City of Wadsworth, Ohio; Notice of Availability of Environmental Assessment, 41268 [2014-16442]
Download as PDF
41268
Federal Register / Vol. 79, No. 135 / Tuesday, July 15, 2014 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER13–102–004]
New York Independent System
Operator, Inc.; Notice of Compliance
Filing
mstockstill on DSK4VPTVN1PROD with NOTICES
Take notice that on July 3, 2014, New
York Independent System Operator, Inc.
(NYISO) submitted a compliance filing
to provide redline and clean versions of
its Open Access Transmission Tariff
(OATT) and Market Administration and
Control Area Services Tariff (Services
Tariff) revisions filed to comply with
the requirements of Order Nos. 1000
and 1000–A.1 NYISO states that the
redline and clean versions of its OATT
and Services Tariff constitute a
supplemental ministerial filing to
provide redline versions of the OATT
and Services Tariff sections for which
the NYISO requested a revised effective
date on July 2, 2014.2
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
1 Transmission Planning and Cost Allocation by
Transmission Owning and Operating Public
Utilities, Order No. 1000, 76 FR 49842 (Aug. 11,
2011), FERC Stats. & Regs. ¶ 31,323 (2011), order
on reh’g, Order No. 1000–A, 77 FR 32184 (May 31,
2012), 139 FERC ¶ 61,132 (2012).
2 See NYISO, Compliance Filing, Docket No.
ER13–102–003 (filed July 2, 2014) (requesting
deferral of the effective date of January 1, 2014 for
its Open Access Transmission Tariff revisions filed
to comply with the requirements of Order Nos. 1000
and 1000–A).
VerDate Mar<15>2010
17:46 Jul 14, 2014
Jkt 232001
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on July 14, 2014.
Dated: July 8, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–16435 Filed 7–14–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. P–12796–004–OH]
City of Wadsworth, Ohio; Notice of
Availability of Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 Code of Federal
Regulations (CFR) Part 380 (Order No.
486, 52 Federal Register [FR] 47897),
the Office of Energy Projects has
reviewed the application for a major
original license for the 50-megawatt
Robert C. Byrd Hydroelectric Project,
(RC Byrd Project or project), located on
the Ohio River at the U.S. Army Corps
of Engineers’ (Corps) Robert C. Byrd
Locks and Dam (RC Byrd Locks and
Dam), approximately 12.7 miles south of
the confluence of the Ohio River and the
Kanawha River, 9 miles south of the
Town of Gallipolis, Gallia County, Ohio,
and has prepared a Draft Environmental
Assessment (DEA) for the project. The
proposed project would occupy 7.6
acres of federal land administered by
the Corps.
The DEA contains the staff’s analysis
of the potential environmental impacts
of the proposed project and concludes
that licensing the proposed project, with
appropriate environmental protective
measures, would not constitute a major
federal action that would significantly
affect the quality of the human
environment.
A copy of the DEA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at
www.ferc.gov using the ‘‘eLibrary’’ link.
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll-free at 1–866–208–3676,
or for TTY, 202–502–8659.
You may also register online at
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
30 days from the date of this notice.
The Commission strongly encourages
electronic filings. Please file comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp.
You must include your name and
contact information at the end of your
comments. For assistance, please
contact FERC Online Support. In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. Please affix
‘‘Project No. 12796–004’’ to all
comments.
For further information, contact
Gaylord Hoisington by telephone at
202–502–6032 or by email at
gaylord.hoisington@ferc.gov.
Dated: July 8, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–16442 Filed 7–14–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6544–003]
I–MAXMAT Corporation; Ampersand
Collins Hydro, LLC; Notice of Transfer
of Exemption
1. By letter filed June 16, 2014,
Ampersand Collins Hydro, LLC
informed the Commission that the
exemption from licensing for the Collins
Project, FERC No. 6544, originally
issued February 9, 1984,1 has been
transferred to Ampersand Collins
Hydro, LLC. The project is located on
1 26 FERC ¶ 62,112, Order Granting Exemption
from Licensing of a Small Hydroelectric Project of
5 Megawatts or Less.
E:\FR\FM\15JYN1.SGM
15JYN1
Agencies
[Federal Register Volume 79, Number 135 (Tuesday, July 15, 2014)]
[Notices]
[Page 41268]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-16442]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. P-12796-004-OH]
City of Wadsworth, Ohio; Notice of Availability of Environmental
Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 Code of Federal Regulations (CFR) Part 380 (Order No.
486, 52 Federal Register [FR] 47897), the Office of Energy Projects has
reviewed the application for a major original license for the 50-
megawatt Robert C. Byrd Hydroelectric Project, (RC Byrd Project or
project), located on the Ohio River at the U.S. Army Corps of
Engineers' (Corps) Robert C. Byrd Locks and Dam (RC Byrd Locks and
Dam), approximately 12.7 miles south of the confluence of the Ohio
River and the Kanawha River, 9 miles south of the Town of Gallipolis,
Gallia County, Ohio, and has prepared a Draft Environmental Assessment
(DEA) for the project. The proposed project would occupy 7.6 acres of
federal land administered by the Corps.
The DEA contains the staff's analysis of the potential
environmental impacts of the proposed project and concludes that
licensing the proposed project, with appropriate environmental
protective measures, would not constitute a major federal action that
would significantly affect the quality of the human environment.
A copy of the DEA is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's Web site at
www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY,
202-502-8659.
You may also register online at www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Any comments should be filed within 30 days from the date of this
notice.
The Commission strongly encourages electronic filings. Please file
comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to
6,000 characters, without prior registration, using the eComment system
at https://www.ferc.gov/docs-filing/ecomment.asp.
You must include your name and contact information at the end of
your comments. For assistance, please contact FERC Online Support. In
lieu of electronic filing, please send a paper copy to: Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426. Please affix ``Project No. 12796-004'' to all comments.
For further information, contact Gaylord Hoisington by telephone at
202-502-6032 or by email at gaylord.hoisington@ferc.gov.
Dated: July 8, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-16442 Filed 7-14-14; 8:45 am]
BILLING CODE 6717-01-P