Hot Springs to Anaconda Transmission Line Rebuild Project, 40094-40095 [2014-16243]
Download as PDF
40094
Federal Register / Vol. 79, No. 133 / Friday, July 11, 2014 / Notices
explanation of the competitive injury to
the submitting person which would
result from public disclosure; (6) when
such information might lose its
confidential character due to the
passage of time; and (7) why disclosure
of the information would be contrary to
the public interest. It is DOE’s policy
that all comments may be included in
the public docket, without change and
as received, including any personal
information provided in the comments
(except information deemed to be
exempt from public disclosure).
Issued in Washington, DC, on July 8, 2014.
Michele Torrusio,
QER Secretariat, QER Interagency Task Force,
U.S. Department of Energy.
[FR Doc. 2014–16241 Filed 7–10–14; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Bonneville Power Administration
Hot Springs to Anaconda
Transmission Line Rebuild Project
Bonneville Power
Administration (BPA), Department of
Energy (DOE). ACTION: Notice of intent
to prepare an Environmental Impact
Statement (EIS) and notice of floodplain
and wetland assessment.
SUMMARY: In accordance with the
National Environmental Policy Act
(NEPA), BPA intends to prepare an EIS
on its proposed rebuild of
approximately 120 miles of existing
230-kiliovolt (kV) wood-pole
transmission line that runs through
Sanders, Lake, Missoula, Granite,
Powell, and Deer Lodge counties,
Montana. The deteriorated condition of
the more than 60-year-old line
compromises BPA’s ability to maintain
reliable electric service, and poses a
safety risk to the public and
maintenance crews.
With this notice, BPA is initiating the
public scoping process for the EIS and
is requesting comments about the
potential environmental impacts it
should consider as it prepares the EIS
for the proposed project. In accordance
with DOE regulations for compliance
with floodplain and wetland
environmental review requirements,
BPA will prepare a floodplain and
wetlands assessment that identifies,
evaluates, and as appropriate,
implements actions to avoid or
minimize potential harm to or within
any affected floodplains and wetlands.
The assessment will be included in the
EIS.
DATES: Written comments are due to the
address below by August 12, 2014.
tkelley on DSK3SPTVN1PROD with NOTICES
AGENCY:
VerDate Mar<15>2010
20:23 Jul 10, 2014
Jkt 232001
Comments may also be made at three
EIS scoping meetings to be held on the
29th, 30th, and 31st of July, 2014 at the
addresses below.
ADDRESSES: Comments and suggestions
on the proposed scope of the Draft EIS
for this project and requests to be placed
on the project mailing list may be
mailed by letter to Bonneville Power
Administration, Public Affairs—DKC–7,
P.O. Box 14428, Portland, OR 97292–
4428. Or you may FAX them to 503–
230–3285; submit them on-line at
www.bpa.gov/comment; or email them
to comment@bpa.gov. Scoping meetings
will be held in Montana from 4:00 p.m.
to 7:00 p.m. at the following locations:
July 29, 2014 at the Missoula Fire
Department, Station 4, 3011 Latimor
Street, Missoula; on July 30, 2014 at the
Dixon Senior Citizens Center, 106 3rd
Street, Dixon; and on July 31, 2014 at
the William K. Kohrs Memorial Library,
501 Missouri Avenue, Deer Lodge. At
these informal, open-house meetings,
BPA will provide project information
and maps. Members of the project team
will be available to answer questions
and accept verbal and written
comments.
FOR FURTHER INFORMATION CONTACT:
Doug Corkran, Environmental
Coordinator, Bonneville Power
Administration—KEC–4, P.O. Box 3621,
Portland, Oregon, 97208–3621; toll-free
telephone number 1–800–622–4519;
direct number 503–230–7646; fax
number 503–230–5699; or email at
dfcorkran@bpa.gov. You may also
contact Chad Hamel, Project Manager,
Bonneville Power Administration—
TEP–TPP–1, P.O. Box 3621, Portland,
Oregon, 97208–3621; toll-free telephone
1–800–622–4519; direct telephone 360–
619–6557; or email cjhamel@bpa.gov.
