Dominion Transmission, Inc.: Notice of Intent To Prepare an Environmental Assessment for the Proposed Clarington Project and Request for Comments on Environmental Issues, 44448-44450 [2014-18006]

Download as PDF wreier-aviles on DSK5TPTVN1PROD with NOTICES 44448 Federal Register / Vol. 79, No. 147 / Thursday, July 31, 2014 / Notices First Street NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 7 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. See, 18 VerDate Mar<15>2010 14:56 Jul 30, 2014 Jkt 232001 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. Comment Date: 5:00 p.m. Eastern Time on August 14, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–18007 Filed 7–30–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP14–496–000] Dominion Transmission, Inc.: Notice of Intent To Prepare an Environmental Assessment for the Proposed Clarington Project and Request for Comments on Environmental Issues The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the Clarington Project (Project) involving construction and operation of facilities by Dominion Transmission, Inc. (DTI) in Marshall County, West Virginia and Monroe County, Ohio. The Commission will use this EA in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies on the Project. Your input will help the Commission staff determine what issues they need to evaluate in the EA. Please note that the scoping period will close on August 23, 2014. You may submit comments in written form or verbally. Further details on how to submit written comments are in the Public Participation section of this notice. This notice is being sent to the Commission’s current environmental mailing list for this Project. State and local government representatives should notify their constituents of this proposed Project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, a pipeline company representative may contact you about the acquisition of an easement to construct, operate, and maintain the proposed facilities. The company would seek to negotiate a mutually acceptable agreement. However, if the Commission approves the Project, that approval conveys with it the right of eminent PO 00000 Frm 00066 Fmt 4703 Sfmt 4703 domain. Therefore, if easement negotiations fail to produce an agreement, the pipeline company could initiate condemnation proceedings where compensation would be determined in accordance with state law. DTI provided landowners with a fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ This fact sheet addresses a number of typically-asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. It is also available for viewing on the FERC Web site (www.ferc.gov). Summary of the Proposed Project DTI proposes to construct, install, own, operate and maintain certain compression facilities located in Marshall County, West Virginia and Monroe County, Ohio. The Project would provide 250,000 dekatherms per day of firm transportation service for CNX Gas Company, LLC at a proposed new interconnect known as the TETArman Hill Interconnect and at a proposed new interconnect known as the REX-German Ridge Interconnect, both of which are located in Monroe County, OH. According to DTI, its Project would create increased access for production in this region to major natural gas markets of the Northeast and Mid-Atlantic regions of the United States. The Clarington Project would consist of the following facilities: • A new 6,130 horsepower (hp) gas turbine/compressor package and auxiliary equipment at DTI’s existing Burch Ridge Station in Marshall County, WV; • Two new 5,000 hp reciprocating compression units and auxiliary equipment at DTI’s existing Mullett Station in Monroe County, OH; • 2,612 feet of new 20-inch-diameter suction piping and 2,756 feet of new 16inch-diameter discharge piping which would connect the Mullett Compressor Station to two proposed new interconnects; • Two new metering and regulation facilities in Monroe County, OH: The TET-Arman Hill Interconnect and the REX-German Ridge Interconnect; and • A 987-foot-long 16-inch-diameter pipeline section to connect the new proposed REX-German Ridge Interconnect to the Rockies Express Pipeline in Monroe County, OH. E:\FR\FM\31JYN1.SGM 31JYN1 Federal Register / Vol. 79, No. 147 / Thursday, July 31, 2014 / Notices The general location of the Project facilities is shown in appendix 1.1 Land Requirements for Construction Construction of the proposed facilities at the Burch Ridge Station would occur within the confines of the existing station and disturb 8.47 acres of land. Following construction, DTI would maintain 3.18 acres for permanent operation of the Project’s facilities; the remaining acreage would be restored and revert to former uses. Construction of the proposed aboveground and pipeline facilities at the existing Mullett Station as well as the two new metering and regulation facilities in Monroe County, OH would disturb 29.69 acres of land. Following construction, DTI would maintain 8.97 acres for permanent operation of the Project’s facilities; the remaining acreage would be restored and revert to former uses. The EA Process