Commission Information Collection Activities (FERC-725E, FERC-583, FERC-512, and FERC-588); Comment Request, 42304-42307 [2014-17044]

Download as PDF 42304 Federal Register / Vol. 79, No. 139 / Monday, July 21, 2014 / Notices DEPARTMENT OF ENERGY Quadrennial Energy Review: Notice of Public Meeting Office of Energy Policy and Systems Analysis, Secretariat, Quadrennial Energy Review Task Force, Department of Energy. ACTION: Notice of public meeting: Correction. AGENCY: The Department of Energy published in the Federal Register on July 1, 2014, a notice of a public meeting to discuss and receive comments on issues related to the Quadrennial Energy Review. The notice is being corrected to change the time of the meeting. SUMMARY: Correction In the Federal Register of July 1, 2014, in FR DOC. 2014–15388, on page 37302, please make the following correction: In the DATES heading, first column, third line, remove 9:00 a.m. and in its place add 10:00 a.m. Issued in Washington, DC, on July 15 2014. Michele Torrusio, QER Secretariat, QER Interagency Task Force, U.S. Department of Energy. [FR Doc. 2014–17054 Filed 7–18–14; 8:45 am] BILLING CODE 6450–01–P Administration, Department of Energy. Telephone: 202–586–8623 or email: Katie.Strangis@nnsa.doe.gov. SUPPLEMENTARY INFORMATION: This subsequent arrangement concerns the retransfer of 295,858 kg of U.S.-origin natural uranium hexafluoride (UF6) (67.6% U), 200,000 kg of which is uranium, from Cameco Corporation (Cameco) in Saskatoon, Saskatchewan, to Urenco Ltd. (URENCO) in Capenhurst, United Kingdom. The material, which is currently located at Cameco in Port Hope, Ontario, will be used for toll enrichment by URENCO at its facility in Capenhurst, United Kingdom. The material was originally obtained by Cameco from Power Resources, Inc., Cameco ResourcesCrowe Butte Operation, and White Mesa Mill pursuant to export license XSOU8798. In accordance with section 131a. of the Atomic Energy Act of 1954, as amended, it has been determined that this subsequent arrangement concerning the retransfer of nuclear material of United States origin will not be inimical to the common defense and security of the United States of America. Dated: June 23, 2014. For the Department of Energy. Anne M. Harrington, Deputy Administrator, Defense Nuclear Nonproliferation. [FR Doc. 2014–16932 Filed 7–18–14; 8:45 am] DEPARTMENT OF ENERGY BILLING CODE 6450–01–P Proposed Subsequent Arrangement Office of Nonproliferation and International Security, Department of Energy. ACTION: Proposed subsequent arrangement. DEPARTMENT OF ENERGY This document is being issued under the authority of the Atomic Energy Act of 1954, as amended. The Department is providing notice of a proposed subsequent arrangement under the Agreement for Cooperation Concerning Civil Uses of Nuclear Energy Between the Government of the United States of America and the Government of Canada and the Agreement for Cooperation in the Peaceful Uses of Nuclear Energy Between the United States of America and the European Atomic Energy Community. Commission Information Collection Activities (FERC–725E, FERC–583, FERC–512, and FERC–588); Comment Request AGENCY: emcdonald on DSK67QTVN1PROD with NOTICES SUMMARY: This subsequent arrangement will take effect no sooner than August 5, 2014. FOR FURTHER INFORMATION CONTACT: Ms. Katie Strangis, Office of Nonproliferation and International Security, National Nuclear Security DATES: VerDate Mar<15>2010 17:14 Jul 18, 2014 Jkt 232001 Federal Energy Regulatory Commission [Docket No. IC14–10–000] Federal Energy Regulatory Commission. ACTION: Comment request. AGENCY: In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 USC 3507(a)(1)(D), the Federal Energy Regulatory Commission (Commission or FERC) is submitting its information collections FERC–725E (Mandatory Reliability Standards—WECC), FERC– 583 (Annual Kilowatt Generating Report), FERC–512 (Application for Preliminary Permit), FERC–588 (Emergency Natural Gas Transportation, Sale, and Exchange) to the Office of Management and Budget (OMB) for SUMMARY: PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 review of the information collection requirements. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below. The Commission previously issued a Notice in the Federal Register (79 FR 19888, 4/2/2014) requesting public comments. The Commission received no comments on the FERC–725E, FERC–583, FERC– 512, or FERC–588 and is making this notation in its submittal to OMB. DATES: Comments on the collection of information are due by August 20, 2014. ADDRESSES: Comments filed with OMB, identified by the OMB Control No. 1902–0073 (FERC–512), 1902–0136 (FERC–583), 1902–0144 (FERC–588), or 1902–0246 (FERC–725E) and should be sent via email to the Office of Information and Regulatory Affairs: oira_submission@omb.gov. Attention: Federal Energy Regulatory Commission Desk Officer. The Desk Officer may also be reached via telephone at 202–395– 4718. A copy of the comments should also be sent to the Commission, in Docket No. IC14–10–000, by either of the following methods: • eFiling at Commission’s Web site: https://www.ferc.gov/docs-filing/ efiling.asp. • Mail/Hand Delivery/Courier: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE., Washington, DC 20426. Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: https:// www.ferc.gov/help/submissionguide.asp. For user assistance contact FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208–3676 (toll-free), or (202) 502–8659 for TTY. Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at https://www.ferc.gov/docsfiling/docs-filing.asp. FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at DataClearance@FERC.gov, by telephone at (202) 502–8663, and by fax at (202) 273–0873. SUPPLEMENTARY INFORMATION: Type of Request: Three-year extension of the information collection requirements for all collections described below with no changes to the current reporting requirements. Please note that each collection is distinct from the next. Comments: Comments are invited on: (1) Whether the collections of E:\FR\FM\21JYN1.SGM 21JYN1 42305 Federal Register / Vol. 79, No. 139 / Monday, July 21, 2014 / Notices information are necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimates of the burden and cost of the collections of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collections; and (4) ways to minimize the burden of the collections of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. FERC–725E, Mandatory Reliability Standards for the Western Electric Coordinating Council OMB Control No.: 1902–0246. Abstract: The information collected by the FERC–725E (OMB Control No. 1902–0246) is required to implement the statutory provisions of section 215 of the Federal Power Act (FPA) (16 U.S.C. 824o). Section 215 of the FPA buttresses the Commission’s efforts to strengthen the reliability of the interstate grid through the grant of new authority by providing for a system of mandatory Reliability Standards developed by the Electric Reliability Organization. Reliability Standards that the ERO proposes to the Commission may include Reliability Standards that are proposed to the ERO by a Regional Entity.1 A Regional Entity is an entity that has been approved by the Commission to enforce Reliability Standards under delegated authority from the ERO.2 On June 8, 2008 in an adjudicatory order, the Commission approved eight regional Reliability Standards submitted by the ERO that were proposed by the Western Electricity Coordinating Council (WECC).3 WECC is responsible for coordinating and promoting electric system reliability. In addition to promoting a reliable electric power system in the Western Interconnection, WECC supports efficient competitive power markets, ensures open and nondiscriminatory transmission access among members, and provides a forum for resolving transmission access disputes plus the coordination of operating and planning activities of its members. There are eight Reliability Standards currently applicable in the WECC region. These standards generally require entities to document compliance with substantive requirements, retain documentation, and submit reports to WECC. • BAL–002–WECC–2 requires balancing authorities and reserve sharing groups to document compliance with the contingency reserve requirements described in the standard. • BAL–004–WECC–02 requires balancing authorities to document that time error corrections and primary inadvertent interchange payback were conducted according the requirements in the standard. • FAC–501–WECC–1 requires transmission owners with certain transmission paths to have a transmission maintenance and inspection plan and to document maintenance and inspection activities according to the plan. • IRO–006–WECC–1 requires balancing authorities and reliability coordinators document actions taken to mitigate unscheduled flow. • PRC–004–WECC–1 requires transmission owners, generator owners and transmission operators to document their analysis and/or mitigation due to certain misoperations on major transfer paths. This standard requires that documentation be kept for six years. • TOP–007–WECC–1 requires transmission operators to document that when actual flows on major transfer paths exceed system operating limits their schedules and actual flows are not exceeded for longer than a specified time. • VAR–002–WECC–1 requires generator operators and transmission operators to provide quarterly reports to the compliance monitor and have evidence related to their synchronous generators, synchronous condensers, and automatic voltage regulators. • VAR–501–WECC–1 requires generator operators to provide quarterly reports to the compliance monitor and have evidence regarding operation of their power system stabilizers. The information generated by these standards generally serves to ensure entities are complying with applicable Reliability Standards. Type of Respondents: Balancing authorities, reserve sharing groups, transmission owners, reliability coordinators, transmission operators, generator operators. Estimate of Annual Burden: The Commission estimates the annual public reporting burden for the information collection as: 4 FERC–725E, MANDATORY RELIABILITY STANDARDS FOR THE WESTERN ELECTRIC COORDINATING COUNCIL Number of respondents 5 Annual number of responses per respondent Average burden hours & cost per response 6 Total annual burden hours & total annual cost (1) FERC data collection (2) (3) (1)*(2)*(3) emcdonald on DSK67QTVN1PROD with NOTICES FERC–725E Reporting: Balancing Authorities ................................................................ Generator Operators ................................................................ Transmission Operators applicable to standard VAR–002 7 .... Transmission Operators that operate qualified transfer paths 8 Transmission Owners that operate qualified transfer paths 9 .. Reliability Coordinators ............................................................. 1 16 U.S.C. 824o(e)(4). U.S.C. 824o(a)(7) and (e)(4). 3 72 FR 33462, June 18, 2007. 4 The initial public notice did not include the dollar figures associated with the burden hours below. The burden hours have not been modified since the issuance of the initial public notice. 5 Number of respondents derived from the NERC Compliance Registry as of February 25, 2014. 