Southern Natural Gas Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Zone 3 Expansion Project and Request for Comments on Environmental Issues, 44763-44765 [2014-18188]

Download as PDF Federal Register / Vol. 79, No. 148 / Friday, August 1, 2014 / Notices Docket Numbers: LA14–2–000. Applicants: Blackstone Wind Farm, LLC, Blackstone Wind Farm II LLC, Headwaters Wind Farm LLC, High Trail Wind Farm, LLC, Meadow Lake Wind Farm LLC, Meadow Lake Wind Farm II LLC, Meadow Lake Wind Farm III LLC, Meadow Lake Wind Farm IV LLC, Old Trail Wind Farm, LLC, Paulding Wind Farm II LLC, Sustaining Power Solutions LLC. Description: Quarterly Land Acquisition Report of Blackstone Wind Farm, LLC, et al. Filed Date: 7/25/14. Accession Number: 20140725–5107. Comments Due: 5 p.m. ET 8/15/14. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 25, 2014. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2014–18208 Filed 7–31–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP14–493–000] tkelley on DSK3SPTVN1PROD with NOTICES Southern Natural Gas Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Zone 3 Expansion Project and Request for Comments on Environmental Issues The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the Zone 3 Expansion Project involving construction and operation of facilities by Southern Natural Gas Company, LLC (Southern) in Marengo County, VerDate Mar<15>2010 22:09 Jul 31, 2014 Jkt 232001 Alabama, Duval and Nassau Counties, Florida, Glynn, Liberty, Upson and Wayne Counties, Georgia, and Saint Bernard Parish, Louisiana. The Commission will use this EA in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies on the project. Your input will help the Commission staff determine what issues they need to evaluate in the EA. Please note that the scoping period will close on August 27, 2014. This notice is being sent to the Commission’s current environmental mailing list for this project. State and local government representatives should notify their constituents of this proposed project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, a pipeline company representative may contact you about the acquisition of an easement to construct, operate, and maintain the proposed facilities. The company would seek to negotiate a mutually acceptable agreement. However, if the Commission approves the project, that approval conveys with it the right of eminent domain. Therefore, if easement negotiations fail to produce an agreement, the pipeline company could initiate condemnation proceedings where compensation would be determined in accordance with state law. Southern provided landowners with a fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ This fact sheet addresses a number of typically-asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. It is also available for viewing on the FERC Web site (www.ferc.gov). Summary of the Proposed Project Southern proposes to provide approximately 235 million cubic feet per day of new firm transportation capacity to certain customers in its system’s Zone 3 from new supply sources at the existing Elba Express Company, L.L.C. interconnections with Transcontinental Gas Pipe Line Company in Hart County, Georgia and Anderson County, South Carolina. Construction of the project is planned to begin soon after June 1, 2015 in order to meet the proposed in-service date of June 1, 2016. The Zone 3 Expansion PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 44763 project would include the following facilities: • 3.3 miles of 36-inch-diameter looping 1 along with pig 2 receiving/ launching facilities along the south side of Southern’s 30-inch-diameter South Main 2nd Loop Line in Marengo County, Alabama; • one new 4,000-horsepower (hp) compressor unit at Southern’s existing Thomaston Compressor Station in Upson County, Georgia; • abandonment of a 4,700-hp compressor unit 15 at Southern’s Toca Compressor Station in Bernard Parish, Louisiana; • installation/relocation of the 4,700 hp compressor unit 15 along with new gas cooling at Southern’s Riceboro Compressor Station in Liberty County, Georgia; • installation of gas cooling at Southern’s Brookman Compressor Station in Glynn County, Georgia; • one new Hilliard Compressor Station with a 4,700 hp unit in Nassau County, Florida (compressor station site previously certificated in the CP05–388 Southern Cypress Pipeline Project); • upgrade of the Jesup Meter Station in Wayne County, Georgia; and • installation of up to three taps and Supervisory Control and Data Acquisition systems along Southern’s Cypress Line in Nassau/Duval Counties, Florida. A map depicting the general location of the project facilities is included in appendix 1.3 Land Requirements for Construction Southern proposes to use 137 acres of land for construction of the project, and would retain 20 acres of new permanent right-of-way for operations. The 3.3-mile loop pipeline portion would require 86 acres for construction and would retain 14 acres for operations. The remaining 72 acres would be restored and allowed to revert to former uses. The compressor station portion of the project would require 51 acres for construction and retain 4.5 acres of new permanent rightof-way for operations. 1 A pipeline loop is a segment of pipe constructed parallel to an existing pipeline to increase capacity. 2 A ‘‘pig’’ is a tool that the pipeline company inserts into and pushes through the pipeline for cleaning the pipeline, conducting internal inspections, or other purposes. 3 The appendices referenced in this notice are not being printed in the Federal Register. Copies of appendices were sent to all those receiving this notice in the mail and are available at www.ferc.gov using the link called ‘‘eLibrary’’ or from the Commission’s Public Reference Room, 888 First Street NE., Washington, DC 20426, or call (202) 502–8371. For instructions on connecting to eLibrary, refer to the last page of this notice. E:\FR\FM\01AUN1.SGM 01AUN1 tkelley on DSK3SPTVN1PROD with NOTICES 44764 Federal Register / Vol. 79, No. 148 / Friday, August 1, 2014 / Notices The EA Process The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from an action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. NEPA also requires us 4 to discover and address concerns the public may have about proposals. This process is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this notice, the Commission requests public comments on the scope of the issues to address in the EA. We will consider all filed comments during the preparation of the EA. In the EA we will discuss impacts that could occur as a result of the construction and operation of the proposed project under these general headings: • Geology and soils; • water resources, fisheries, and wetlands; • vegetation, wildlife, threatened and endangered species, and migratory birds; • cultural resources; • land use and cumulative impacts; • air quality and noise; and • public safety. We will also evaluate reasonable alternatives to the planned project or portions of the project, and make recommendations on how to lessen or avoid impacts on the various resource areas. The EA will present our independent analysis of the issues. The EA will be available in the public record through eLibrary. Depending on the comments received during the scoping process, we may also publish and distribute the EA to the public for an allotted comment period. We will consider all comments on the EA before making our recommendations to the Commission. To ensure we have the opportunity to consider and address your comments, please carefully follow the instructions in the Public Participation section below. With this notice, we are asking agencies with jurisdiction by law and/ or special expertise with respect to the environmental issues of this project to formally cooperate with us in the preparation of the EA.5 Agencies that would like to request cooperating 4 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the environmental staff of the Commission’s Office of Energy Projects. 