Drawbridge Operation Regulation; Tennessee River, Decatur, AL, 43939-43940 [2014-17841]

Download as PDF Federal Register / Vol. 79, No. 145 / Tuesday, July 29, 2014 / Rules and Regulations notification for bridge openings between 11 p.m. and 7 a.m. daily. Waterway usage on the Lake Washington Ship Canal ranges from commercial tug and barge to small pleasure craft. Vessels able to pass through the bridge in the closed positions may do so at anytime. The bridge will not be able to open for emergencies and there is no immediate alternate route for vessels to pass. The Coast Guard will also inform the users of the waterways through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so that vessels can arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: July 10, 2014. Steven M. Fischer, Bridge Administrator, Thirteenth Coast Guard District. [FR Doc. 2014–17856 Filed 7–28–14; 8:45 am] BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2014–0053] RIN 1625–AA09 Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, West Palm Beach, FL Notice of deviation from drawbridge regulation. ACTION: The Coast Guard has issued a temporary deviation from the operating schedule that governs the Royal Park and Southern Boulevard Bridges, Atlantic Intracoastal Waterway, mile 1022.6 and mile 1024.7, West Palm Beach, FL. These temporary operating schedules have been implemented in an effort to assist with the flow of vehicular traffic due to the Flagler Memorial Bridge being left in the open to navigation position. DATES: This deviation is effective without actual notice from July 29, 2014 through 8 a.m. on October 31, 2014. For the purposes of enforcement, actual notice will be used from 6 a.m. on May 16, 2014, until July 29, 2014. ADDRESSES: The docket for this deviation, [USCG–2014–0053] is available at https://www.regulations.gov. rmajette on DSK2TPTVN1PROD with RULES2 SUMMARY: VerDate Mar<15>2010 14:29 Jul 28, 2014 Jkt 232001 Type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH.’’ Click on Open Docket Folder on the line associated with this deviation. You may also visit the Docket Management Facility in Room W12–140 on the ground floor of the Department of Transportation West Building, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. If you have questions about this temporary deviation, call or email Mr. Michael Lieberum, Chief Operations Section, Seventh Coast Guard District, Bridge Branch; telephone 305–415–6744, email michael.b.lieberum@uscg.mil. If you have questions about viewing the docket, call Cheryl Collins, Program Manager, Docket Operations, telephone 202–366–9826. FOR FURTHER INFORMATION CONTACT: Due to safety concerns with the operation of the Flagler Memorial Bridge over the Atlantic Intracoastal Waterway, mile 1021.8, West Palm Beach, FL, the FDOT has requested permission to place the Flagler Memorial Bridge in the open to navigation position which will redirect all vehicular traffic to the Royal Park and Southern Boulevard Bridges. The City of Palm Beach has requested that the operating schedule of the Royal Park Bridge be modified from the schedule published in 33 CFR 117.261(v) which required this bridge to open on the hour and half-hour. The vertical clearance of the Royal Park Bridge is 21 feet at mean high water at low steel. The temporary bridge schedule is as follows: Monday through Friday, from 6:16 a.m. until 8:14 p.m., the Royal Park Bridge will open on an hourly schedule at the quarter-hour, except from 7:16 a.m. to 9:14 a.m. and from 4:16 p.m. to 6:14 p.m. this bridge will remain closed to navigation. At all other times, including Federal Holidays, this bridge will open on the quarter-hour and three-quarter hour. The City has also requested that the Southern Boulevard Bridge be modified from the schedule published in 33 CFR 117.261(w) which required this bridge to open on the quarter hour and three quarter hour. The vertical clearance of the Southern Boulevard Bridge is 14 feet at mean high water at low steel. The temporary bridge schedule is as follows: Monday through Friday, from 7:31 a.m. to 9:29 a.m. and from 4:01 p.m. to 5:59 p.m., this bridge will remain closed to navigation. At all other times, including Federal Holidays, this bridge will open on the top and bottom of the hour. This temporary SUPPLEMENTARY INFORMATION: PO 00000 Frm 00021 Fmt 4700 Sfmt 4700 43939 modification to the regulations will remain in effect until October 31, 2014. The Coast Guard will inform waterway users of the change in operating schedule for this bridge through the Local Notice to Mariners. Mariners are advised to use this information in order to arrange safe transit through these bridges to minimize any delay caused by this temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately following the end of the effective period of this temporary deviation. This deviation from the normal operating regulations is authorized under 33 CFR 117.35. Dated: May 16, 2014. Barry Dragon, Director, Bridge Administration, Seventh Coast Guard District. [FR Doc. 2014–17854 Filed 7–28–14; 8:45 am] BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2014–0622] Drawbridge Operation Regulation; Tennessee River, Decatur, AL Coast Guard, DHS. Notice of deviation from drawbridge regulations. AGENCY: ACTION: The Coast Guard has issued a temporary deviation from the operating schedule that governs the Southern Railroad Drawbridge across the Tennessee River, mile 304.4, at Decatur, Alabama. The deviation is necessary to allow the bridge owner time to replace and adjust the down haul operating ropes that are essential to the continued safe operation of the drawbridge. This deviation allows the bridge to remain in the closed-to-navigation position and not open to vessel traffic. DATES: This deviation is effective from 8 a.m., August 12, 2014 to 10 p.m., August 14, 2014. ADDRESSES: The docket for this deviation, (USCG–2014–0622) is available at https://www.regulations.gov. Type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH.’’ Click on Open Docket Folder on the line associated with this deviation. You may also visit the Docket Management Facility in Room W12–140 on the ground floor of the Department of SUMMARY: E:\FR\FM\29JYR1.SGM 29JYR1 43940 Federal Register / Vol. 79, No. 145 / Tuesday, July 29, 2014 / Rules and Regulations Transportation West Building, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal Holidays. If you have questions on this temporary deviation, call or email Eric A. Washburn, Bridge Administrator, Western Rivers, Coast Guard; telephone 314–269–2378, email Eric.Washburn@uscg.mil. If you have questions on viewing the docket, call Cheryl F. Collins, Program Manager, Docket Operations, telephone 202–366– 9826. FOR FURTHER INFORMATION CONTACT: The Norfolk Southern Railroad requested a temporary deviation for the Southern Railroad Drawbridge, across the Tennessee River, mile 304.4, at Decatur, Alabama to remain in the closed-tonavigation position on two days for 14 hours each day from 8 a.m. to 10 p.m. on August 12, 2014 and August 14, 2014 in order to replace and adjust the down haul operation ropes. The Southern Railroad Drawbridge currently operates in accordance with 33 CFR 117.5, which states the general requirement that drawbridge shall open promptly and fully for the passage of vessels when a request to open is given in accordance with the subpart. There are no alternate routes for vessels transiting this section of the Tennessee River. The Southern Railroad Drawbridge, in the closed-to-navigation position, provides a vertical clearance of 10.52 feet above normal pool. Navigation on the waterway consists primarily of commercial tows and recreational watercraft and will not be significantly impacted. This temporary deviation has been coordinated with waterway users. No objections were received. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. rmajette on DSK2TPTVN1PROD with RULES2 SUPPLEMENTARY INFORMATION: Dated: July 16, 2014. Eric A. Washburn, Bridge Administrator, Western Rivers. [FR Doc. 2014–17841 Filed 7–28–14; 8:45 am] BILLING CODE 9110–04–P VerDate Mar<15>2010 14:29 Jul 28, 2014 Jkt 232001 DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG–2011–0451] Safety Zone, Seafair Air Show Performance, Seattle, WA Coast Guard, DHS. Notice of enforcement of regulation. AGENCY: ACTION: The Coast Guard will enforce the annual Seafair Air Show safety zone on Lake Washington, Seattle, WA from 8 a.m. on August 1, 2014 to 4 p.m. on August 3, 2014. This action is necessary to ensure the safety of the public from inherent dangers associated with these annual aerial displays. During the enforcement period, no person or vessel may enter or transit this safety zone unless authorized by the Captain of the Port or his designated representative. DATES: The regulations in 33 CFR 165.1319 will be enforced from 8 a.m. on August 1, 2014 through 4 p.m. on August 3, 2014. FOR FURTHER INFORMATION CONTACT: If you have questions on this notice, call or email LTJG Johnny Zeng, Sector Puget Sound Waterways Management Division, Coast Guard; telephone (206) 217–6323, email SectorPugetSoundWWM@uscg.mil. SUMMARY: The Coast Guard will enforce the Seafair Air Show Performance safety zone in 33 CFR 165.1319 daily from 8 a.m. until 4 p.m. from August 1, 2014 through August 3, 2014 unless canceled sooner by the Captain of the Port. Under the provisions of 33 CFR 165.1319, the following area is designated as a safety zone: All waters of Lake Washington, Washington State, enclosed by the following points: Near the termination of Roanoke Way 47°35′44″ N, 122°14′47″ W; thence to 47°35′48″ N, 122°15′45″ W; thence to 47°36′02.1″ N, 122°15′’0.2″ W; thence to 47°35′56.6″ N, 122°16′29.2″ W; thence to 47°35′42″ N, 122°16′24″ W; thence to the east side of the entrance to the west high-rise of the Interstate 90 bridge; thence westerly along the south side of the bridge to the shoreline on the western terminus of the bridge; thence southerly along the shoreline to Andrews Bay at 47°33′06″ N, 122°15′32″ W; thence northeast along the shoreline of Bailey Peninsula to its northeast point at 47°33′44″ N, 122°15′04″ W; thence easterly along the east-west line drawn tangent to Bailey Peninsula; SUPPLEMENTARY INFORMATION: PO 00000 Frm 00022 Fmt 4700 Sfmt 4700 thence northerly along the shore of Mercer Island to the point of origin. In accordance with the general regulations in 33 CFR part 165, subpart C, no person or vessel may enter or remain in the zone except for support vessels and support personnel, vessels registered with the event organizer, or other vessels authorized by the Captain of the Port or his designated representatives. Vessels and persons granted authorization to enter the safety zone shall obey all lawful orders or directions made by the Captain of the Port or his designated representative. This document is issued under authority of 33 CFR 165.1319 and 5 U.S.C. 552(a). In addition to this notice in the Federal Register, the Coast Guard will provide the maritime community with advance notification of the safety zone via the Local Notice to Mariners and marine information broadcasts on the day of the event. If the COTP determines that the safety zone need not be enforced for the full duration stated in this notice, he may use a Broadcast Notice to Mariners to grant general permission to enter the regulated area. Dated: July 16, 2014. M.W. Raymond, Captain, U.S. Coast Guard, Captain of the Port, Puget Sound. [FR Doc. 2014–17851 Filed 7–28–14; 8:45 am] BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket Number USCG–2014–0201] RIN 1625–AA00 Safety Zone, Patapsco River; Baltimore, MD Coast Guard, DHS. Temporary final rule. AGENCY: ACTION: The Coast Guard is establishing a safety zone encompassing certain waters of the Patapsco River. This safety zone is necessary to protect the public and vessels on navigable waters during a fireworks display launched from a barge located adjacent to the East Channel of Northwest Harbor at Baltimore, MD on August 5, 2014. DATES: This rule is effective and will be enforced from 8:30 p.m. to 10:30 p.m. on August 5, 2014. ADDRESSES: Documents mentioned in this preamble are part of docket [USCG– 2014–0201]. To view documents mentioned in this preamble as being SUMMARY: E:\FR\FM\29JYR1.SGM 29JYR1

