Drawbridge Operation Regulation; Grassy Sound Channel, Middle Township, NJ, 41135-41136 [2014-16598]
Download as PDF
Federal Register / Vol. 79, No. 135 / Tuesday, July 15, 2014 / Rules and Regulations
Issued in Washington, DC, on this 10th day
of July 2014.
Judith Starr,
General Counsel, Pension Benefit Guaranty
Corporation.
[FR Doc. 2014–16630 Filed 7–14–14; 8:45 am]
BILLING CODE 7709–02–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2014–0560]
Drawbridge Operation Regulations;
Narrow Bay, Smith Point, NY
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Smith Point
Bridge across Narrow Bay, mile 6.1,
between Smith Point and Fire Island,
New York. The deviation is necessary to
facilitate the 5K Run for Literacy. This
deviation allows the bridge to remain
closed for one hour to facilitate public
safety during a public event.
DATES: This deviation is effective
between 9 a.m. and 10 a.m. on
September 6, 2014.
ADDRESSES: The docket for this
deviation, [USCG–2014–0560] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140, on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Ms. Judy LeungYee, Project Officer, First Coast Guard
District, judy.k.leung-yee@uscg.mil, or
(212) 668–7165. If you have questions
on viewing the docket, call Cheryl
Collins, Program Manager, Docket
Operations, telephone 202–366–9826.
SUPPLEMENTARY INFORMATION: The Smith
Point Bridge, mile 6.1, across Narrow
Bay, between Smith Point and Fire
Island, New York, has a vertical
clearance in the closed position of 18
feet at mean high water and 19 feet at
mean low water. The drawbridge
wreier-aviles on DSK5TPTVN1PROD with RULES
SUMMARY:
VerDate Mar<15>2010
15:12 Jul 14, 2014
Jkt 232001
operation regulations are listed at 33
CFR 117.799(d).
The waterway users are recreational
vessels of various sizes.
The owner of the bridge, Suffolk
County Department of Public Works,
requested a temporary deviation from
the regulations to allow the bridge to
remain closed for one hour to facilitate
public safety during a public event, the
5K Run for Literacy.
Under this temporary deviation the
Smith Point Bridge across Narrow Bay,
mile 6.1, between Smith Point and Fire
Island, may remain in the closed
position between 9 a.m. and 10 a.m. on
September 6, 2014.
Vessels that can pass under the bridge
in the closed position may do so at any
time. There are no alternate routes;
however, the bridge can open in an
emergency. Vessel operators will be
notified of the bridge closure through a
Safety Marine Information Broadcast
(SMIB) issued by the Coast Guard.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: July 2, 2014.
C.J. Bisignano,
Supervisory Bridge Management Specialist,
First Coast Guard District.
[FR Doc. 2014–16603 Filed 7–14–14; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2014–0566]
Drawbridge Operation Regulation;
Grassy Sound Channel, Middle
Township, NJ
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Grassy Sound
Channel Bridge (Ocean Drive), mile 1.0,
at Middle Township, NJ. The deviation
is necessary to accommodate the ‘‘Tri
the Wildwoods Triathlon and 5k’’ event.
This temporary deviation allows the
bridge draw span to remain in the
closed to navigation position for 4 hours
during the event.
DATES: This deviation is effective from
6 a.m. until 10 a.m. on August 16, 2014.
SUMMARY:
PO 00000
Frm 00051
Fmt 4700
Sfmt 4700
41135
The docket for this
deviation, [USCG–2014–0566] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Mr. Jim
Rousseau, Bridge Administration
Branch Fifth District, Coast Guard;
telephone (757) 398–6557, email
James.L.Rousseau2@uscg.mil. If you
have questions on reviewing the docket,
call Cheryl Collins, Program Manager,
Docket Operations, (202) 366–9826.
SUPPLEMENTARY INFORMATION: Cape May
County Department of Public Works,
owner of the drawbridge, has requested
on behalf of DelMosports, Inc. a
temporary deviation from the current
operating schedule to accommodate the
‘‘Tri the Wildwoods Triathlon and 5K’’
event.
The existing drawbridge operation
regulations are listed at 33 CFR 117.721.