Additional information can be found at
the project Web site: www.bpa.gov/goto/
HotSpringsAnaconda.
SUPPLEMENTARY INFORMATION: BPA
proposes to rebuild three existing woodpole transmission lines—the Hot
Springs-Rattlesnake, RattlesnakeGarrison, and Garrison-Anaconda
lines—that run consecutively from Hot
Springs, Montana to Anaconda,
Montana. No major work has been done
on the lines since they were built in
1952. Many of the structures, the
electric wire (conductor), and associated
structural components (cross arms,
insulators, and dampers) are physically
worn and structurally unsound in
places. The wood transmission poles
have lasted beyond the expected 55 to
60 years and now need to be replaced
due to age, rot, and deterioration.
Rebuilding the deteriorated line would
maintain reliable electrical service and
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
avoid risks to the safety of the public
and maintenance crews.
The project would include removing
and replacing existing wood-pole
structures and components, as well as
the conductor; improving access roads
and establishing temporary access
where needed; removing trees adjacent
to the line that may cause a threat to
reliability; developing temporary staging
areas for storage of project materials;
and revegetating areas disturbed by
construction activities. The existing
structures would be replaced with
structures of similar design within or
near to their existing locations. The line
would continue to operate at 230 kV.
Proposed activities would also
include the installation of new line
disconnect switches at the Hot Springs
and Garrison substations, and upgrading
the existing fiber optic line that is
attached to the Hot Springs-Rattlesnake
and Rattlesnake-Garrison transmission
line structures.
Alternatives Proposed for
Consideration: In addition to the
Proposed Action, BPA will evaluate the
No Action Alternative as well as any
additional viable alternatives brought
forward during the scoping process.
Under the No Action Alternative, BPA
would not rebuild the line and would
make repairs on an as-needed or
emergency basis.
Public Participation and
Identification of Environmental Issues:
The potential environmental issues
identified for most transmission line
projects include land use, cultural
resources, visual impacts, sensitive
plants and animals, erosion/soils,
wetlands, floodplains, and fish and
water resources. The existing lines cross
about 50 miles of the Flathead Indian
Reservation, small portions of the Lolo
and Beaverhead-Deer Lodge National
Forests, several miles of State land, as
well as private land.
BPA has established a 30-day scoping
period during which affected
landowners, concerned citizens, special
interest groups, local governments, and
any other interested parties are invited
to comment on the scope of the
proposed EIS. Scoping will help BPA
ensure that a full range of issues related
to this proposal is addressed in the EIS,
and also help identify significant or
potentially significant impacts that may
result from the proposed project. When
completed, the Draft EIS will be
circulated for review and comment, and
BPA will hold at least one public
comment meeting for the Draft EIS. BPA
will consider and respond in the Final
EIS to comments received on the Draft
EIS. BPA’s subsequent decision will be
documented in a Record of Decision.
E:\FR\FM\11JYN1.SGM
11JYN1
Federal Register / Vol. 79, No. 133 / Friday, July 11, 2014 / Notices
Issued in Portland, Oregon, on June 19,
2014.
Elliot Mainzer,
Administrator and Chief Executive Officer.
[FR Doc. 2014–16243 Filed 7–10–14; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP14–504–000; PF14–3–000]
tkelley on DSK3SPTVN1PROD with NOTICES
Transcontinental Gas Pipe Line
Company, LLC; Notice of Application
Take notice that on June 23, 2014,
Transcontinental Gas Pipe Line
Company LLC (Transco), 2800 Post Oak
Boulevard, Houston, Texas 77056, filed
in the above referenced docket an
application pursuant to section 7(c) of
the Natural Gas Act (NGA), and Part 157
of the Commission’s regulations
requesting authorization to construct
and operate the Rock Springs Expansion
Project (Project), all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection. The filing is available
for review at the Commission in the
Public Reference Room or may be
viewed on the Commission’s Web site
web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application may be directed to Bill
Hammons, P.O. Box 1396, Houston,
Texas 77251, by telephone at (713) 215–
2130.