wreier-aviles on DSK5TPTVN1PROD with NOTICES The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from an action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. NEPA also requires us 2 to discover and address concerns the public may have about proposals. This process is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this notice, the Commission requests public comments on the scope of the issues to address in the EA. We will consider all filed comments during the preparation of the EA. In the EA we will discuss impacts that could occur as a result of the construction and operation of the proposed Project under these general headings: • geology and soils; • land use; • water resources, fisheries, and wetlands; • cultural resources; • vegetation and wildlife; • air quality and noise; • endangered and threatened species; and • public safety; and 1 The appendices referenced in this notice will not appear in the Federal Register. Copies of appendices were sent to all those receiving this notice in the mail and are available at www.ferc.gov using the link called ‘‘eLibrary’’ or from the Commission’s Public Reference Room, 888 First Street NE., Washington, DC 20426, or call (202) 502–8371. For instructions on connecting to eLibrary, refer to the last page of this notice. 2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the environmental staff of the Commission’s Office of Energy Projects. VerDate Mar<15>2010 14:56 Jul 30, 2014 Jkt 232001 • cumulative impacts. We will also evaluate reasonable alternatives to the proposed Project or portions of the Project, and make recommendations on how to lessen or avoid impacts on the various resource areas. The EA will present our independent analysis of the issues. The EA will be available in the public record through eLibrary. Depending on the comments received during the scoping process, we may also publish and distribute the EA to the public for an allotted comment period. We will consider all comments on the EA before making our recommendations to the Commission. To ensure we have the opportunity to consider and address your comments, please carefully follow the instructions in the Public Participation section below. With this notice, we are asking agencies with jurisdiction by law and/ or special expertise with respect to the environmental issues of this Project to formally cooperate with us in the preparation of the EA.3 Agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this notice. Consultations Under Section 106 of the National Historic Preservation Act In accordance with the Advisory Council on Historic Preservation’s implementing regulations for section 106 of the National Historic Preservation Act, we are using this notice to initiate consultation with the applicable State Historic Preservation Offices (SHPO), and to solicit their views and those of other government agencies, interested Indian tribes, and the public on the Project’s potential effects on historic properties.4 We will define the Project-specific Area of Potential Effects (APE) in consultation with the SHPOs as the Project develops. On natural gas facility projects, the APE at a minimum encompasses all areas subject to ground disturbance (examples include construction right-of-way, contractor/pipe storage yards, compressor stations, and access roads). Our EA for this project will document our findings on the impacts on historic 3 The Council on Environmental Quality regulations addressing cooperating agency responsibilities are at Title 40, Code of Federal Regulations, Part 1501.6. 4 The Advisory Council on Historic Preservation’s regulations are at Title 36, Code of Federal Regulations, Part 800. Those regulations define historic properties as any prehistoric or historic district, site, building, structure, or object included in or eligible for inclusion in the National Register of Historic Places. PO 00000 Frm 00067 Fmt 4703 Sfmt 4703 44449 properties and summarize the status of consultations under section 106. Public Participation You can make a difference by providing us with your specific comments or concerns about the project. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that your comments are timely and properly recorded, please send your comments so that the Commission receives them in Washington, DC on or before August 23, 2014. For your convenience, there are three methods which you can use to submit your comments to the Commission. In all instances please reference the project docket number (CP14–496–000) with your submission. The Commission encourages electronic filing of comments and has expert staff available to assist you at (202) 502–8258 or efiling@ferc.gov. (1) You can file your comments electronically using the eComment feature on the Commission’s Web site (www.ferc.gov) under the link to Documents and Filings. This is an easy method for interested persons to submit brief, text-only comments on a project; (2) You can file your comments electronically using the eFiling feature on the Commission’s Web site (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You must select the type