Sunshine Act Meeting Notice, 41272-41273 [2014-16658]
Download as PDF
41272
Federal Register / Vol. 79, No. 135 / Tuesday, July 15, 2014 / Notices
Inc., 813 Jefferson Hill Road, Nassau,
New York 12123 and Mr. Joshua A.
Sabo, Esq., 287 North Greenbush Road,
Troy, New York 12180. For Transferee:
Mr. Mark Boumansour, COO, GR
Catalyst One, LLC, c/o Gravity
Renewables, Inc., 1401 Walnut Street,
Suite 220, Boulder, Colorado 80302 and
Mr. Robert A. Panasci, Esq., Young/
Sommer, LLC, Executive Woods, 5
Palisades Drive, Albany, New York
12205.
FERC Contact: Patricia W. Gillis, (202)
502–8735.
Deadline for filing comments and
motions to intervene: 30 days from the
issuance date of this notice, by the
Commission. The Commission strongly
encourages electronic filing. Please file
motions to intervene and comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–4684–068.
Dated: July 8, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–16438 Filed 7–14–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Sunshine Act Meeting Notice
July 10, 2014.
The following notice of meeting is
published pursuant to section 3(a) of the
government in the Sunshine Act (Pub.
L. No. 94–409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING:
DATE AND TIME: July 17, 2014, 10:00 a.m.
PLACE: Room 2C, 888 First Street NE.,
Washington, DC 20426.
STATUS: Open.
MATTERS TO BE CONSIDERED: Agenda.
* Note—Items listed on the agenda may
be deleted without further notice.
CONTACT PERSON FOR MORE INFORMATION:
Kimberly D. Bose, Secretary, Telephone
(202) 502–8400.
For a recorded message listing items
struck from or added to the meeting, call
(202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all documents
relevant to the items on the agenda. All
public documents, however, may be
viewed on line at the Commission’s
Web site at https://www.ferc.gov using
the eLibrary link, or may be examined
in the Commission’s Public Reference
Room.
1007TH—MEETING
Item No.
Docket No.
Company
Administrative
A–1 ..............................
A–2 ..............................
AD02–1–000 .........................
AD02–7–000 .........................
Agency Business Matters.
Customer Matters, Reliability, Security and Market Operations.
Electric
E–1 ..............................
E–11 ............................
E–12 ............................
E–13 ............................
ER13–102–001 .....................
ER13–102–002
EL14–73–000 .......................
EL14–76–000 .......................
EL14–72–000 .......................
EL14–77–000 .......................
EL14–74–000 .......................
EL14–75–000 .......................
EL14–71–000 .......................
RM14–15–000 ......................
RM14–8–000 ........................
RM13–19–000 ......................
RM14–3–000
PL14–1–000 .........................
ER14–1175–001 ...................
EL14–38–000 .......................
E–14 ............................
ER14–480–001 .....................
E–2
E–3
E–4
E–5
E–6
..............................
..............................
..............................
..............................
..............................
E–7 ..............................
E–8 ..............................
E–9 ..............................
E–10 ............................
New York Independent System Operator, Inc.
The Empire District Electric Company.
Louisville Gas and Electric Company and Kentucky Utilities Company.
UNS Electric, Inc.
Westar Energy, Inc.
Kansas City Power & Light Company.
KCP&L Greater Missouri Operations Company.
Black Hills Power, Inc.
Physical Security Reliability Standard.
Protection System Maintenance Reliability Standard.
Generator Relay Loadability and Revised Transmission Relay Loadability Reliability
Standards.
Payment of Dividends from Funds Included in Capital Account.
Southwest Power Pool, Inc.
Sunflower Electric Power Corporation v. Kansas Municipal Energy Agency and Southwest Power Pool, Inc.
California Independent System Operator Corporation.
mstockstill on DSK4VPTVN1PROD with NOTICES
Gas
G–1 .............................
G–2 .............................
RM14–21–000 ......................
RP14–728–000 .....................
RP14–773–000 .....................
G–3 .............................
RP12–455–002 .....................
RP12–455–003
VerDate Mar<15>2010
17:46 Jul 14, 2014
Jkt 232001
PO 00000
Natural Gas Act Pipeline Maps.
El Paso Natural Gas Company, L.L.C.
City of Las Cruces, New Mexico; City of Mesa, Arizona; ConocoPhillips Company;
Freeport-McMoRan Corporation; Navajo Tribal Utility Authority; New Mexico Gas
Company, Inc. and Southwest Gas Corporation v. El Paso Natural Gas Company,
L.L.C. (Not Consolidated).