On the day of the event, the normal
operating schedule for the Grassy Sound
Channel Bridge (Ocean Drive), at mile
1.0, at Middle Township, NJ shall open
on signal from 6 a.m. to 8 p.m. Two
hours advance notice is required for all
other openings by calling (609) 368–
4591. The Grassy Sound Channel Bridge
(Ocean Drive) across the Grassy Sound
has a vertical clearance in the closed
position of 15 feet above mean high
water.
Under this temporary deviation, the
drawbridge will be allowed to remain in
the closed to navigation position from 6
a.m. to 10 a.m. on Saturday, August 16,
2014 to accommodate the ‘‘Tri the
Wildwoods Triathlon and 5K’’ event.
The bridge will operate under its normal
operating schedule at all other times.
Log books indicate there has only been
one opening request for this yearly
event in 9 years and waterway users are
accustomed to the temporary closure.
Vessels able to pass under the bridge
in the closed position may do so at any
time and are advised to proceed with
caution. The bridge will be able to open
for emergencies. The New Jersey
Intracoastal Waterway is an alternate
route for vessels transiting this area and
vessels may pass before and after the
closure. The Coast Guard will also
ADDRESSES:
E:\FR\FM\15JYR1.SGM
15JYR1
41136
Federal Register / Vol. 79, No. 135 / Tuesday, July 15, 2014 / Rules and Regulations
inform additional waterway users
through our Local and Broadcast
Notices to Mariners of the closure
periods for the bridge so that vessels can
arrange their transits to minimize any
impacts caused by the temporary
deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: July 1, 2014.
Waverly W. Gregory, Jr.,
Bridge Program Manager, Fifth Coast Guard
District.
[FR Doc. 2014–16598 Filed 7–14–14; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2014–0561]
Drawbridge Operation Regulation; Mill
River, New Haven, CT
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Chapel Street
Bridge across the Mill River, mile 0.4, at
New Haven, Connecticut. The deviation
is necessary for inspection of the center
pivot bearing at the bridge. This
temporary deviation allows the bridge to
remain in the closed position for twelve
hours to perform bridge inspection
operations.
DATES: This deviation is effective from
7 a.m. through 7 p.m. on August 18,
2014.
ADDRESSES: The docket for this
deviation, [USCG–2014–0561] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140, on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Ms. Judy Leung-
wreier-aviles on DSK5TPTVN1PROD with RULES
SUMMARY:
VerDate Mar<15>2010
15:12 Jul 14, 2014
Jkt 232001
Yee, Project Officer, First Coast Guard
District, judy.k.leung-yee@uscg.mil, or
(212) 668–7165. If you have questions
on viewing the docket, call Cheryl
Collins, Program Manager, Docket
Operations, telephone 202–366–9826.
SUPPLEMENTARY INFORMATION: The
Chapel Street Bridge has a vertical
clearance of 7 feet at mean high water
and 13 feet at mean low water. The
existing drawbridge operating
regulations are found at 33 CFR
117.213(d).
The Mill River has seasonal
recreational and commercial vessels of
various sizes.
The owner of the bridge, the City of
New Haven, requested a bridge closure
to facilitate inspection of the pivot
bearing at the bridge.
Under this temporary deviation, the
Chapel Street Bridge may remain in the
closed position from 7 a.m. through 7
p.m. on August 6, 2014.
Vessels that can pass under the bridge
in the closed position may do so at all
times. There are no alternate routes. The
bridge can be opened in the event of an
emergency during this bridge
inspection.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: July 2, 2014.
C.J. Bisignano,
Supervisory Bridge Management Specialist,
First Coast Guard District.
[FR Doc. 2014–16602 Filed 7–14–14; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2014–0552]
Drawbridge Operation Regulation;
Harlem River, New York City, NY
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the operation of
the Park Avenue Bridge across the
Harlem River, mile 2.1, at New York
City, New York. The deviation is
necessary for replacement of the lift
cables and rehabilitation of the
SUMMARY:
PO 00000
Frm 00052
Fmt 4700
Sfmt 4700
operating system at the bridge. This
temporary deviation allows the bridge to
remain in the closed position for 179
days to perform major rehabilitation
repairs.
This deviation is effective from
September 15, 2014 through March 12,
2015.