Specifically, the Project consists of
approximately 11.17 miles, 20-inch
diameter pipeline lateral, a 4,000
horsepower compression station, and
appurtenant facilities in Lancaster
County, Pennsylvania and Cecil County,
Maryland. Transco has executed a
binding precedent agreement with
ODEC for 100% of the capacity. The
Project will enable Transco to provide
192 million cubic feet per day of
incremental firm transportation capacity
from Transco’s Station 210 Zone 6 Pool
in Mercer County, New Jersey to Old
Dominion Electric Cooperative’s (ODEC)
proposed Wildcat Point Generating
Facility in Cecil County, Maryland.
Transco proposes that the firm
transportation service will be rendered
pursuant to Rate Schedule FT of
Transco’s FERC Gas Tariff and Transco’s
VerDate Mar<15>2010
20:23 Jul 10, 2014
Jkt 232001
blanket certificate under Part 284 (G) of
the Commission’s regulations. The
approximate cost for the Project is
$79,476,150.
On October 16, 2013, the Commission
staff granted Transco’s request to utilize
the Pre-Filing Process and assigned
Docket No. PF14–3–000 to staff
activities involved in the Project. Now,
as of the filing of the June 23, 2014
application, the Pre-Filing Process for
this project has ended. From this time
forward, this proceeding will be
conducted in Docket No. CP14–504–
000, as noted in the caption of this
Notice.
Pursuant to section 157.9 of the
Commission’s rules (18 CFR 157.9),
within 90 days of this Notice, the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
seven copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
PO 00000
Frm 00038
Fmt 4703
Sfmt 9990
40095
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 7 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on July 24, 2014.
Dated: July 3, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–16194 Filed 7–10–14; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\11JYN1.SGM
11JYN1
Agencies
[Federal Register Volume 79, Number 133 (Friday, July 11, 2014)]
[Notices]
[Pages 40094-40095]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-16243]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Bonneville Power Administration
Hot Springs to Anaconda Transmission Line Rebuild Project
AGENCY: Bonneville Power Administration (BPA), Department of Energy
(DOE). ACTION: Notice of intent to prepare an Environmental Impact
Statement (EIS) and notice of floodplain and wetland assessment.
SUMMARY: In accordance with the National Environmental Policy Act
(NEPA), BPA intends to prepare an EIS on its proposed rebuild of
approximately 120 miles of existing 230-kiliovolt (kV) wood-pole
transmission line that runs through Sanders, Lake, Missoula, Granite,
Powell, and Deer Lodge counties, Montana. The deteriorated condition of
the more than 60-year-old line compromises BPA's ability to maintain
reliable electric service, and poses a safety risk to the public and
maintenance crews.
With this notice, BPA is initiating the public scoping process for
the EIS and is requesting comments about the potential environmental
impacts it should consider as it prepares the EIS for the proposed
project. In accordance with DOE regulations for compliance with
floodplain and wetland environmental review requirements, BPA will
prepare a floodplain and wetlands assessment that identifies,
evaluates, and as appropriate, implements actions to avoid or minimize
potential harm to or within any affected floodplains and wetlands. The
assessment will be included in the EIS.
DATES: Written comments are due to the address below by August 12,
2014. Comments may also be made at three EIS scoping meetings to be
held on the 29th, 30th, and 31st of July, 2014 at the addresses below.
ADDRESSES: Comments and suggestions on the proposed scope of the Draft
EIS for this project and requests to be placed on the project mailing
list may be mailed by letter to Bonneville Power Administration, Public
Affairs--DKC-7, P.O. Box 14428, Portland, OR 97292-4428. Or you may FAX
them to 503-230-3285; submit them on-line at www.bpa.gov/comment; or
email them to comment@bpa.gov. Scoping meetings will be held in Montana
from 4:00 p.m. to 7:00 p.m. at the following locations: July 29, 2014
at the Missoula Fire Department, Station 4, 3011 Latimor Street,
Missoula; on July 30, 2014 at the Dixon Senior Citizens Center, 106 3rd
Street, Dixon; and on July 31, 2014 at the William K. Kohrs Memorial
Library, 501 Missouri Avenue, Deer Lodge. At these informal, open-house
meetings, BPA will provide project information and maps. Members of the
project team will be available to answer questions and accept verbal
and written comments.