2 16 VerDate Mar<15>2010 17:14 Jul 18, 2014 Jkt 232001 34 228 86 9 5 1 6 The total annual cost is derived from salary figures from the Bureau of Labor Statistics for three positions involved in the reporting and recordkeeping associated with this collection. These figures include salary (https://bls.gov/oes/current/ naics2_22.htm) and other associated benefits (https://www.bls.gov/news.release/ecec.nr0.htm): • Manager: $84.72/hour. • Engineer: $60.70/hour. • File Clerk: $28.93/hour. PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 1 1 4 3 3 1 21, $1,527 10, $727 10, $727 40, $2,908 40, $2,908 1, $73 714, $51,918 2,280, $165,756 3,440, $250,088 1,080, $78,516 600, $43,620 1, $73 This wage for the reporting requirements is an average of a manager and engineer wages ($72.71). The wage for recordkeeping requirements is based on the File Clerk position. 7 Based on estimates in Order 751, Docket No. RM09–9–000. 8 Based on burden estimates taken from the Order in Docket No. RR07–11–000 P. 130. 9 Id. E:\FR\FM\21JYN1.SGM 21JYN1 42306 Federal Register / Vol. 79, No. 139 / Monday, July 21, 2014 / Notices FERC–725E, MANDATORY RELIABILITY STANDARDS FOR THE WESTERN ELECTRIC COORDINATING COUNCIL—Continued Number of respondents 5 Annual number of responses per respondent Average burden hours & cost per response 6 Total annual burden hours & total annual cost (1) FERC data collection (2) (3) (1)*(2)*(3) Reserve Sharing Group ............................................................ 3 1 1, $73 3, $219 Total ................................................................................... ............................ ............................ ............................ 8,118, $590,190 ..................................................... Balancing Authorities ................................................ Balancing Authorities (IRO–006) 11 .......................... Generator Operators ................................................ Transmission Operator (VAR–002) .......................... Transmission Operator ............................................. Transmission Owner ................................................. Reliability Coordinator 12 ........................................... ............................ ............................ ............................ ............................ ............................ ............................ ............................ 71, $2,054 34, $984 228, $6,596 344, $9,952 108, $3,124 60, $1,736 34, $984 Total ................................................................... ................................................................................... ............................ 879, $25,430 Record-keeping 10 FERC–583, Annual Kilowatt Generating Report (Annual Charges) OMB Control No.: 1902–0136. Abstract: The FERC–583 is used by the Commission to implement the statutory provisions of section 10(e) of the Federal Power Act (FPA) (16 U.S.C. 803(e)), which requires the Commission to collect annual charges from hydropower licensees for, among other things, the cost of administering Part I of the FPA and for the use of United States dams. In addition, section 3401 of the Omnibus Budget Reconciliation Act of 1986 (OBRA) authorizes the Commission to ‘‘assess and collect fees and annual charges in any fiscal year in amounts equal to all of the costs incurred by the Commission in that fiscal year.’’ The information is collected annually and used to determine the amounts of the annual charges to be assessed licensees for reimbursable government administrative costs and for the use of government dams. The Commission implements these filing requirements in the Code of Federal Regulations (CFR) under 18 CFR Part 11. Type of Respondent: FERC-regulated private and public hydropower licensees. Estimate of Annual Burden: The Commission estimates the annual public reporting burden for the information collection as: FERC–583, ANNUAL KILOWATT GENERATING REPORT [Annual Charges] Number of respondents 13 Annual number of responses per respondent Total number of responses Average burden & cost per response 14 Total annual burden hours & total annual cost Cost per respondent ($) (1) (2) (1)*(2)=(3) (4) (3)*(4)=(5) (5)÷(1) 517 1 517 2, $141 1,034, $72,897 $141 emcdonald on DSK67QTVN1PROD with NOTICES FERC–512, Application for Preliminary Permit OMB Control No.: 1902–0073. Abstract: The Commission uses the information collected under the requirements of FERC–512 to implement the statutory provisions of sections 4(f), 5 and 7 of the Federal Power Act (FPA).15 The purpose of obtaining a preliminary permit is to maintain priority of the application for a license for a hydropower facility while the applicant conducts surveys to prepare maps, plans, specifications and estimates; conducts engineering, economic and environmental feasibility 10 Based on 10% total annual burden hours per response. 11 Based on record keeping hours for Balancing Authorities in Order 746 in Docket No. RM09–19– 000 implementing IRO–006–WECC–1. VerDate Mar<15>2010 17:51 Jul 18, 2014 Jkt 232001 studies; and making financial arrangements. The conditions under which the priority will be maintained are set forth in each permit. During the term of the permit, no other application for a preliminary permit or application for a license submitted by another party can be accepted. The term of the permit is three years. The information collected under the designation FERC–512 is in the form of a written application for a preliminary permit which is used by Commission staff to determine an applicant’s qualifications to hold a preliminary permit, review the proposed hydro development for feasibility and to issue a notice of the application in order to solicit public and agency comments. The Commission implements these mandatory filing requirements in the Code of Federal Regulations (CFR) under 18 CFR 4.31.33, 4.81-.83. Type of Respondents: Hydropower facilities. Estimate of Annual Burden: The Commission estimates the annual public reporting burden for the information collection as: 12 Based on record keeping hours in Order 746 in Docket No. RM09–19–000. 