of filing you are making. If you are filing a comment on a particular project, please select ‘‘Comment on a Filing’’; or (3) You can file a paper copy of your comments by mailing them to the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC 20426. Environmental Mailing List The environmental mailing list includes: Federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission’s regulations) who are potential right-of-way grantors, whose property may be used temporarily for E:\FR\FM\31JYN1.SGM 31JYN1 44450 Federal Register / Vol. 79, No. 147 / Thursday, July 31, 2014 / Notices project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project. We will update the environmental mailing list as the analysis proceeds to ensure that we send the information related to this environmental review to all individuals, organizations, and government entities interested in and/or potentially affected by the proposed project. If we publish and distribute the EA, copies will be sent to the environmental mailing list for public review and comment. If you would prefer to receive a paper copy of the document instead of the CD version or would like to remove your name from the mailing list, please return the attached Information Request (appendix 2). wreier-aviles on DSK5TPTVN1PROD with NOTICES Becoming an Intervenor In addition to involvement in the EA scoping process, you may want to become an ‘‘intervenor’’ which is an official party to the Commission’s proceeding. Intervenors play a more formal role in the process and are able to file briefs, appear at hearings, and be heard by the courts if they choose to appeal the Commission’s final ruling. An intervenor formally participates in the proceeding by filing a request to intervene. Instructions for becoming an intervenor are in the User’s Guide under the ‘‘e-filing’’ link on the Commission’s Web site. Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC Web site at www.ferc.gov using the ‘‘eLibrary’’ link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number, excluding the last three digits in the Docket Number field (i.e., CP14–496). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission now offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/ docs-filing/esubscription.asp. VerDate Mar<15>2010 14:56 Jul 30, 2014 Jkt 232001 Finally, public meetings or site visits will be posted on the Commission’s calendar located at www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. Dated: July 24, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–18006 Filed 7–30–14; 8:45 am] BILLING CODE 6717–01–P docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on August 13, 2014. Dated: July 23, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–18009 Filed 7–30–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission DEPARTMENT OF ENERGY [Docket No. RM13–7–001] Federal Energy Regulatory Commission Protection System Maintenance Reliability Standard: Notice of Filing [Project No. 14286–001] Take notice that on June 4, 2014, the North American Electric Reliability Corporation filed a proposed revision to a Violation Severity Level assigned to Requirement R1 in Protection System Maintenance Reliability Standard PRC– 005–2, pursuant to Order No. 793.1 Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed Haiwee Ridge Pumped Storage Project; Notice of Application for Amendment of Preliminary Permit Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests 1 Protection System Maintenance Reliability Standard, Order No. 793, 145 FERC ¶ 61,253 (2013). PO 00000 Frm 00068 Fmt 4703 Sfmt 4703 On July 2, 2014, Gridflex Energy, LLC on behalf of Haiwee Ridge Hydro, LLC (permitee), filed an amendment to its preliminary permit issued on March 23, 2012,1 for the proposed Haiwee Ridge Pumped Storage Project No. 14286 (project) to be located on the South Haiwee reservoir, near the Town of Olancha, Inyo County, California.2 The project would be located almost entirely on land managed by the Bureau of Land Management (BLM). The preliminary permit issued on March 23, 2012, was issued to the permittee to maintain priority of application for a license during the term of the permit while the permittee conducts investigations and secures data necessary to determine the feasibility of the proposed project and the alternatives it considers. Each of following alternatives considered would consist of a project with a total installed capacity of 500 megawatts (MW): South Haiwee Alternative A: (1) An upper reservoir formed by a 160-foothigh by 2,270-foot-long, rollercompacted concrete (RCC) dam, two saddle dams (a 35-foot-high by 680-footlong RCC dam and a 65-foot-high by 680-foot-long RCC dam) having a total storage capacity of 15,100 acre-feet and a water surface area of 175 acres at full pool elevation of 5,050 feet msl; (2) a lower reservoir formed by the 81-foot1 138 FERC ¶ 62,298. July 15, 2014, Gridflex Energy, LLC, on behalf of Haiwee Ridge Hydro, LLC, filed a correction to the July 2, 2014 application to amend the preliminary permit for the Haiwee Ridge Pumped Storage Project. 2 On E:\FR\FM\31JYN1.SGM 31JYN1