5 The Council on Environmental Quality regulations addressing cooperating agency responsibilities are at Title 40, Code of Federal Regulations, § 1501.6. VerDate Mar<15>2010 22:09 Jul 31, 2014 Jkt 232001 agency status should follow the instructions for filing comments provided under the Public Participation section of this notice. Consultations Under Section 106 of the National Historic Preservation Act In accordance with the Advisory Council on Historic Preservation’s implementing regulations for section 106 of the National Historic Preservation Act, we are using this notice to initiate consultation with applicable State Historic Preservation Office (SHPO), and to solicit their views and those of other government agencies, interested Indian tribes, and the public on the project’s potential effects on historic properties.6 We will define the project-specific Area of Potential Effects (APE) in consultation with the SHPOs as the project develops. On natural gas facility projects, the APE at a minimum encompasses all areas subject to ground disturbance (examples include construction right-of-way, contractor/ pipe storage yards, compressor stations, and access roads). Our EA for this project will document our findings on the impacts on historic properties and summarize the status of consultations under section 106. Public Participation You can make a difference by providing us with your specific comments or concerns about the project. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that your comments are timely and properly recorded, please send your comments so that the Commission receives them in Washington, DC on or before August 27, 2014. For your convenience, there are three methods which you can use to submit your comments to the Commission. In all instances please reference the project docket number (CP14–493–000) with your submission. The Commission encourages electronic filing of comments and has expert staff available to assist you at (202) 502–8258 or efiling@ferc.gov. (1) You can file your comments electronically using the eComment feature on the Commission’s Web site (www.ferc.gov) under the link to 6 The Advisory Council on Historic Preservation’s regulations are at Title 36, Code of Federal Regulations, Part 800. Those regulations define historic properties as any prehistoric or historic district, site, building, structure, or object included in or eligible for inclusion in the National Register of Historic Places. PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 Documents and Filings. This is an easy method for interested persons to submit brief, text-only comments on a project; (2) You can file your comments electronically using the eFiling feature on the Commission’s Web site (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You must select the type of filing you are making. If you are filing a comment on a particular project, please select ‘‘Comment on a Filing’’; or (3) You can file a paper copy of your comments by mailing them to the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC 20426. Environmental Mailing List The environmental mailing list includes federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission’s regulations) who are potential right-of-way grantors, whose property may be used temporarily for project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project. We will update the environmental mailing list as the analysis proceeds to ensure that we send the information related to this environmental review to all individuals, organizations, and government entities interested in and/or potentially affected by the proposed project. If we publish and distribute the EA, copies will be sent to the environmental mailing list for public review and comment. If you would prefer to receive a paper copy of the document instead of the CD version or would like to remove your name from the mailing list, please return the attached Information Request (appendix 2). Becoming an Intervenor In addition to involvement in the EA scoping process, you may want to become an ‘‘intervenor’’ which is an official party to the Commission’s proceeding. Intervenors play a more formal role in the process and are able to file briefs, appear at hearings, and be heard by the courts if they choose to appeal the Commission’s final ruling. An intervenor formally participates in E:\FR\FM\01AUN1.SGM 01AUN1 Federal Register / Vol. 79, No. 148 / Friday, August 1, 2014 / Notices the proceeding by filing a request to intervene. Instructions for becoming an intervenor are in the User’s Guide under the ‘‘e-filing’’ link on the Commission’s Web site. Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC Web site at www.ferc.gov using the ‘‘eLibrary’’ link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number, excluding the last three digits in the Docket Number field (i.e., CP14–493). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission now offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/ esubscribenow.htm. Finally, public meetings or site visits will be posted on the Commission’s calendar located at www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. Dated: July 28, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–18188 Filed 7–31–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER14–2500–000] tkelley on DSK3SPTVN1PROD with NOTICES Newark Energy Center, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization Dated: July 28, 2014. Nathaniel J. Davis, Sr., Deputy Secretary. This is a supplemental notice in the above-referenced proceeding of Newark Energy Center, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR VerDate Mar<15>2010 22:09 Jul 31, 2014 Jkt 232001 part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is August 18, 2014. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. [FR Doc. 2014–18210 Filed 7–31–14; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 44765 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER14–2498–000] EIF Newark, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of EIF Newark, LLC’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is August 18, 2014. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email E:\FR\FM\01AUN1.SGM 01AUN1