Panhandle Eastern Pipe Line Company, LP.
Frm 00027
Fmt 4703
Sfmt 4703
E:\FR\FM\15JYN1.SGM
15JYN1
Federal Register / Vol. 79, No. 135 / Tuesday, July 15, 2014 / Notices
41273
1007TH—MEETING—Continued
Item No.
Docket No.
Company
Hydro
H–1 ..............................
RM14–20–000 ......................
H–2 ..............................
H–3 ..............................
H–4 ..............................
P–2210–244 .........................
P–12532–005 .......................
P–7019–061 .........................
Format and Dimensions of Maps and Drawings Required by the Commission’s Hydropower Program.
Appalachian Power Company.
Pine Creek Mine, LLC.
Eastern Hydroelectric Corporation.
Certificates
C–1 ..............................
CP14–132–000 .....................
Kimberly D. Bose,
Secretary.
A free webcast of this event is
available through www.ferc.gov. Anyone
with Internet access who desires to view
this event can do so by navigating to
www.ferc.gov’s Calendar of Events and
locating this event in the Calendar. The
event will contain a link to its webcast.
The Capitol Connection provides
technical support for the free webcasts.
It also offers access to this event via
television in the DC area and via phone
bridge for a fee. If you have any
questions, visit
www.CapitolConnection.org or contact
Danelle Springer or David Reininger at
703–993–3100.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters, but will
not be telecast through the Capitol
Connection service.
[FR Doc. 2014–16658 Filed 7–11–14; 11:15 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR14–37–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Alpha Crude Connector, LLC; Notice of
Petition for Declaratory Order
Take notice that on July 3, 2014,
pursuant to Rule 207(a)(2) of the
Commission’s Rules of Practices and
Procedure, 18 CFR 385.207(a)(2)(2014),
Alpha Crude Connector, LLC filed a
petition for declaratory order seeking
approval of the overall tariff and rate
structure and apportionment policy for
a new crude oil pipeline system to
transport crude oil from Southeast New
VerDate Mar<15>2010
17:46 Jul 14, 2014
Jkt 232001
Gulf Oil Limited Partnership.
Mexico and West Texas to points of
interconnection with downstream
pipelines and a rail terminal, and thence
to local refineries, Cushing Oklahoma,
and the Gulf Coast, all as more fully
explained in the petition.
Any person desiring to intervene or to
protest in this proceedings must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov. or
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on August 1, 2014.
Dated: July 8, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–16436 Filed 7–14–14; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OAR–2013–0451; FRL–9913–70–
OAR]
Contractor Access to Vehicle and
Engine Information Claimed as
Confidential Business Information
(CBI) Submitted Under Title II of the
Clean Air Act
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency (EPA’s) Office of Transportation
and Air Quality (OTAQ) has authorized
various contractors to access
information which has been submitted
to EPA under Title II of the Clean Air
Act and that is claimed to be, or has
been determined to be, confidential
business information (CBI). EPA is
providing notice of past disclosure and
of ongoing and contemplated future
disclosure.
SUMMARY:
Access by EPA contractors to
material discussed in this Notice that
has been either claimed or determined
to be confidential business information
(CBI) is ongoing and is expected to
continue in the future. EPA will accept
comments on this Notice through July
21, 2014.
FOR FURTHER INFORMATION CONTACT:
Julian M. Davis, Attorney-Advisor,
Environmental Protection Agency, 2000
Traverwood, Ann Arbor, Michigan
(48105); Telephone number: 734–214–
DATES:
E:\FR\FM\15JYN1.SGM
15JYN1
Agencies
[Federal Register Volume 79, Number 135 (Tuesday, July 15, 2014)]
[Notices]
[Pages 41272-41273]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-16658]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Sunshine Act Meeting Notice
July 10, 2014.
The following notice of meeting is published pursuant to section
3(a) of the government in the Sunshine Act (Pub. L. No. 94-409), 5
U.S.C. 552b:
Agency Holding Meeting:
Date and Time: July 17, 2014, 10:00 a.m.
Place: Room 2C, 888 First Street NE., Washington, DC 20426.
Status: Open.
Matters to be Considered: Agenda. * Note--Items listed on the agenda
may be deleted without further notice.
Contact Person for More Information: Kimberly D. Bose, Secretary,
Telephone (202) 502-8400.
