Alabama Power Company: Notice Soliciting Scoping Comments, 44446-44447 [2014-18010]
Download as PDF
wreier-aviles on DSK5TPTVN1PROD with NOTICES
44446
Federal Register / Vol. 79, No. 147 / Thursday, July 31, 2014 / Notices
The first page of any filing should
include docket number P–2492–013.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing and is now ready for
environmental analysis.
l. The existing Vanceboro Dam
Storage Project consists of: (1) A 16-foothigh, 469-foot-long dam comprised of a
170-foot-long earthen embankment
section, a 230-foot-long earthen
embankment section, and a 69-foot-long
gated concrete spillway section with
two 22.5-foot-long, 14.5-foot-high steel
Tainter gates with a crest elevation of
385.86 feet above mean sea level (msl);
(2) an 8-foot-wide concrete vertical-slot
fishway; (3) an 18,558-acre
impoundment (Spednik Lake) with a
maximum pool elevation of 385.86 feet
msl; and (4) appurtenant facilities.
The Vanceboro Dam Storage Project
operates in a store-and-release mode
with the impoundment elevation
fluctuating on an annual basis. The
existing license requires a minimum
impoundment elevation of 371.5 feet
msl between October 1 and April 30; a
minimum impoundment elevation of
376.5 feet msl between May 1 and
September 30; a maximum
impoundment elevation of 385.86 feet
msl; and a year round minimum
downstream flow of 200 cubic feet per
second in the east branch of the Saint
Croix River downstream of the project.
Woodland Pulp is not proposing any
new project facilities or changes in
project operation.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
VerDate Mar<15>2010
14:56 Jul 30, 2014
Jkt 232001
n. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, and .214. In determining
the appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST,’’ ‘‘MOTION
TO INTERVENE,’’ ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’
‘‘PRELIMINARY TERMS AND
CONDITIONS,’’ or ‘‘PRELIMINARY
FISHWAY PRESCRIPTIONS;’’ (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, recommendations, terms
and conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
o. Procedural Schedule:
The application will be processed
according to the following revised
Hydro Licensing Schedule. Revisions to
the schedule may be made as
appropriate.
Milestone
Target date
Filing of recommendations,
preliminary terms and
conditions, and preliminary fishway prescriptions.
Commission issues EA ......
Comments on EA ..............
Modified terms and conditions.
September 2014
January 2015
February 2015
March 2015
p. Final amendments to the
application must be filed with the
PO 00000
Frm 00064
Fmt 4703
Sfmt 4703
Commission no later than 30 days from
the issuance date of this notice.
q. A license applicant must file no
later than 60 days following the date of
issuance of the notice of acceptance and
ready for environmental analysis
provided for in 5.22: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Dated: July 24, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–18008 Filed 7–30–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2203–015]
Alabama Power Company: Notice
Soliciting Scoping Comments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2203–015.
c. Date filed: August 16, 2013.
d. Applicant: Alabama Power
Company (Alabama Power).
e. Name of Project: Holt Hydroelectric
Project.
f. Location: The project is located at
the U.S. Army Corps of Engineers’
existing Holt Lock and Dam on the
Black Warrior River in Tuscaloosa
County, Alabama and occupies 36.64
acres of Corps lands.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contacts: Mr. Jim
Heilbron, Senior Vice President and
Senior Production Officer, Alabama
Power Company, 600 North 18th Street,
P.O. Box 2641, Birmingham, AL 35203–
2206, (205) 257–1000.
i. FERC Contact: Jeanne Edwards at
(202) 502–6181, or via email at
jeanne.edwards@ferc.gov.
j. Deadline for filing scoping
comments: 30 days from the issuance
date of this notice.
The Commission strongly encourages
electronic filing. Please file scoping
comments using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
E:\FR\FM\31JYN1.SGM
31JYN1
wreier-aviles on DSK5TPTVN1PROD with NOTICES
Federal Register / Vol. 79, No. 147 / Thursday, July 31, 2014 / Notices
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–2203–015.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application is not ready for
environmental analysis at this time.
l. Portions of the existing Holt Project
facilities that are owned and operated
by Alabama Power consist of: (1) A 130foot-long concrete non-overflow dam;
(2) a 110-foot long earth fill dam located
between the non-overflow structure and
the right abutment; (3) a powerhouse
integral with the dam containing one
turbine with an installed capacity of
46,944-kilowatts; (4) a 2.48-mile-long
transmission line; and (5) Overlook
Park, a project recreation site. The
applicant estimates that the total
average annual generation would be
153,604,600 kilowatt hours. All
generated power is utilized within the
applicant’s electric utility system.
Additionally, Alabama Power proposes
correct the mapping of the project
boundary from 46.59 acres to 50.08
acres. The change would affect privately
owned lands, resulting in no land
disturbing activities.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room, or may be
viewed on the Commission’s Web site at
https://www.ferc.gov, using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document. For assistance, contact FERC
Online Support. A copy is available for
inspection and reproduction at the
address in item h above.
You may register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
VerDate Mar<15>2010
14:56 Jul 30, 2014
Jkt 232001
For assistance, contact FERC Online
Support.
n. Scoping Process
The Commission staff intends to
prepare an Environmental Assessment
(EA) for the Holt Hydroelectric Project,
in accordance with the National
Environmental Policy Act. The EA will
consider both site-specific and
cumulative environmental impacts and
reasonable alternatives to the proposed
action.
Commission staff does not propose to
conduct any on-site scoping meetings at
this time. Instead, we are soliciting
comments, recommendations, and
information on the Scoping Document
(SD) issued on July 23, 2014.
Copies of the SD outlining the subject
areas to be addressed in the EA were
distributed to the parties on the
Commission’s mailing list and the
applicant’s distribution list. Copies of
the SD may be viewed on the web at
https://www.ferc.gov, using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document. For assistance, call 1–866–
208–3676, or for TTY, (202) 502–8659.