13 Based on data from Fiscal Year 2013, there were 517 projects, owned by 241 FERC-regulated private and public licensees. Many of the licensees owned multiple projects. 14 The estimates for cost per response are derived using the following formula: Average Burden Hours per Response * $70.50 per hour. 15 16 U.S.C. 797, 798, & 800. PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 E:\FR\FM\21JYN1.SGM 21JYN1 42307 Federal Register / Vol. 79, No. 139 / Monday, July 21, 2014 / Notices FERC–512: APPLICATION FOR PRELIMINARY PERMIT Number of respondents Annual number of responses per respondent Total number of responses Average burden/$ per response 16 Total annual burden hours (total annual cost) Cost per respondent ($) (1) (2) (1)*(2)=(3) (4) (3)*(4)=(5) (5)÷(1) 125 1 125 37,$2,608.50 4,625, $326,062.50 $2,608.50 FERC–588, Emergency Natural Gas Transportation, Sale, and Exchange Transportation OMB Control No.: 1902–0144. Abstract: The Commission uses the information collected under the requirements of FERC–588 to implement the statutory provisions of sections 7(c) of the Natural Gas Act (NGA) (P.L. 75–688) (15 USC 717–717w) and provisions of the Natural Gas Policy Act of 1978 (NGPA), 15 USC. 3301– 3432. Under the NGA, a natural gas company must obtain Commission approval to engage in the transportation, sale or exchange of natural gas in interstate commerce. However, section 7(c) exempts from certificate requirements ‘‘temporary acts or operations for which the issuance of a certificate will not be required in the public interest.’’ The NGPA also provides for non-certificated interstate transactions involving intrastate pipelines and local distribution companies. A temporary operation, or emergency, is defined as any situation in which an actual or expected shortage of gas supply would require an interstate pipeline company, intrastate pipeline, local distribution company, or Hinshaw pipeline to curtail deliveries of gas or provide less than the projected level of service to the customer. The natural gas companies which provide the temporary assistance to the companies which are having the ‘‘emergency’’ must file the necessary information described in Part 284, Subpart I of the Commission’s Regulations with the Commission so that it may determine if their assisting transaction/operation qualifies for exemption. The assisting company may or may not be under the Commission’s jurisdiction and if their assisting actions qualify for the exemption, they will not become subject to the Commission’s jurisdiction for such actions. A report within forty-eight hours of the commencement of the transportation, sale or exchange, a request to extend the sixty-day term of the emergency transportation, if needed, and a termination report are required. The data required to be filed for the forty-eight hour report is specified by 18 CFR 284.270. Type of Respondents: Natural Gas Pipelines. Estimate of Annual Burden: The Commission estimates the annual public reporting burden for the information collection as: FERC–588: EMERGENCY NATURAL GAS TRANSPORTATION, SALE, AND EXCHANGE TRANSPORTATION Number of respondents Annual number of responses per respondent Total number of responses Average burden/$ per response 17 Total annual burden hours (total annual cost) Cost per respondent ($) (1) (2) (1)*(2)=(3) (4) (3)*(4)=(5) (5)÷(1) 8 1 8 10, $705 80, $5,640 $705 Dated: July 11, 2014. Kimberly D. Bose, Secretary. Take notice that on June 27, 2014, Paiute Pipeline Company (Paiute), P.O. Box 94197, Las Vegas, Nevada 89193– 4197, filed an application in Docket No. CP14–509–000, pursuant to section 7(c) of the Natural Gas Act (NGA), and Part 157 of the Commission’s regulations, for authority to construct, and operate certain pipeline and associated facilities for its 2015 Elko Area Expansion Project (Project) located in Elko County, Nevada. The Project will consist of construction of approximately 35.2 miles of 8-inch diameter pipeline extending from a new interconnect with Ruby Pipeline, L.L.C. to Paiute’s existing Elko Lateral near the Elko Nevada City Gate, all as more fully set forth in the application, which is on file with the Commission and open to public inspection. This filing may also be viewed on the Web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at 16 The estimates for cost per response are derived using the following formula: Average Burden Hours per Response * $70.50 per hour. 17 The estimates for cost per response are derived using the following formula: Average Burden Hours per Response * $70.50 per hour. [FR Doc. 2014–17044 Filed 7–18–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. CP14–509–000; PF14–4–000] emcdonald on DSK67QTVN1PROD with NOTICES Paiute Pipeline Company; Notice of Application VerDate Mar<15>2010 17:14 Jul 18, 2014 Jkt 232001 PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions regarding this application should be directed to Mark A. Litwin, Vice President/General Manager, Paiute Pipeline Company, P.O. Box 94197, Las Vegas, Nevada 89193– 4197 or by calling 702–364–3195. On October 31, 2013, Commission staff granted Paiute’s request to use the pre-filing process and assigned Docket No. PF14–4–000 to staff activities involving the project. Now, as of the filing of this application on June 27, 2014, the NEPA Pre-Filing Process for this project has ended. From this time forward, this proceeding will be conducted in Docket No. CP14–509 as noted in the caption of this Notice. Pursuant to section 157.9 of the Commission’s regulations, 18 CFR E:\FR\FM\21JYN1.SGM 21JYN1