Agencies

[Federal Register Volume 79, Number 147 (Thursday, July 31, 2014)]
[Notices]
[Pages 44448-44450]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-18006]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP14-496-000]


Dominion Transmission, Inc.: Notice of Intent To Prepare an 
Environmental Assessment for the Proposed Clarington Project and 
Request for Comments on Environmental Issues

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the Clarington Project (Project) 
involving construction and operation of facilities by Dominion 
Transmission, Inc. (DTI) in Marshall County, West Virginia and Monroe 
County, Ohio. The Commission will use this EA in its decision-making 
process to determine whether the project is in the public convenience 
and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the Project. Your input will help the Commission staff 
determine what issues they need to evaluate in the EA. Please note that 
the scoping period will close on August 23, 2014.
    You may submit comments in written form or verbally. Further 
details on how to submit written comments are in the Public 
Participation section of this notice.
    This notice is being sent to the Commission's current environmental 
mailing list for this Project. State and local government 
representatives should notify their constituents of this proposed 
Project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the proposed facilities. The company 
would seek to negotiate a mutually acceptable agreement. However, if 
the Commission approves the Project, that approval conveys with it the 
right of eminent domain. Therefore, if easement negotiations fail to 
produce an agreement, the pipeline company could initiate condemnation 
proceedings where compensation would be determined in accordance with 
state law.
    DTI provided landowners with a fact sheet prepared by the FERC 
entitled ``An Interstate Natural Gas Facility On My Land? What Do I 
Need To Know?'' This fact sheet addresses a number of typically-asked 
questions, including the use of eminent domain and how to participate 
in the Commission's proceedings. It is also available for viewing on 
the FERC Web site (www.ferc.gov).

Summary of the Proposed Project

    DTI proposes to construct, install, own, operate and maintain 
certain compression facilities located in Marshall County, West 
Virginia and Monroe County, Ohio. The Project would provide 250,000 
dekatherms per day of firm transportation service for CNX Gas Company, 
LLC at a proposed new interconnect known as the TET-Arman Hill 
Interconnect and at a proposed new interconnect known as the REX-German 
Ridge Interconnect, both of which are located in Monroe County, OH. 
According to DTI, its Project would create increased access for 
production in this region to major natural gas markets of the Northeast 
and Mid-Atlantic regions of the United States.
    The Clarington Project would consist of the following facilities:
     A new 6,130 horsepower (hp) gas turbine/compressor package 
and auxiliary equipment at DTI's existing Burch Ridge Station in 
Marshall County, WV;
     Two new 5,000 hp reciprocating compression units and 
auxiliary equipment at DTI's existing Mullett Station in Monroe County, 
OH;
     2,612 feet of new 20-inch-diameter suction piping and 
2,756 feet of new 16-inch-diameter discharge piping which would connect 
the Mullett Compressor Station to two proposed new interconnects;
     Two new metering and regulation facilities in Monroe 
County, OH: The TET-Arman Hill Interconnect and the REX-German Ridge 
Interconnect; and
     A 987-foot-long 16-inch-diameter pipeline section to 
connect the new proposed REX-German Ridge Interconnect to the Rockies 
Express Pipeline in Monroe County, OH.

[[Page 44449]]

    The general location of the Project facilities is shown in appendix 
1.\1\
---------------------------------------------------------------------------

    \1\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of appendices were sent to all those 
receiving this notice in the mail and are available at www.ferc.gov 
using the link called ``eLibrary'' or from the Commission's Public 
Reference Room, 888 First Street NE., Washington, DC 20426, or call 
(202) 502-8371. For instructions on connecting to eLibrary, refer to 
the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the proposed facilities at the Burch Ridge Station 
would occur within the confines of the existing station and disturb 
8.47 acres of land. Following construction, DTI would maintain 3.18 
acres for permanent operation of the Project's facilities; the 
remaining acreage would be restored and revert to former uses. 
Construction of the proposed aboveground and pipeline facilities at the 
existing Mullett Station as well as the two new metering and regulation 
facilities in Monroe County, OH would disturb 29.69 acres of land. 
Following construction, DTI would maintain 8.97 acres for permanent 
operation of the Project's facilities; the remaining acreage would be 
restored and revert to former uses.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
\2\ to discover and address concerns the public may have about 
proposals. This process is referred to as ``scoping.'' The main goal of 
the scoping process is to focus the analysis in the EA on the important 
environmental issues. By this notice, the Commission requests public 
comments on the scope of the issues to address in the EA. We will 
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------