Agencies

[Federal Register Volume 79, Number 145 (Tuesday, July 29, 2014)]
[Rules and Regulations]
[Pages 43939-43940]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-17841]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2014-0622]


Drawbridge Operation Regulation; Tennessee River, Decatur, AL

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulations.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the Southern Railroad Drawbridge across 
the Tennessee River, mile 304.4, at Decatur, Alabama. The deviation is 
necessary to allow the bridge owner time to replace and adjust the down 
haul operating ropes that are essential to the continued safe operation 
of the drawbridge. This deviation allows the bridge to remain in the 
closed-to-navigation position and not open to vessel traffic.

DATES: This deviation is effective from 8 a.m., August 12, 2014 to 10 
p.m., August 14, 2014.

ADDRESSES: The docket for this deviation, (USCG-2014-0622) is available 
at https://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH.'' Click on Open Docket Folder on the line 
associated with this deviation. You may also visit the Docket 
Management Facility in Room W12-140 on the ground floor of the 
Department of

[[Page 43940]]

Transportation West Building, 1200 New Jersey Avenue SE., Washington, 
DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except 
Federal Holidays.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Eric A. Washburn, Bridge 
Administrator, Western Rivers, Coast Guard; telephone 314-269-2378, 
email Eric.Washburn@uscg.mil. If you have questions on viewing the 
docket, call Cheryl F. Collins, Program Manager, Docket Operations, 
telephone 202-366-9826.

SUPPLEMENTARY INFORMATION: The Norfolk Southern Railroad requested a 
temporary deviation for the Southern Railroad Drawbridge, across the 
Tennessee River, mile 304.4, at Decatur, Alabama to remain in the 
closed-to-navigation position on two days for 14 hours each day from 8 
a.m. to 10 p.m. on August 12, 2014 and August 14, 2014 in order to 
replace and adjust the down haul operation ropes.
    The Southern Railroad Drawbridge currently operates in accordance 
with 33 CFR 117.5, which states the general requirement that drawbridge 
shall open promptly and fully for the passage of vessels when a request 
to open is given in accordance with the subpart.
    There are no alternate routes for vessels transiting this section 
of the Tennessee River.
    The Southern Railroad Drawbridge, in the closed-to-navigation 
position, provides a vertical clearance of 10.52 feet above normal 
pool. Navigation on the waterway consists primarily of commercial tows 
and recreational watercraft and will not be significantly impacted. 
This temporary deviation has been coordinated with waterway users. No 
objections were received.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: July 16, 2014.
Eric A. Washburn,
Bridge Administrator, Western Rivers.
[FR Doc. 2014-17841 Filed 7-28-14; 8:45 am]
BILLING CODE 9110-04-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.