Agencies

[Federal Register Volume 79, Number 139 (Monday, July 21, 2014)]
[Notices]
[Pages 42304-42307]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-17044]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. IC14-10-000]


Commission Information Collection Activities (FERC-725E, FERC-
583, FERC-512, and FERC-588); Comment Request

AGENCY: Federal Energy Regulatory Commission.

ACTION: Comment request.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, 44 USC 3507(a)(1)(D), the Federal Energy Regulatory 
Commission (Commission or FERC) is submitting its information 
collections FERC-725E (Mandatory Reliability Standards--WECC), FERC-583 
(Annual Kilowatt Generating Report), FERC-512 (Application for 
Preliminary Permit), FERC-588 (Emergency Natural Gas Transportation, 
Sale, and Exchange) to the Office of Management and Budget (OMB) for 
review of the information collection requirements. Any interested 
person may file comments directly with OMB and should address a copy of 
those comments to the Commission as explained below. The Commission 
previously issued a Notice in the Federal Register (79 FR 19888, 4/2/
2014) requesting public comments. The Commission received no comments 
on the FERC-725E, FERC-583, FERC-512, or FERC-588 and is making this 
notation in its submittal to OMB.

DATES: Comments on the collection of information are due by August 20, 
2014.

ADDRESSES: Comments filed with OMB, identified by the OMB Control No. 
1902-0073 (FERC-512), 1902-0136 (FERC-583), 1902-0144 (FERC-588), or 
1902-0246 (FERC-725E) and should be sent via email to the Office of 
Information and Regulatory Affairs: oira_submission@omb.gov. 
Attention: Federal Energy Regulatory Commission Desk Officer. The Desk 
Officer may also be reached via telephone at 202-395-4718.
    A copy of the comments should also be sent to the Commission, in 
Docket No. IC14-10-000, by either of the following methods:
     eFiling at Commission's Web site: https://www.ferc.gov/docs-filing/efiling.asp.
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE., 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: https://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support 
by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.

    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at https://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
DataClearance@FERC.gov, by telephone at (202) 502-8663, and by fax at 
(202) 273-0873.

SUPPLEMENTARY INFORMATION: 
    Type of Request: Three-year extension of the information collection 
requirements for all collections described below with no changes to the 
current reporting requirements. Please note that each collection is 
distinct from the next.
    Comments: Comments are invited on: (1) Whether the collections of

[[Page 42305]]

information are necessary for the proper performance of the functions 
of the Commission, including whether the information will have 
practical utility; (2) the accuracy of the agency's estimates of the 
burden and cost of the collections of information, including the 
validity of the methodology and assumptions used; (3) ways to enhance 
the quality, utility and clarity of the information collections; and 
(4) ways to minimize the burden of the collections of information on 
those who are to respond, including the use of automated collection 
techniques or other forms of information technology.