ADDRESSES: The docket for this
deviation, [USCG–2014–0552] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140, on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Mr. Joe Arca,
Project Officer, First Coast Guard
District, joe.m.arca@uscg.mil, or (212)
668–7165. If you have questions on
viewing the docket, call Cheryl Collins,
Program Manager, Docket Operations,
telephone 202–366–9826.
SUPPLEMENTARY INFORMATION: The Park
Avenue Bridge has a vertical clearance
of 25 feet at mean high water and 30 feet
at mean low water. The existing
drawbridge operating regulations are
found at 33 CFR 117.789(c).
The Harlem River has predominantly
commercial vessel traffic that can pass
under the Park Avenue Bridge in the
closed position without a bridge
opening.
The owner of the bridge, Metro North
Railroad, requested a bridge closure to
facilitate a major bridge rehabilitation
project, the replacement of the bridge
lift cables and replacement of the
electrical and mechanical operating
system at the bridge.
Under this temporary deviation, the
Park Avenue Bridge may remain in the
closed position from September 15,
2014 through March 12, 2015.
Vessels that can pass under the bridge
in the closed position may do so at all
times. There are no alternate routes. The
bridge can’t be opened in the event of
an emergency during this rehabilitation
construction.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
DATES:
E:\FR\FM\15JYR1.SGM
15JYR1
Agencies
[Federal Register Volume 79, Number 135 (Tuesday, July 15, 2014)]
[Rules and Regulations]
[Pages 41135-41136]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-16598]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2014-0566]
Drawbridge Operation Regulation; Grassy Sound Channel, Middle
Township, NJ
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Grassy Sound Channel Bridge (Ocean
Drive), mile 1.0, at Middle Township, NJ. The deviation is necessary to
accommodate the ``Tri the Wildwoods Triathlon and 5k'' event. This
temporary deviation allows the bridge draw span to remain in the closed
to navigation position for 4 hours during the event.
DATES: This deviation is effective from 6 a.m. until 10 a.m. on August
16, 2014.
ADDRESSES: The docket for this deviation, [USCG-2014-0566] is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140 on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Mr. Jim Rousseau, Bridge
Administration Branch Fifth District, Coast Guard; telephone (757) 398-
6557, email James.L.Rousseau2@uscg.mil. If you have questions on
reviewing the docket, call Cheryl Collins, Program Manager, Docket
Operations, (202) 366-9826.
SUPPLEMENTARY INFORMATION: Cape May County Department of Public Works,
owner of the drawbridge, has requested on behalf of DelMosports, Inc. a
temporary deviation from the current operating schedule to accommodate
the ``Tri the Wildwoods Triathlon and 5K'' event.
The existing drawbridge operation regulations are listed at 33 CFR
117.721. On the day of the event, the normal operating schedule for the
Grassy Sound Channel Bridge (Ocean Drive), at mile 1.0, at Middle
Township, NJ shall open on signal from 6 a.m. to 8 p.m. Two hours
advance notice is required for all other openings by calling (609) 368-
4591. The Grassy Sound Channel Bridge (Ocean Drive) across the Grassy
Sound has a vertical clearance in the closed position of 15 feet above
mean high water.
Under this temporary deviation, the drawbridge will be allowed to
remain in the closed to navigation position from 6 a.m. to 10 a.m. on
Saturday, August 16, 2014 to accommodate the ``Tri the Wildwoods
Triathlon and 5K'' event. The bridge will operate under its normal
operating schedule at all other times. Log books indicate there has
only been one opening request for this yearly event in 9 years and
waterway users are accustomed to the temporary closure.
Vessels able to pass under the bridge in the closed position may do
so at any time and are advised to proceed with caution. The bridge will
be able to open for emergencies. The New Jersey Intracoastal Waterway
is an alternate route for vessels transiting this area and vessels may
pass before and after the closure. The Coast Guard will also
[[Page 41136]]
inform additional waterway users through our Local and Broadcast
Notices to Mariners of the closure periods for the bridge so that
vessels can arrange their transits to minimize any impacts caused by
the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: July 1, 2014.
Waverly W. Gregory, Jr.,
Bridge Program Manager, Fifth Coast Guard District.
[FR Doc. 2014-16598 Filed 7-14-14; 8:45 am]
BILLING CODE 9110-04-P