For a recorded message listing items struck from or added to the
meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It
does not include a listing of all documents relevant to the items on
the agenda. All public documents, however, may be viewed on line at the
Commission's Web site at https://www.ferc.gov using the eLibrary link,
or may be examined in the Commission's Public Reference Room.
1007th--Meeting
----------------------------------------------------------------------------------------------------------------
Item No. Docket No. Company
----------------------------------------------------------------------------------------------------------------
Administrative
----------------------------------------------------------------------------------------------------------------
A-1.................................... AD02-1-000................. Agency Business Matters.
A-2.................................... AD02-7-000................. Customer Matters, Reliability, Security
and Market Operations.
----------------------------------------------------------------------------------------------------------------
Electric
----------------------------------------------------------------------------------------------------------------
E-1.................................... ER13-102-001............... New York Independent System Operator, Inc.
ER13-102-002...............
E-2.................................... EL14-73-000................ The Empire District Electric Company.
E-3.................................... EL14-76-000................ Louisville Gas and Electric Company and
Kentucky Utilities Company.
E-4.................................... EL14-72-000................ UNS Electric, Inc.
E-5.................................... EL14-77-000................ Westar Energy, Inc.
E-6.................................... EL14-74-000................ Kansas City Power & Light Company.
EL14-75-000................ KCP&L Greater Missouri Operations Company.
E-7.................................... EL14-71-000................ Black Hills Power, Inc.
E-8.................................... RM14-15-000................ Physical Security Reliability Standard.
E-9.................................... RM14-8-000................. Protection System Maintenance Reliability
Standard.
E-10................................... RM13-19-000................ Generator Relay Loadability and Revised
RM14-3-000................. Transmission Relay Loadability
Reliability Standards.
E-11................................... PL14-1-000................. Payment of Dividends from Funds Included
in Capital Account.
E-12................................... ER14-1175-001.............. Southwest Power Pool, Inc.
E-13................................... EL14-38-000................ Sunflower Electric Power Corporation v.
Kansas Municipal Energy Agency and
Southwest Power Pool, Inc.
E-14................................... ER14-480-001............... California Independent System Operator
Corporation.
----------------------------------------------------------------------------------------------------------------
Gas
----------------------------------------------------------------------------------------------------------------
G-1.................................... RM14-21-000................ Natural Gas Act Pipeline Maps.
G-2.................................... RP14-728-000............... El Paso Natural Gas Company, L.L.C.
RP14-773-000............... City of Las Cruces, New Mexico; City of
Mesa, Arizona; ConocoPhillips Company;
Freeport-McMoRan Corporation; Navajo
Tribal Utility Authority; New Mexico Gas
Company, Inc. and Southwest Gas
Corporation v. El Paso Natural Gas
Company, L.L.C. (Not Consolidated).
G-3.................................... RP12-455-002............... Panhandle Eastern Pipe Line Company, LP.
RP12-455-003...............
----------------------------------------------------------------------------------------------------------------
[[Page 41273]]
Hydro
----------------------------------------------------------------------------------------------------------------
H-1.................................... RM14-20-000................ Format and Dimensions of Maps and Drawings
Required by the Commission's Hydropower
Program.
H-2.................................... P-2210-244................. Appalachian Power Company.
H-3.................................... P-12532-005................ Pine Creek Mine, LLC.
H-4.................................... P-7019-061................. Eastern Hydroelectric Corporation.
----------------------------------------------------------------------------------------------------------------
Certificates
----------------------------------------------------------------------------------------------------------------
C-1.................................... CP14-132-000............... Gulf Oil Limited Partnership.
----------------------------------------------------------------------------------------------------------------
Kimberly D. Bose,
Secretary.
A free webcast of this event is available through www.ferc.gov.
Anyone with Internet access who desires to view this event can do so by
navigating to www.ferc.gov's Calendar of Events and locating this event
in the Calendar. The event will contain a link to its webcast. The
Capitol Connection provides technical support for the free webcasts. It
also offers access to this event via television in the DC area and via
phone bridge for a fee. If you have any questions, visit
www.CapitolConnection.org or contact Danelle Springer or David
Reininger at 703-993-3100.
Immediately following the conclusion of the Commission Meeting, a
press briefing will be held in the Commission Meeting Room. Members of
the public may view this briefing in the designated overflow room. This
statement is intended to notify the public that the press briefings
that follow Commission meetings may now be viewed remotely at
Commission headquarters, but will not be telecast through the Capitol
Connection service.
[FR Doc. 2014-16658 Filed 7-11-14; 11:15 am]
BILLING CODE 6717-01-P