Agencies

[Federal Register Volume 79, Number 148 (Friday, August 1, 2014)]
[Notices]
[Pages 44763-44765]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-18188]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP14-493-000]


Southern Natural Gas Company, LLC; Notice of Intent To Prepare an 
Environmental Assessment for the Proposed Zone 3 Expansion Project and 
Request for Comments on Environmental Issues

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the Zone 3 Expansion Project 
involving construction and operation of facilities by Southern Natural 
Gas Company, LLC (Southern) in Marengo County, Alabama, Duval and 
Nassau Counties, Florida, Glynn, Liberty, Upson and Wayne Counties, 
Georgia, and Saint Bernard Parish, Louisiana. The Commission will use 
this EA in its decision-making process to determine whether the project 
is in the public convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the project. Your input will help the Commission staff 
determine what issues they need to evaluate in the EA. Please note that 
the scoping period will close on August 27, 2014.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this proposed 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the proposed facilities. The company 
would seek to negotiate a mutually acceptable agreement. However, if 
the Commission approves the project, that approval conveys with it the 
right of eminent domain. Therefore, if easement negotiations fail to 
produce an agreement, the pipeline company could initiate condemnation 
proceedings where compensation would be determined in accordance with 
state law.
    Southern provided landowners with a fact sheet prepared by the FERC 
entitled ``An Interstate Natural Gas Facility On My Land? What Do I 
Need To Know?'' This fact sheet addresses a number of typically-asked 
questions, including the use of eminent domain and how to participate 
in the Commission's proceedings. It is also available for viewing on 
the FERC Web site (www.ferc.gov).

