Roaring Springs Ranch; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 40750-40751 [2014-16346]
Download as PDF
40750
Federal Register / Vol. 79, No. 134 / Monday, July 14, 2014 / Notices
Division of Hydropower Licensing
approved Spartanburg Water System’s
request to use the Traditional Licensing
Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402; and NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920. We are
also initiating consultation with the
South Carolina State Historic
Preservation Officer, as required by
section 106, National Historical
Preservation Act, and the implementing
regulations of the Advisory Council on
Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Spartanburg Water System as the
Commission’s non-federal
representative for carrying out informal
consultation pursuant to section 7 of the
Endangered Species Act and section
305(b) of the Magnuson-Stevens Fishery
Conservation and Management Act; and
consultation pursuant to section 106 of
the National Historic Preservation Act.
m. Spartanburg Water System filed a
Pre-Application Document (PAD;
including a proposed process plan and
schedule) with the Commission,
pursuant to 18 CFR 5.6 of the
Commission’s regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
o. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: July 7, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–16348 Filed 7–11–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD14–21–000]
construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act, as
amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The Three Mile
Hydropower Project would utilize a
newly constructed agricultural water
distribution system at the Roaring
Springs Ranch in Harney County,
Oregon.
Applicant Contact: Darryl Anderson,
Anderson Engineering & Surveying,
Inc., 17681 Highway 395, Lakeview, OR
97630, Phone No. (541) 947–4407.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A new 12foot-wide by 12-foot-long powerhouse;
(2) one proposed 10.5-kilowatt turbine/
generating unit; and (3) appurtenant
facilities.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
Roaring Springs Ranch; Notice of
Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On June 23, 2014, Roaring Springs
Ranch filed a notice of intent to
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ........
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water
for agricultural, municipal, or industrial consumption and not primarily for the
generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a nonfederally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts ................
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Y
FPA 30(a)(3)(C)(i), as amended by HREA ....
mstockstill on DSK4VPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended by HREA ....
FPA 30(a)(3)(C)(iii), as amended by HREA ...
Preliminary Determination: Based
upon the above criteria, Commission
staff preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility
not required to be licensed or exempted
from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
VerDate Mar<15>2010
19:25 Jul 11, 2014
Jkt 232001
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
Y
Y
Y
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
E:\FR\FM\14JYN1.SGM
14JYN1
Federal Register / Vol. 79, No. 134 / Monday, July 14, 2014 / Notices
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the Web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (e.g., CD14–21) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Dated: July 7, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–16346 Filed 7–11–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD14–22–000]
Roaring Springs Ranch; Notice of
Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
40751
construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act, as
amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The Roaring Springs
Headquarters Hydropower Project
would utilize a newly constructed
agricultural water distribution system at
the Roaring Springs Ranch in Harney
County, Oregon.
Applicant Contact: Darryl Anderson,
Anderson Engineering & Surveying,
Inc., 17681 Highway 395, Lakeview, OR
97630, Phone No. (541) 947–4407.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A new 14foot-wide by 17-foot-long powerhouse;
(2) one proposed 37-kilowatt turbine/
generating unit; and (3) appurtenant
facilities.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
On June 23, 2014, Roaring Springs
Ranch filed a notice of intent to
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ........
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water
for agricultural, municipal, or industrial consumption and not primarily for the
generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a nonfederally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts ................
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Y
FPA 30(a)(3)(C)(i), as amended by HREA ....
mstockstill on DSK4VPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended by HREA ....
FPA 30(a)(3)(C)(iii), as amended by HREA ...
Preliminary Determination: Based
upon the above criteria, Commission
staff preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility
not required to be licensed or exempted
from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
1 18
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
CFR 385.2001–2005 (2013).
VerDate Mar<15>2010
19:25 Jul 11, 2014
1 18
Jkt 232001
PO 00000
Fmt 4703
Sfmt 4703
Y
Y
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
CFR 385.2001–2005 (2013).
Frm 00047
Y
E:\FR\FM\14JYN1.SGM
14JYN1
Agencies
[Federal Register Volume 79, Number 134 (Monday, July 14, 2014)]
[Notices]
[Pages 40750-40751]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-16346]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD14-21-000]
Roaring Springs Ranch; Notice of Preliminary Determination of a
Qualifying Conduit Hydropower Facility and Soliciting Comments and
Motions To Intervene
On June 23, 2014, Roaring Springs Ranch filed a notice of intent to
construct a qualifying conduit hydropower facility, pursuant to section
30 of the Federal Power Act, as amended by section 4 of the Hydropower
Regulatory Efficiency Act of 2013 (HREA). The Three Mile Hydropower
Project would utilize a newly constructed agricultural water
distribution system at the Roaring Springs Ranch in Harney County,
Oregon.
Applicant Contact: Darryl Anderson, Anderson Engineering &
Surveying, Inc., 17681 Highway 395, Lakeview, OR 97630, Phone No. (541)
947-4407.
FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) A new 12-foot-wide by 12-foot-long
powerhouse; (2) one proposed 10.5-kilowatt turbine/generating unit; and
(3) appurtenant facilities.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all of the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
Satisfies (Y/
Statutory provision Description N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by The conduit the facility Y
HREA. uses is a tunnel,
canal, pipeline,
aqueduct, flume, ditch,
or similar manmade
water conveyance that
is operated for the
distribution of water
for agricultural,
municipal, or
industrial consumption
and not primarily for
the generation of
electricity.
FPA 30(a)(3)(C)(i), as amended The facility is Y
by HREA. constructed, operated,
or maintained for the
generation of electric
power and uses for such
generation only the
hydroelectric potential
of a non-federally
owned conduit.
FPA 30(a)(3)(C)(ii), as amended The facility has an Y
by HREA. installed capacity that
does not exceed 5
megawatts.
FPA 30(a)(3)(C)(iii), as amended On or before August 9, Y
by HREA. 2013, the facility is
not licensed, or
exempted from the
licensing requirements
of Part I of the FPA.
------------------------------------------------------------------------
Preliminary Determination: Based upon the above criteria,
Commission staff preliminarily determines that the proposal satisfies
the requirements for a qualifying conduit hydropower facility not
required to be licensed or exempted from licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 45
days from the issuance date of this notice.
Deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the
[[Page 40751]]
filing responds; (3) state the name, address, and telephone number of
the person filing; and (4) otherwise comply with the requirements of
sections 385.2001 through 385.2005 of the Commission's regulations.\1\
All comments contesting Commission staff's preliminary determination
that the facility meets the qualifying criteria must set forth their
evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2013).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. A copy of all other filings in
reference to this application must be accompanied by proof of service
on all persons listed in the service list prepared by the Commission in
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Locations of Notice of Intent: Copies of the notice of intent can
be obtained directly from the applicant or such copies can be viewed
and reproduced at the Commission in its Public Reference Room, Room 2A,
888 First Street NE., Washington, DC 20426. The filing may also be
viewed on the Web at https://www.ferc.gov/docs-filing/elibrary.asp using
the ``eLibrary'' link. Enter the docket number (e.g., CD14-21) in the
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY, call
(202) 502-8659.
Dated: July 7, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-16346 Filed 7-11-14; 8:45 am]