FOR FURTHER INFORMATION CONTACT: Doug Corkran, Environmental
Coordinator, Bonneville Power Administration--KEC-4, P.O. Box 3621,
Portland, Oregon, 97208-3621; toll-free telephone number 1-800-622-
4519; direct number 503-230-7646; fax number 503-230-5699; or email at
dfcorkran@bpa.gov. You may also contact Chad Hamel, Project Manager,
Bonneville Power Administration--TEP-TPP-1, P.O. Box 3621, Portland,
Oregon, 97208-3621; toll-free telephone 1-800-622-4519; direct
telephone 360-619-6557; or email cjhamel@bpa.gov. Additional
information can be found at the project Web site: www.bpa.gov/goto/HotSpringsAnaconda.
SUPPLEMENTARY INFORMATION: BPA proposes to rebuild three existing wood-
pole transmission lines--the Hot Springs-Rattlesnake, Rattlesnake-
Garrison, and Garrison-Anaconda lines--that run consecutively from Hot
Springs, Montana to Anaconda, Montana. No major work has been done on
the lines since they were built in 1952. Many of the structures, the
electric wire (conductor), and associated structural components (cross
arms, insulators, and dampers) are physically worn and structurally
unsound in places. The wood transmission poles have lasted beyond the
expected 55 to 60 years and now need to be replaced due to age, rot,
and deterioration. Rebuilding the deteriorated line would maintain
reliable electrical service and avoid risks to the safety of the public
and maintenance crews.
The project would include removing and replacing existing wood-pole
structures and components, as well as the conductor; improving access
roads and establishing temporary access where needed; removing trees
adjacent to the line that may cause a threat to reliability; developing
temporary staging areas for storage of project materials; and
revegetating areas disturbed by construction activities. The existing
structures would be replaced with structures of similar design within
or near to their existing locations. The line would continue to operate
at 230 kV.
Proposed activities would also include the installation of new line
disconnect switches at the Hot Springs and Garrison substations, and
upgrading the existing fiber optic line that is attached to the Hot
Springs-Rattlesnake and Rattlesnake-Garrison transmission line
structures.
Alternatives Proposed for Consideration: In addition to the
Proposed Action, BPA will evaluate the No Action Alternative as well as
any additional viable alternatives brought forward during the scoping
process. Under the No Action Alternative, BPA would not rebuild the
line and would make repairs on an as-needed or emergency basis.
Public Participation and Identification of Environmental Issues:
The potential environmental issues identified for most transmission
line projects include land use, cultural resources, visual impacts,
sensitive plants and animals, erosion/soils, wetlands, floodplains, and
fish and water resources. The existing lines cross about 50 miles of
the Flathead Indian Reservation, small portions of the Lolo and
Beaverhead-Deer Lodge National Forests, several miles of State land, as
well as private land.
BPA has established a 30-day scoping period during which affected
landowners, concerned citizens, special interest groups, local
governments, and any other interested parties are invited to comment on
the scope of the proposed EIS. Scoping will help BPA ensure that a full
range of issues related to this proposal is addressed in the EIS, and
also help identify significant or potentially significant impacts that
may result from the proposed project. When completed, the Draft EIS
will be circulated for review and comment, and BPA will hold at least
one public comment meeting for the Draft EIS. BPA will consider and
respond in the Final EIS to comments received on the Draft EIS. BPA's
subsequent decision will be documented in a Record of Decision.
[[Page 40095]]
Issued in Portland, Oregon, on June 19, 2014.
Elliot Mainzer,
Administrator and Chief Executive Officer.
[FR Doc. 2014-16243 Filed 7-10-14; 8:45 am]
BILLING CODE 6450-01-P