FERC-725E, Mandatory Reliability Standards for the Western Electric 
Coordinating Council

    OMB Control No.: 1902-0246.
    Abstract: The information collected by the FERC-725E (OMB Control 
No. 1902-0246) is required to implement the statutory provisions of 
section 215 of the Federal Power Act (FPA) (16 U.S.C. 824o). Section 
215 of the FPA buttresses the Commission's efforts to strengthen the 
reliability of the interstate grid through the grant of new authority 
by providing for a system of mandatory Reliability Standards developed 
by the Electric Reliability Organization. Reliability Standards that 
the ERO proposes to the Commission may include Reliability Standards 
that are proposed to the ERO by a Regional Entity.\1\ A Regional Entity 
is an entity that has been approved by the Commission to enforce 
Reliability Standards under delegated authority from the ERO.\2\ On 
June 8, 2008 in an adjudicatory order, the Commission approved eight 
regional Reliability Standards submitted by the ERO that were proposed 
by the Western Electricity Coordinating Council (WECC).\3\
---------------------------------------------------------------------------

    \1\ 16 U.S.C. 824o(e)(4).
    \2\ 16 U.S.C. 824o(a)(7) and (e)(4).
    \3\ 72 FR 33462, June 18, 2007.
---------------------------------------------------------------------------

    WECC is responsible for coordinating and promoting electric system 
reliability. In addition to promoting a reliable electric power system 
in the Western Interconnection, WECC supports efficient competitive 
power markets, ensures open and non-discriminatory transmission access 
among members, and provides a forum for resolving transmission access 
disputes plus the coordination of operating and planning activities of 
its members.
    There are eight Reliability Standards currently applicable in the 
WECC region. These standards generally require entities to document 
compliance with substantive requirements, retain documentation, and 
submit reports to WECC.
     BAL-002-WECC-2 requires balancing authorities and reserve 
sharing groups to document compliance with the contingency reserve 
requirements described in the standard.
     BAL-004-WECC-02 requires balancing authorities to document 
that time error corrections and primary inadvertent interchange payback 
were conducted according the requirements in the standard.
     FAC-501-WECC-1 requires transmission owners with certain 
transmission paths to have a transmission maintenance and inspection 
plan and to document maintenance and inspection activities according to 
the plan.
     IRO-006-WECC-1 requires balancing authorities and 
reliability coordinators document actions taken to mitigate unscheduled 
flow.
     PRC-004-WECC-1 requires transmission owners, generator 
owners and transmission operators to document their analysis and/or 
mitigation due to certain misoperations on major transfer paths. This 
standard requires that documentation be kept for six years.
     TOP-007-WECC-1 requires transmission operators to document 
that when actual flows on major transfer paths exceed system operating 
limits their schedules and actual flows are not exceeded for longer 
than a specified time.
     VAR-002-WECC-1 requires generator operators and 
transmission operators to provide quarterly reports to the compliance 
monitor and have evidence related to their synchronous generators, 
synchronous condensers, and automatic voltage regulators.
     VAR-501-WECC-1 requires generator operators to provide 
quarterly reports to the compliance monitor and have evidence regarding 
operation of their power system stabilizers.
    The information generated by these standards generally serves to 
ensure entities are complying with applicable Reliability Standards.
    Type of Respondents: Balancing authorities, reserve sharing groups, 
transmission owners, reliability coordinators, transmission operators, 
generator operators.
    Estimate of Annual Burden: The Commission estimates the annual 
public reporting burden for the information collection as: \4\
---------------------------------------------------------------------------

    \4\ The initial public notice did not include the dollar figures 
associated with the burden hours below. The burden hours have not 
been modified since the issuance of the initial public notice.
    \5\ Number of respondents derived from the NERC Compliance 
Registry as of February 25, 2014.
    \6\ The total annual cost is derived from salary figures from 
the Bureau of Labor Statistics for three positions involved in the 
reporting and record-keeping associated with this collection. These 
figures include salary (https://bls.gov/oes/current/naics2_22.htm) 
and other associated benefits (https://www.bls.gov/news.release/ecec.nr0.htm):
     Manager: $84.72/hour.
     Engineer: $60.70/hour.
     File Clerk: $28.93/hour.
    This wage for the reporting requirements is an average of a 
manager and engineer wages ($72.71). The wage for recordkeeping 
requirements is based on the File Clerk position.
    \7\ Based on estimates in Order 751, Docket No. RM09-9-000.
    \8\ Based on burden estimates taken from the Order in Docket No. 
RR07-11-000 P. 130.
    \9\ Id.

