Drawbridge Operation Regulation; Mill River, New Haven, CT, 41136 [2014-16602]
Download as PDF
41136
Federal Register / Vol. 79, No. 135 / Tuesday, July 15, 2014 / Rules and Regulations
inform additional waterway users
through our Local and Broadcast
Notices to Mariners of the closure
periods for the bridge so that vessels can
arrange their transits to minimize any
impacts caused by the temporary
deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: July 1, 2014.
Waverly W. Gregory, Jr.,
Bridge Program Manager, Fifth Coast Guard
District.
[FR Doc. 2014–16598 Filed 7–14–14; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2014–0561]
Drawbridge Operation Regulation; Mill
River, New Haven, CT
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Chapel Street
Bridge across the Mill River, mile 0.4, at
New Haven, Connecticut. The deviation
is necessary for inspection of the center
pivot bearing at the bridge. This
temporary deviation allows the bridge to
remain in the closed position for twelve
hours to perform bridge inspection
operations.
DATES: This deviation is effective from
7 a.m. through 7 p.m. on August 18,
2014.
ADDRESSES: The docket for this
deviation, [USCG–2014–0561] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140, on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Ms. Judy Leung-
wreier-aviles on DSK5TPTVN1PROD with RULES
SUMMARY:
VerDate Mar<15>2010
15:12 Jul 14, 2014
Jkt 232001
Yee, Project Officer, First Coast Guard
District, judy.k.leung-yee@uscg.mil, or
(212) 668–7165. If you have questions
on viewing the docket, call Cheryl
Collins, Program Manager, Docket
Operations, telephone 202–366–9826.
SUPPLEMENTARY INFORMATION: The
Chapel Street Bridge has a vertical
clearance of 7 feet at mean high water
and 13 feet at mean low water. The
existing drawbridge operating
regulations are found at 33 CFR
117.213(d).
The Mill River has seasonal
recreational and commercial vessels of
various sizes.
The owner of the bridge, the City of
New Haven, requested a bridge closure
to facilitate inspection of the pivot
bearing at the bridge.
Under this temporary deviation, the
Chapel Street Bridge may remain in the
closed position from 7 a.m. through 7
p.m. on August 6, 2014.
Vessels that can pass under the bridge
in the closed position may do so at all
times. There are no alternate routes. The
bridge can be opened in the event of an
emergency during this bridge
inspection.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: July 2, 2014.
C.J. Bisignano,
Supervisory Bridge Management Specialist,
First Coast Guard District.
[FR Doc. 2014–16602 Filed 7–14–14; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2014–0552]
Drawbridge Operation Regulation;
Harlem River, New York City, NY
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the operation of
the Park Avenue Bridge across the
Harlem River, mile 2.1, at New York
City, New York. The deviation is
necessary for replacement of the lift
cables and rehabilitation of the
SUMMARY:
PO 00000
Frm 00052
Fmt 4700
Sfmt 4700
operating system at the bridge. This
temporary deviation allows the bridge to
remain in the closed position for 179
days to perform major rehabilitation
repairs.
This deviation is effective from
September 15, 2014 through March 12,
2015.
ADDRESSES: The docket for this
deviation, [USCG–2014–0552] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140, on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Mr. Joe Arca,
Project Officer, First Coast Guard
District, joe.m.arca@uscg.mil, or (212)
668–7165. If you have questions on
viewing the docket, call Cheryl Collins,
Program Manager, Docket Operations,
telephone 202–366–9826.
SUPPLEMENTARY INFORMATION: The Park
Avenue Bridge has a vertical clearance
of 25 feet at mean high water and 30 feet
at mean low water. The existing
drawbridge operating regulations are
found at 33 CFR 117.789(c).
The Harlem River has predominantly
commercial vessel traffic that can pass
under the Park Avenue Bridge in the
closed position without a bridge
opening.
The owner of the bridge, Metro North
Railroad, requested a bridge closure to
facilitate a major bridge rehabilitation
project, the replacement of the bridge
lift cables and replacement of the
electrical and mechanical operating
system at the bridge.
Under this temporary deviation, the
Park Avenue Bridge may remain in the
closed position from September 15,
2014 through March 12, 2015.
Vessels that can pass under the bridge
in the closed position may do so at all
times. There are no alternate routes. The
bridge can’t be opened in the event of
an emergency during this rehabilitation
construction.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
DATES:
E:\FR\FM\15JYR1.SGM
15JYR1
Agencies
[Federal Register Volume 79, Number 135 (Tuesday, July 15, 2014)]
[Rules and Regulations]
[Page 41136]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-16602]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2014-0561]
Drawbridge Operation Regulation; Mill River, New Haven, CT
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Chapel Street Bridge across the
Mill River, mile 0.4, at New Haven, Connecticut. The deviation is
necessary for inspection of the center pivot bearing at the bridge.
This temporary deviation allows the bridge to remain in the closed
position for twelve hours to perform bridge inspection operations.
DATES: This deviation is effective from 7 a.m. through 7 p.m. on August
18, 2014.
ADDRESSES: The docket for this deviation, [USCG-2014-0561] is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140, on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Ms. Judy Leung-Yee, Project Officer,
First Coast Guard District, judy.k.leung-yee@uscg.mil, or (212) 668-
7165. If you have questions on viewing the docket, call Cheryl Collins,
Program Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Chapel Street Bridge has a vertical
clearance of 7 feet at mean high water and 13 feet at mean low water.
The existing drawbridge operating regulations are found at 33 CFR
117.213(d).
The Mill River has seasonal recreational and commercial vessels of
various sizes.
The owner of the bridge, the City of New Haven, requested a bridge
closure to facilitate inspection of the pivot bearing at the bridge.
Under this temporary deviation, the Chapel Street Bridge may remain
in the closed position from 7 a.m. through 7 p.m. on August 6, 2014.
Vessels that can pass under the bridge in the closed position may
do so at all times. There are no alternate routes. The bridge can be
opened in the event of an emergency during this bridge inspection.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: July 2, 2014.
C.J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2014-16602 Filed 7-14-14; 8:45 am]
BILLING CODE 9110-04-P