Summary of the Proposed Project

    Southern proposes to provide approximately 235 million cubic feet 
per day of new firm transportation capacity to certain customers in its 
system's Zone 3 from new supply sources at the existing Elba Express 
Company, L.L.C. interconnections with Transcontinental Gas Pipe Line 
Company in Hart County, Georgia and Anderson County, South Carolina. 
Construction of the project is planned to begin soon after June 1, 2015 
in order to meet the proposed in-service date of June 1, 2016. The Zone 
3 Expansion project would include the following facilities:
     3.3 miles of 36-inch-diameter looping \1\ along with pig 
\2\ receiving/launching facilities along the south side of Southern's 
30-inch-diameter South Main 2nd Loop Line in Marengo County, Alabama;
---------------------------------------------------------------------------

    \1\ A pipeline loop is a segment of pipe constructed parallel to 
an existing pipeline to increase capacity.
    \2\ A ``pig'' is a tool that the pipeline company inserts into 
and pushes through the pipeline for cleaning the pipeline, 
conducting internal inspections, or other purposes.
---------------------------------------------------------------------------

     one new 4,000-horsepower (hp) compressor unit at 
Southern's existing Thomaston Compressor Station in Upson County, 
Georgia;
     abandonment of a 4,700-hp compressor unit 15 at Southern's 
Toca Compressor Station in Bernard Parish, Louisiana;
     installation/relocation of the 4,700 hp compressor unit 15 
along with new gas cooling at Southern's Riceboro Compressor Station in 
Liberty County, Georgia;
     installation of gas cooling at Southern's Brookman 
Compressor Station in Glynn County, Georgia;
     one new Hilliard Compressor Station with a 4,700 hp unit 
in Nassau County, Florida (compressor station site previously 
certificated in the CP05-388 Southern Cypress Pipeline Project);
     upgrade of the Jesup Meter Station in Wayne County, 
Georgia; and
     installation of up to three taps and Supervisory Control 
and Data Acquisition systems along Southern's Cypress Line in Nassau/
Duval Counties, Florida.
    A map depicting the general location of the project facilities is 
included in appendix 1.\3\
---------------------------------------------------------------------------

    \3\ The appendices referenced in this notice are not being 
printed in the Federal Register. Copies of appendices were sent to 
all those receiving this notice in the mail and are available at 
www.ferc.gov using the link called ``eLibrary'' or from the 
Commission's Public Reference Room, 888 First Street NE., 
Washington, DC 20426, or call (202) 502-8371. For instructions on 
connecting to eLibrary, refer to the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Southern proposes to use 137 acres of land for construction of the 
project, and would retain 20 acres of new permanent right-of-way for 
operations. The 3.3-mile loop pipeline portion would require 86 acres 
for construction and would retain 14 acres for operations. The 
remaining 72 acres would be restored and allowed to revert to former 
uses. The compressor station portion of the project would require 51 
acres for construction and retain 4.5 acres of new permanent right-of-
way for operations.

