Coast Guard
33 CFR Part 117
[Docket No. USCG–2014–0560]
Drawbridge Operation Regulations;
Narrow Bay, Smith Point, NY
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Smith Point
Bridge across Narrow Bay, mile 6.1,
between Smith Point and Fire Island,
New York. The deviation is necessary to
facilitate the 5K Run for Literacy. This
deviation allows the bridge to remain
closed for one hour to facilitate public
safety during a public event.
DATES: This deviation is effective
between 9 a.m. and 10 a.m. on
September 6, 2014.
ADDRESSES: The docket for this
deviation, [USCG–2014–0560] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140, on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Ms. Judy LeungYee, Project Officer, First Coast Guard
District, judy.k.leung-yee@uscg.mil, or
(212) 668–7165. If you have questions
on viewing the docket, call Cheryl
Collins, Program Manager, Docket
Operations, telephone 202–366–9826.
SUPPLEMENTARY INFORMATION: The Smith
Point Bridge, mile 6.1, across Narrow
Bay, between Smith Point and Fire
Island, New York, has a vertical
clearance in the closed position of 18
feet at mean high water and 19 feet at
mean low water. The drawbridge
wreier-aviles on DSK5TPTVN1PROD with RULES
SUMMARY:
VerDate Mar<15>2010
15:12 Jul 14, 2014
Jkt 232001
operation regulations are listed at 33
CFR 117.799(d).
The waterway users are recreational
vessels of various sizes.
The owner of the bridge, Suffolk
County Department of Public Works,
requested a temporary deviation from
the regulations to allow the bridge to
remain closed for one hour to facilitate
public safety during a public event, the
5K Run for Literacy.
Under this temporary deviation the
Smith Point Bridge across Narrow Bay,
mile 6.1, between Smith Point and Fire
Island, may remain in the closed
position between 9 a.m. and 10 a.m. on
September 6, 2014.
Vessels that can pass under the bridge
in the closed position may do so at any
time. There are no alternate routes;
however, the bridge can open in an
emergency. Vessel operators will be
notified of the bridge closure through a
Safety Marine Information Broadcast
(SMIB) issued by the Coast Guard.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: July 2, 2014.
C.J. Bisignano,
Supervisory Bridge Management Specialist,
First Coast Guard District.
[FR Doc. 2014–16603 Filed 7–14–14; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2014–0566]
Drawbridge Operation Regulation;
Grassy Sound Channel, Middle
Township, NJ
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Grassy Sound
Channel Bridge (Ocean Drive), mile 1.0,
at Middle Township, NJ. The deviation
is necessary to accommodate the ‘‘Tri
the Wildwoods Triathlon and 5k’’ event.
This temporary deviation allows the
bridge draw span to remain in the
closed to navigation position for 4 hours
during the event.
DATES: This deviation is effective from
6 a.m. until 10 a.m. on August 16, 2014.
SUMMARY:
PO 00000
Frm 00051
Fmt 4700
Sfmt 4700
41135
The docket for this
deviation, [USCG–2014–0566] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Mr. Jim
Rousseau, Bridge Administration
Branch Fifth District, Coast Guard;
telephone (757) 398–6557, email
James.L.Rousseau2@uscg.mil. If you
have questions on reviewing the docket,
call Cheryl Collins, Program Manager,
Docket Operations, (202) 366–9826.
SUPPLEMENTARY INFORMATION: Cape May
County Department of Public Works,
owner of the drawbridge, has requested
on behalf of DelMosports, Inc. a
temporary deviation from the current
operating schedule to accommodate the
‘‘Tri the Wildwoods Triathlon and 5K’’
event.
The existing drawbridge operation
regulations are listed at 33 CFR 117.721.
On the day of the event, the normal
operating schedule for the Grassy Sound
Channel Bridge (Ocean Drive), at mile
1.0, at Middle Township, NJ shall open
on signal from 6 a.m. to 8 p.m. Two
hours advance notice is required for all
other openings by calling (609) 368–
4591. The Grassy Sound Channel Bridge
(Ocean Drive) across the Grassy Sound
has a vertical clearance in the closed
position of 15 feet above mean high
water.
Under this temporary deviation, the
drawbridge will be allowed to remain in
the closed to navigation position from 6
a.m. to 10 a.m. on Saturday, August 16,
2014 to accommodate the ‘‘Tri the
Wildwoods Triathlon and 5K’’ event.
The bridge will operate under its normal
operating schedule at all other times.
Log books indicate there has only been
one opening request for this yearly
event in 9 years and waterway users are
accustomed to the temporary closure.
Vessels able to pass under the bridge
in the closed position may do so at any
time and are advised to proceed with
caution. The bridge will be able to open
for emergencies. The New Jersey
Intracoastal Waterway is an alternate
route for vessels transiting this area and
vessels may pass before and after the
closure. The Coast Guard will also
ADDRESSES:
E:\FR\FM\15JYR1.SGM
15JYR1
Agencies
[Federal Register Volume 79, Number 135 (Tuesday, July 15, 2014)]
[Rules and Regulations]
[Page 41135]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-16603]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2014-0560]
Drawbridge Operation Regulations; Narrow Bay, Smith Point, NY
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Smith Point Bridge across Narrow
Bay, mile 6.1, between Smith Point and Fire Island, New York. The
deviation is necessary to facilitate the 5K Run for Literacy. This
deviation allows the bridge to remain closed for one hour to facilitate
public safety during a public event.
DATES: This deviation is effective between 9 a.m. and 10 a.m. on
September 6, 2014.
ADDRESSES: The docket for this deviation, [USCG-2014-0560] is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140, on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Ms. Judy Leung-Yee, Project Officer,
First Coast Guard District, judy.k.leung-yee@uscg.mil, or (212) 668-
7165. If you have questions on viewing the docket, call Cheryl Collins,
Program Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Smith Point Bridge, mile 6.1, across
Narrow Bay, between Smith Point and Fire Island, New York, has a
vertical clearance in the closed position of 18 feet at mean high water
and 19 feet at mean low water. The drawbridge operation regulations are
listed at 33 CFR 117.799(d).
The waterway users are recreational vessels of various sizes.
The owner of the bridge, Suffolk County Department of Public Works,
requested a temporary deviation from the regulations to allow the
bridge to remain closed for one hour to facilitate public safety during
a public event, the 5K Run for Literacy.
Under this temporary deviation the Smith Point Bridge across Narrow
Bay, mile 6.1, between Smith Point and Fire Island, may remain in the
closed position between 9 a.m. and 10 a.m. on September 6, 2014.
Vessels that can pass under the bridge in the closed position may
do so at any time. There are no alternate routes; however, the bridge
can open in an emergency. Vessel operators will be notified of the
bridge closure through a Safety Marine Information Broadcast (SMIB)
issued by the Coast Guard.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.