Alta Wind X, LLC, Alta Wind
XI, LLC, ArcLight Energy Marketing, LLC, Badger Creek Limited, Coso
Geothermal Power Holdings, LLC, Double ``C'' Limited, High Sierra
Limited, Kern Front Limited, Oak Creek Wind Power, LLC, TGP Energy
Management, LLC, and Victory Garden Phase IV, LLC.
Description: Quarterly Land Acquisition Report of Alta Wind I, LLC,
et. al.
Filed Date: 7/30/14.
Accession Number: 20140730-5106.
Comments Due: 5 p.m. ET 8/20/14.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: July 30, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014-18580 Filed 8-5-14; 8:45 am]
BILLING CODE 6717-01-P