[[Page 44764]]

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
\4\ to discover and address concerns the public may have about 
proposals. This process is referred to as ``scoping.'' The main goal of 
the scoping process is to focus the analysis in the EA on the important 
environmental issues. By this notice, the Commission requests public 
comments on the scope of the issues to address in the EA. We will 
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------

    \4\ ``We,'' ``us,'' and ``our'' refer to the environmental staff 
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA we will discuss impacts that could occur as a result of 
the construction and operation of the proposed project under these 
general headings:
     Geology and soils;
     water resources, fisheries, and wetlands;
     vegetation, wildlife, threatened and endangered species, 
and migratory birds;
     cultural resources;
     land use and cumulative impacts;
     air quality and noise; and
     public safety.
    We will also evaluate reasonable alternatives to the planned 
project or portions of the project, and make recommendations on how to 
lessen or avoid impacts on the various resource areas.
    The EA will present our independent analysis of the issues. The EA 
will be available in the public record through eLibrary. Depending on 
the comments received during the scoping process, we may also publish 
and distribute the EA to the public for an allotted comment period. We 
will consider all comments on the EA before making our recommendations 
to the Commission. To ensure we have the opportunity to consider and 
address your comments, please carefully follow the instructions in the 
Public Participation section below.
    With this notice, we are asking agencies with jurisdiction by law 
and/or special expertise with respect to the environmental issues of 
this project to formally cooperate with us in the preparation of the 
EA.\5\ Agencies that would like to request cooperating agency status 
should follow the instructions for filing comments provided under the 
Public Participation section of this notice.
---------------------------------------------------------------------------

    \5\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Sec.  1501.6.
---------------------------------------------------------------------------

Consultations Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, we are using this notice to initiate consultation 
with applicable State Historic Preservation Office (SHPO), and to 
solicit their views and those of other government agencies, interested 
Indian tribes, and the public on the project's potential effects on 
historic properties.\6\ We will define the project-specific Area of 
Potential Effects (APE) in consultation with the SHPOs as the project 
develops. On natural gas facility projects, the APE at a minimum 
encompasses all areas subject to ground disturbance (examples include 
construction right-of-way, contractor/pipe storage yards, compressor 
stations, and access roads). Our EA for this project will document our 
findings on the impacts on historic properties and summarize the status 
of consultations under section 106.
---------------------------------------------------------------------------

    \6\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Public Participation

    You can make a difference by providing us with your specific 
comments or concerns about the project. Your comments should focus on 
the potential environmental effects, reasonable alternatives, and 
measures to avoid or lessen environmental impacts. The more specific 
your comments, the more useful they will be. To ensure that your 
comments are timely and properly recorded, please send your comments so 
that the Commission receives them in Washington, DC on or before August 
27, 2014.
    For your convenience, there are three methods which you can use to 
submit your comments to the Commission. In all instances please 
reference the project docket number (CP14-493-000) with your 
submission. The Commission encourages electronic filing of comments and 
has expert staff available to assist you at (202) 502-8258 or 
efiling@ferc.gov.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for interested persons to 
submit brief, text-only comments on a project;
    (2) You can file your comments electronically using the eFiling 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
``eRegister.'' You must select the type of filing you are making. If 
you are filing a comment on a particular project, please select 
``Comment on a Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC 
20426.

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the project. We will update the environmental mailing list 
as the analysis proceeds to ensure that we send the information related 
to this environmental review to all individuals, organizations, and 
government entities interested in and/or potentially affected by the 
proposed project.
    If we publish and distribute the EA, copies will be sent to the 
environmental mailing list for public review and comment. If you would 
prefer to receive a paper copy of the document instead of the CD 
version or would like to remove your name from the mailing list, please 
return the attached Information Request (appendix 2).

Becoming an Intervenor

    In addition to involvement in the EA scoping process, you may want 
to become an ``intervenor'' which is an official party to the 
Commission's proceeding. Intervenors play a more formal role in the 
process and are able to file briefs, appear at hearings, and be heard 
by the courts if they choose to appeal the Commission's final ruling. 
An intervenor formally participates in

[[Page 44765]]

the proceeding by filing a request to intervene. Instructions for 
becoming an intervenor are in the User's Guide under the ``e-filing'' 
link on the Commission's Web site.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site at www.ferc.gov using the ``eLibrary'' link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number, 
excluding the last three digits in the Docket Number field (i.e., CP14-
493). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission now offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/esubscribenow.htm.
    Finally, public meetings or site visits will be posted on the 
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

    Dated: July 28, 2014.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2014-18188 Filed 7-31-14; 8:45 am]
BILLING CODE 6717-01-P