            FERC-725E, Mandatory Reliability Standards for the Western Electric Coordinating Council
----------------------------------------------------------------------------------------------------------------
                                                                                                  Total annual
                                              Number of     Annual number of   Average burden    burden hours &
          FERC data collection             respondents \5\    responses per   hours & cost per    total annual
                                                               respondent       response \6\          cost
                                                       (1)               (2)               (3)       (1)*(2)*(3)
----------------------------------------------------------------------------------------------------------------
                FERC-725E
Reporting:
    Balancing Authorities...............                34                 1        21, $1,527      714, $51,918
    Generator Operators.................               228                 1          10, $727   2,280, $165,756
    Transmission Operators applicable to                86                 4          10, $727   3,440, $250,088
     standard VAR-002 \7\...............
    Transmission Operators that operate                  9                 3        40, $2,908    1,080, $78,516
     qualified transfer paths \8\.......
    Transmission Owners that operate                     5                 3        40, $2,908      600, $43,620
     qualified transfer paths \9\.......
    Reliability Coordinators............                 1                 1            1, $73            1, $73

[[Page 42306]]

 
    Reserve Sharing Group...............                 3                 1            1, $73           3, $219
                                         -----------------------------------------------------------------------
        Total...........................  ................  ................  ................   8,118, $590,190
----------------------------------------------------------------------------------------------------------------


 
 
----------------------------------------------------------------------------------------------------------------
Record-keeping \10\.........................  Balancing Authorities.........  ................        71, $2,054
                                              Balancing Authorities (IRO-     ................          34, $984
                                               006) \11\.
                                              Generator Operators...........  ................       228, $6,596
                                              Transmission Operator (VAR-     ................       344, $9,952
                                               002).
                                              Transmission Operator.........  ................       108, $3,124
                                              Transmission Owner............  ................        60, $1,736
                                              Reliability Coordinator \12\..  ................          34, $984
���������������������������������������������
    Total...................................  ..............................  ................      879, $25,430
----------------------------------------------------------------------------------------------------------------

FERC-583, Annual Kilowatt Generating Report (Annual Charges)

    OMB Control No.: 1902-0136.
---------------------------------------------------------------------------

    \10\ Based on 10% total annual burden hours per response.
    \11\ Based on record keeping hours for Balancing Authorities in 
Order 746 in Docket No. RM09-19-000 implementing IRO-006-WECC-1.
    \12\ Based on record keeping hours in Order 746 in Docket No. 
RM09-19-000.
    \13\ Based on data from Fiscal Year 2013, there were 517 
projects, owned by 241 FERC-regulated private and public licensees. 
Many of the licensees owned multiple projects.
    \14\ The estimates for cost per response are derived using the 
following formula: Average Burden Hours per Response * $70.50 per 
hour.
---------------------------------------------------------------------------

    Abstract: The FERC-583 is used by the Commission to implement the 
statutory provisions of section 10(e) of the Federal Power Act (FPA) 
(16 U.S.C. 803(e)), which requires the Commission to collect annual 
charges from hydropower licensees for, among other things, the cost of 
administering Part I of the FPA and for the use of United States dams. 
In addition, section 3401 of the Omnibus Budget Reconciliation Act of 
1986 (OBRA) authorizes the Commission to ``assess and collect fees and 
annual charges in any fiscal year in amounts equal to all of the costs 
incurred by the Commission in that fiscal year.'' The information is 
collected annually and used to determine the amounts of the annual 
charges to be assessed licensees for reimbursable government 
administrative costs and for the use of government dams. The Commission 
implements these filing requirements in the Code of Federal Regulations 
(CFR) under 18 CFR Part 11.
    Type of Respondent: FERC-regulated private and public hydropower 
licensees.
    Estimate of Annual Burden: The Commission estimates the annual 
public reporting burden for the information collection as:

                                   FERC-583, Annual Kilowatt Generating Report
                                                [Annual Charges]
----------------------------------------------------------------------------------------------------------------
                                                                               Total annual
    Number of       Annual number of   Total number of    Average burden &   burden  hours &        Cost per
 respondents \13\    responses per        responses      cost per response     total annual     respondent  ($)
                       respondent                               \14\               cost
(1)                             (2)        (1)*(2)=(3)                (4)        (3)*(4)=(5)            (5)/(1)
������������������
             517                  1                517            2, $141     1,034, $72,897               $141
----------------------------------------------------------------------------------------------------------------