    \2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff 
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA we will discuss impacts that could occur as a result of 
the construction and operation of the proposed Project under these 
general headings:
     geology and soils;
     land use;
     water resources, fisheries, and wetlands;
     cultural resources;
     vegetation and wildlife;
     air quality and noise;
     endangered and threatened species; and
     public safety; and
     cumulative impacts.
    We will also evaluate reasonable alternatives to the proposed 
Project or portions of the Project, and make recommendations on how to 
lessen or avoid impacts on the various resource areas.
    The EA will present our independent analysis of the issues. The EA 
will be available in the public record through eLibrary. Depending on 
the comments received during the scoping process, we may also publish 
and distribute the EA to the public for an allotted comment period. We 
will consider all comments on the EA before making our recommendations 
to the Commission. To ensure we have the opportunity to consider and 
address your comments, please carefully follow the instructions in the 
Public Participation section below.
    With this notice, we are asking agencies with jurisdiction by law 
and/or special expertise with respect to the environmental issues of 
this Project to formally cooperate with us in the preparation of the 
EA.\3\ Agencies that would like to request cooperating agency status 
should follow the instructions for filing comments provided under the 
Public Participation section of this notice.
---------------------------------------------------------------------------

    \3\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

Consultations Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, we are using this notice to initiate consultation 
with the applicable State Historic Preservation Offices (SHPO), and to 
solicit their views and those of other government agencies, interested 
Indian tribes, and the public on the Project's potential effects on 
historic properties.\4\ We will define the Project-specific Area of 
Potential Effects (APE) in consultation with the SHPOs as the Project 
develops. On natural gas facility projects, the APE at a minimum 
encompasses all areas subject to ground disturbance (examples include 
construction right-of-way, contractor/pipe storage yards, compressor 
stations, and access roads). Our EA for this project will document our 
findings on the impacts on historic properties and summarize the status 
of consultations under section 106.
---------------------------------------------------------------------------

    \4\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Public Participation

    You can make a difference by providing us with your specific 
comments or concerns about the project. Your comments should focus on 
the potential environmental effects, reasonable alternatives, and 
measures to avoid or lessen environmental impacts. The more specific 
your comments, the more useful they will be. To ensure that your 
comments are timely and properly recorded, please send your comments so 
that the Commission receives them in Washington, DC on or before August 
23, 2014.
    For your convenience, there are three methods which you can use to 
submit your comments to the Commission. In all instances please 
reference the project docket number (CP14-496-000) with your 
submission. The Commission encourages electronic filing of comments and 
has expert staff available to assist you at (202) 502-8258 or 
efiling@ferc.gov.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for interested persons to 
submit brief, text-only comments on a project;
    (2) You can file your comments electronically using the eFiling 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
``eRegister.'' You must select the type of filing you are making. If 
you are filing a comment on a particular project, please select 
``Comment on a Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC 
20426.

Environmental Mailing List

    The environmental mailing list includes: Federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for

[[Page 44450]]

project purposes, or who own homes within certain distances of 
aboveground facilities, and anyone who submits comments on the project. 
We will update the environmental mailing list as the analysis proceeds 
to ensure that we send the information related to this environmental 
review to all individuals, organizations, and government entities 
interested in and/or potentially affected by the proposed project. If 
we publish and distribute the EA, copies will be sent to the 
environmental mailing list for public review and comment. If you would 
prefer to receive a paper copy of the document instead of the CD 
version or would like to remove your name from the mailing list, please 
return the attached Information Request (appendix 2).

Becoming an Intervenor

    In addition to involvement in the EA scoping process, you may want 
to become an ``intervenor'' which is an official party to the 
Commission's proceeding. Intervenors play a more formal role in the 
process and are able to file briefs, appear at hearings, and be heard 
by the courts if they choose to appeal the Commission's final ruling. 
An intervenor formally participates in the proceeding by filing a 
request to intervene. Instructions for becoming an intervenor are in 
the User's Guide under the ``e-filing'' link on the Commission's Web 
site.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site at www.ferc.gov using the ``eLibrary'' link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number, 
excluding the last three digits in the Docket Number field (i.e., CP14-
496). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission now offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
    Finally, public meetings or site visits will be posted on the 
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

    Dated: July 24, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-18006 Filed 7-30-14; 8:45 am]
BILLING CODE 6717-01-P