I-MAXMAT Corporation; Ampersand Collins Hydro, LLC; Notice of Transfer of Exemption, 41268-41269 [2014-16441]

Download as PDF 41268 Federal Register / Vol. 79, No. 135 / Tuesday, July 15, 2014 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER13–102–004] New York Independent System Operator, Inc.; Notice of Compliance Filing mstockstill on DSK4VPTVN1PROD with NOTICES Take notice that on July 3, 2014, New York Independent System Operator, Inc. (NYISO) submitted a compliance filing to provide redline and clean versions of its Open Access Transmission Tariff (OATT) and Market Administration and Control Area Services Tariff (Services Tariff) revisions filed to comply with the requirements of Order Nos. 1000 and 1000–A.1 NYISO states that the redline and clean versions of its OATT and Services Tariff constitute a supplemental ministerial filing to provide redline versions of the OATT and Services Tariff sections for which the NYISO requested a revised effective date on July 2, 2014.2 Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for 1 Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities, Order No. 1000, 76 FR 49842 (Aug. 11, 2011), FERC Stats. & Regs. ¶ 31,323 (2011), order on reh’g, Order No. 1000–A, 77 FR 32184 (May 31, 2012), 139 FERC ¶ 61,132 (2012). 2 See NYISO, Compliance Filing, Docket No. ER13–102–003 (filed July 2, 2014) (requesting deferral of the effective date of January 1, 2014 for its Open Access Transmission Tariff revisions filed to comply with the requirements of Order Nos. 1000 and 1000–A). VerDate Mar<15>2010 17:46 Jul 14, 2014 Jkt 232001 review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on July 14, 2014. Dated: July 8, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–16435 Filed 7–14–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. P–12796–004–OH] City of Wadsworth, Ohio; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 Code of Federal Regulations (CFR) Part 380 (Order No. 486, 52 Federal Register [FR] 47897), the Office of Energy Projects has reviewed the application for a major original license for the 50-megawatt Robert C. Byrd Hydroelectric Project, (RC Byrd Project or project), located on the Ohio River at the U.S. Army Corps of Engineers’ (Corps) Robert C. Byrd Locks and Dam (RC Byrd Locks and Dam), approximately 12.7 miles south of the confluence of the Ohio River and the Kanawha River, 9 miles south of the Town of Gallipolis, Gallia County, Ohio, and has prepared a Draft Environmental Assessment (DEA) for the project. The proposed project would occupy 7.6 acres of federal land administered by the Corps. The DEA contains the staff’s analysis of the potential environmental impacts of the proposed project and concludes that licensing the proposed project, with appropriate environmental protective measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the DEA is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at www.ferc.gov using the ‘‘eLibrary’’ link. PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ ferc.gov or toll-free at 1–866–208–3676, or for TTY, 202–502–8659. You may also register online at www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Any comments should be filed within 30 days from the date of this notice. The Commission strongly encourages electronic filings. Please file comments using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Please affix ‘‘Project No. 12796–004’’ to all comments. For further information, contact Gaylord Hoisington by telephone at 202–502–6032 or by email at gaylord.hoisington@ferc.gov. Dated: July 8, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–16442 Filed 7–14–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 6544–003] I–MAXMAT Corporation; Ampersand Collins Hydro, LLC; Notice of Transfer of Exemption 1. By letter filed June 16, 2014, Ampersand Collins Hydro, LLC informed the Commission that the exemption from licensing for the Collins Project, FERC No. 6544, originally issued February 9, 1984,1 has been transferred to Ampersand Collins Hydro, LLC. The project is located on 1 26 FERC ¶ 62,112, Order Granting Exemption from Licensing of a Small Hydroelectric Project of 5 Megawatts or Less. E:\FR\FM\15JYN1.SGM 15JYN1 Federal Register / Vol. 79, No. 135 / Tuesday, July 15, 2014 / Notices the Chicopee River in Hampden County, Massachusetts. The transfer of an exemption does not require Commission approval. 2. Ampersand Collins Hydro, LLC is now the exemptee of the Collins Project, FERC No. 6544. All correspondence should be forwarded to: Mr. Jingdong Huang, Secretary, Ampersand Collins Hydro, LLC, 717 Atlantic Avenue, Suite 1A, Boston, MA 02111. Dated: July 8, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–16441 Filed 7–14–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER14–2290–000] mstockstill on DSK4VPTVN1PROD with NOTICES Josco Energy Corp.; Supplemental Notice That Initial Market-Based Rate Filing Includes Request For Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Josco Energy Corp.’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability, is July 29, 2014. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. VerDate Mar<15>2010 17:46 Jul 14, 2014 Jkt 232001 Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 9, 2014. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2014–16555 Filed 7–14–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER14–2325–000] Mosic Fertilizer, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Mosic Fertilizer, LLC’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability, is July 29, 2014. The Commission encourages electronic submission of protests and PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 41269 interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 9, 2014. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2014–16557 Filed 7–14–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Docket No. ER14–2382–000] ON Wind Energy LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of ON Wind Energy LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to E:\FR\FM\15JYN1.SGM 15JYN1

Agencies

[Federal Register Volume 79, Number 135 (Tuesday, July 15, 2014)]
[Notices]
[Pages 41268-41269]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-16441]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 6544-003]


I-MAXMAT Corporation; Ampersand Collins Hydro, LLC; Notice of 
Transfer of Exemption

    1. By letter filed June 16, 2014, Ampersand Collins Hydro, LLC 
informed the Commission that the exemption from licensing for the 
Collins Project, FERC No. 6544, originally issued February 9, 1984,\1\ 
has been transferred to Ampersand Collins Hydro, LLC. The project is 
located on

[[Page 41269]]

the Chicopee River in Hampden County, Massachusetts. The transfer of an 
exemption does not require Commission approval.
---------------------------------------------------------------------------

    \1\ 26 FERC ] 62,112, Order Granting Exemption from Licensing of 
a Small Hydroelectric Project of 5 Megawatts or Less.
---------------------------------------------------------------------------

    2. Ampersand Collins Hydro, LLC is now the exemptee of the Collins 
Project, FERC No. 6544. All correspondence should be forwarded to: Mr. 
Jingdong Huang, Secretary, Ampersand Collins Hydro, LLC, 717 Atlantic 
Avenue, Suite 1A, Boston, MA 02111.

    Dated: July 8, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-16441 Filed 7-14-14; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.