FERC-512, Application for Preliminary Permit

    OMB Control No.: 1902-0073.
    Abstract: The Commission uses the information collected under the 
requirements of FERC-512 to implement the statutory provisions of 
sections 4(f), 5 and 7 of the Federal Power Act (FPA).\15\ The purpose 
of obtaining a preliminary permit is to maintain priority of the 
application for a license for a hydropower facility while the applicant 
conducts surveys to prepare maps, plans, specifications and estimates; 
conducts engineering, economic and environmental feasibility studies; 
and making financial arrangements. The conditions under which the 
priority will be maintained are set forth in each permit. During the 
term of the permit, no other application for a preliminary permit or 
application for a license submitted by another party can be accepted. 
The term of the permit is three years. The information collected under 
the designation FERC-512 is in the form of a written application for a 
preliminary permit which is used by Commission staff to determine an 
applicant's qualifications to hold a preliminary permit, review the 
proposed hydro development for feasibility and to issue a notice of the 
application in order to solicit public and agency comments. The 
Commission implements these mandatory filing requirements in the Code 
of Federal Regulations (CFR) under 18 CFR 4.31-.33, 4.81-.83.
---------------------------------------------------------------------------

    \15\ 16 U.S.C. 797, 798, & 800.
---------------------------------------------------------------------------

    Type of Respondents: Hydropower facilities.
    Estimate of Annual Burden: The Commission estimates the annual 
public reporting burden for the information collection as:

[[Page 42307]]



                                                      FERC-512: Application for Preliminary Permit
--------------------------------------------------------------------------------------------------------------------------------------------------------
                              Annual number of                                                            Total annual burden
 Number of  respondents         responses per            Total number of        Average burden/$ per      hours (total annual      Cost per respondent
                                 respondent                 responses               response \16\                cost)                     ($)
(1)                                         (2)               (1)*(2)=(3)                       (4)               (3)*(4)=(5)                  (5)/(1)
�������������������������
                  125                         1                       125              37,$2,608.50        4,625, $326,062.50                $2,608.50
--------------------------------------------------------------------------------------------------------------------------------------------------------

FERC-588, Emergency Natural Gas Transportation, Sale, and Exchange 
Transportation
---------------------------------------------------------------------------

    \16\ The estimates for cost per response are derived using the 
following formula: Average Burden Hours per Response * $70.50 per 
hour.
---------------------------------------------------------------------------

    OMB Control No.: 1902-0144.
    Abstract: The Commission uses the information collected under the 
requirements of FERC-588 to implement the statutory provisions of 
sections 7(c) of the Natural Gas Act (NGA) (P.L. 75-688) (15 USC 717-
717w) and provisions of the Natural Gas Policy Act of 1978 (NGPA), 15 
USC. 3301-3432. Under the NGA, a natural gas company must obtain 
Commission approval to engage in the transportation, sale or exchange 
of natural gas in interstate commerce. However, section 7(c) exempts 
from certificate requirements ``temporary acts or operations for which 
the issuance of a certificate will not be required in the public 
interest.'' The NGPA also provides for non-certificated interstate 
transactions involving intrastate pipelines and local distribution 
companies.
    A temporary operation, or emergency, is defined as any situation in 
which an actual or expected shortage of gas supply would require an 
interstate pipeline company, intrastate pipeline, local distribution 
company, or Hinshaw pipeline to curtail deliveries of gas or provide 
less than the projected level of service to the customer. The natural 
gas companies which provide the temporary assistance to the companies 
which are having the ``emergency'' must file the necessary information 
described in Part 284, Subpart I of the Commission's Regulations with 
the Commission so that it may determine if their assisting transaction/
operation qualifies for exemption. The assisting company may or may not 
be under the Commission's jurisdiction and if their assisting actions 
qualify for the exemption, they will not become subject to the 
Commission's jurisdiction for such actions.
    A report within forty-eight hours of the commencement of the 
transportation, sale or exchange, a request to extend the sixty-day 
term of the emergency transportation, if needed, and a termination 
report are required. The data required to be filed for the forty-eight 
hour report is specified by 18 CFR 284.270.
    Type of Respondents: Natural Gas Pipelines.
    Estimate of Annual Burden: The Commission estimates the annual 
public reporting burden for the information collection as:
---------------------------------------------------------------------------

    \17\ The estimates for cost per response are derived using the 
following formula: Average Burden Hours per Response * $70.50 per 
hour.

                FERC-588: Emergency Natural Gas Transportation, Sale, and Exchange Transportation
----------------------------------------------------------------------------------------------------------------
                                                                               Total annual
    Number of       Annual number of   Total number of    Average burden/$     burden hours         Cost per
   respondents       responses per        responses      per response \17\    (total annual      respondent ($)
                       respondent                                                 cost)
(1)                             (2)        (1)*(2)=(3)                (4)        (3)*(4)=(5)            (5)/(1)
������������������
               8                  1                  8           10, $705         80, $5,640               $705
----------------------------------------------------------------------------------------------------------------


    Dated: July 11, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-17044 Filed 7-18-14; 8:45 am]
BILLING CODE 6717-01-P