Dated: July 23, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–18010 Filed 7–30–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP14–522–000; PF14–5–000]
Algonquin Gas Transmission, LLC;
Notice of Application
July 24, 2014.
Take notice that on July 10, 2014,
Algonquin Gas Transmission, LLC
(Algonquin), 5400 Westheimer Court,
Houston, Texas 77056, filed an
application in Docket No. CP14–522–
000, pursuant to section 7(c) of the
Natural Gas Act (NGA), and Part 157 of
the Commission’s regulations, for
authority to construct, and operate its
Salem Lateral Project (Salem Lateral)
located in Salem, Massachusetts.
Specifically, Algonquin requests
authority to (1) construct 1.2 miles of 16
inch diameter pipeline and associated
facilities, (2) construct one new
metering and regulating station, and (3)
establish an initial recourse rate for
service on the Salem Lateral, in order to
provide 115,000 dekatherms per day of
firm transportation service to the
redeveloped Salem Harbor Station
PO 00000
Frm 00065
Fmt 4703
Sfmt 4703
44447
facility of Footprint Power Salem
Harbor Development, LP., all as more
fully set forth in the application, which
is on file with the Commission and open
to public inspection. This filing may
also be viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application should be directed to Berk
Donaldson, General Manager, Rates and
Certificates, or DeAndra Black, Analyst,
Rates and Certificates, Algonquin Gas
Transmission, LLC, P.O. Box 1642,
Houston, Texas 77251–1642, or by
phone at 713–627–4488, by fax at 713–
627–5947, or by email at bdonaldson@
spectraenergy.com.
On November 4, 2013, Commission
staff granted Algonquin’s request to use
the pre-filing process and assigned
Docket No. PF14–5–000 to staff
activities involving the Salem Lateral.
Now, as of the filing of this application
on July 10, 2014, the NEPA Pre-Filing
Process for this project has ended. From
this time forward, this proceeding will
be conducted in Docket No. CP14–522–
000 as noted in the caption of this
Notice.
Pursuant to section 157.9 of the
Commission’s regulations, 18 CFR
157.9, within 90 days of this Notice, the
Commission’s staff will either complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission’s staff issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to reach a final
decision on a request for federal
authorization within 90 days of the date
of issuance of the Commission staff’s
EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
E:\FR\FM\31JYN1.SGM
31JYN1
Agencies
[Federal Register Volume 79, Number 147 (Thursday, July 31, 2014)]
[Notices]
[Pages 44446-44447]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-18010]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2203-015]
Alabama Power Company: Notice Soliciting Scoping Comments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2203-015.
c. Date filed: August 16, 2013.
d. Applicant: Alabama Power Company (Alabama Power).
e. Name of Project: Holt Hydroelectric Project.
f. Location: The project is located at the U.S. Army Corps of
Engineers' existing Holt Lock and Dam on the Black Warrior River in
Tuscaloosa County, Alabama and occupies 36.64 acres of Corps lands.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contacts: Mr. Jim Heilbron, Senior Vice President and
Senior Production Officer, Alabama Power Company, 600 North 18th
Street, P.O. Box 2641, Birmingham, AL 35203-2206, (205) 257-1000.
i. FERC Contact: Jeanne Edwards at (202) 502-6181, or via email at
jeanne.edwards@ferc.gov.
j. Deadline for filing scoping comments: 30 days from the issuance
date of this notice.
The Commission strongly encourages electronic filing. Please file
scoping comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration,
[[Page 44447]]
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. The first page of any filing should
include docket number P-2203-015.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application is not ready for environmental analysis at this
time.
l. Portions of the existing Holt Project facilities that are owned
and operated by Alabama Power consist of: (1) A 130-foot-long concrete
non-overflow dam; (2) a 110-foot long earth fill dam located between
the non-overflow structure and the right abutment; (3) a powerhouse
integral with the dam containing one turbine with an installed capacity
of 46,944-kilowatts; (4) a 2.48-mile-long transmission line; and (5)
Overlook Park, a project recreation site. The applicant estimates that
the total average annual generation would be 153,604,600 kilowatt
hours. All generated power is utilized within the applicant's electric
utility system. Additionally, Alabama Power proposes correct the
mapping of the project boundary from 46.59 acres to 50.08 acres. The
change would affect privately owned lands, resulting in no land
disturbing activities.
m. A copy of the application is available for review at the
Commission in the Public Reference Room, or may be viewed on the
Commission's Web site at https://www.ferc.gov, using the ``eLibrary''
link. Enter the docket number, excluding the last three digits in the
docket number field, to access the document. For assistance, contact
FERC Online Support. A copy is available for inspection and
reproduction at the address in item h above.
You may register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Scoping Process
The Commission staff intends to prepare an Environmental Assessment
(EA) for the Holt Hydroelectric Project, in accordance with the
National Environmental Policy Act. The EA will consider both site-
specific and cumulative environmental impacts and reasonable
alternatives to the proposed action.
Commission staff does not propose to conduct any on-site scoping
meetings at this time. Instead, we are soliciting comments,
recommendations, and information on the Scoping Document (SD) issued on
July 23, 2014.
Copies of the SD outlining the subject areas to be addressed in the
EA were distributed to the parties on the Commission's mailing list and
the applicant's distribution list. Copies of the SD may be viewed on
the web at https://www.ferc.gov, using the ``eLibrary'' link. Enter the
docket number, excluding the last three digits in the docket number
field, to access the document. For assistance, call 1-866-208-3676, or
for TTY, (202) 502-8659.
Dated: July 23, 2014.
Kimberly D. Bose,
Secretary.