LoneStar Wind Power Company, NorthStar Wind Power Company, WindStar Power Company, v. South Texas Electric Co-Operative; Notice of Amended Petition For Enforcement, 40096-40097 [2014-16197]
Download as PDF
40096
Federal Register / Vol. 79, No. 133 / Friday, July 11, 2014 / Notices
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on July 21, 2014.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL14–80–000]
tkelley on DSK3SPTVN1PROD with NOTICES
Calpine Construction Finance
Company, L.P. v. Tampa Electric
Company; Notice of Complaint
Take notice that on July 1, 2014,
pursuant to Rule 206 of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.206 and sections
206 and 306 of the Federal Power Act,
16 U.S.C. 824(e) and 825(e), Calpine
Construction Finance Company, L.P.
(Complainant or CCFC) filed a formal
complaint against Tampa Electric
Company (Respondent or TECO)
requesting that the Commission order
TECO to permit CCFC to defer the
commencement of service under the
transmission service agreement between
CCFC and TECO pursuant to section
17.7 of TECO’s Open Access
Transmission Tariff.
CCFC certifies that copies of the
complaint were served on the contacts
for the TECO as listed on the
Commission’s list of Corporate Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
VerDate Mar<15>2010
20:23 Jul 10, 2014
Jkt 232001
Dated: July 2, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–16198 Filed 7–10–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER13–102–003]
New York Independent System
Operator, Inc.; Notice of Compliance
Filing
Take notice that on July 2, 2014, New
York Independent System Operator, Inc.
(NYISO) submitted a compliance filing
requesting deferral of the effective date
of January 1, 2014 for its Open Access
Transmission Tariff revisions filed to
comply with the requirements of Order
Nos. 1000 and 1000–A.1 NYISO requests
that the Commission immediately issue
a notice providing for a shortened
comment period, so as not to delay
Commission action in underlying
proceedings.
We grant NYISO’s request for
shortened comment period, with
comments due on July 14, 2014. Any
person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
1 Transmission Planning and Cost Allocation by
Transmission Owning and Operating Public
Utilities, Order No. 1000, 76 FR 49,842 (Aug. 11,
2011), FERC Stats. & Regs. ¶ 31,323 (2011), order
on reh’g, Order No. 1000–A, 77 FR. 32,184 (May 31,
2012), 139 FERC ¶ 61,132 (2012).
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on July 14, 2014.2
Dated: July 3, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–16199 Filed 7–10–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL14–56–000]
LoneStar Wind Power Company,
NorthStar Wind Power Company,
WindStar Power Company, v. South
Texas Electric Co-Operative; Notice of
Amended Petition For Enforcement
Take notice that on June 30, 2014,
LoneStar Wind Power Company,
NorthStar Wind Power Company, and
WindStar Power Company filed an
amended petition supplementing its
request, originally filed on May 27,
2014, for the Federal Energy Regulatory
Commission (Commission) to exercise
its authority and initiate enforcement
action against the South Texas Electric
Co-Operative to ensure that PURPA
regulations are properly and lawfully
implemented.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
2 This notice is not being issued in response to
any motion for extension of time for the submission
of interventions or protests. Specific motions for
extension of time will be addressed separately.
E:\FR\FM\11JYN1.SGM
11JYN1
Federal Register / Vol. 79, No. 133 / Friday, July 11, 2014 / Notices
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on July 21, 2014.
Dated: July 3, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–16197 Filed 7–10–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 619–158]
tkelley on DSK3SPTVN1PROD with NOTICES
Pacific Gas and Electric Company and
the City of Santa Clara; Notice of
Environmental Site Review
On Monday, August 4, 2014, the
Federal Energy Regulatory Commission
(Commission) staff and the Pacific Gas
and Electric Company and the City of
Santa Clara (licensees) will conduct an
environmental site review of the Bucks
Creek Hydropower Project. The project
is located on Bucks, Grizzly, and Milk
Ranch Creeks in Plumas County,
California.
The site review is open to the public
and resource agencies and will occur
from 9:00 a.m. to about 4:00 p.m.
(Pacific Daylight Time). The following
itinerary provides general guidance only
and the specific itinerary including
approximate times may change.
VerDate Mar<15>2010
20:23 Jul 10, 2014
Jkt 232001
9:00 a.m. Meet at Bucks Lakeshore
Resort [16001 Bucks Lake Rd.,
Quincy, CA 95971, (530) 283–2848]
• Safety briefing
• Project overview
9:30 a.m. Bucks Lake Recreation
Features and Dam
• All recreation features in license
• Bucks storage dam
Noon Lunch (bring your own)
12:45 p.m. Lower Bucks Lake
Recreation Features and Dam
• All recreation features in license,
and view Lower Bucks dam from
nearest recreation facility
• At Grizzly intake tower, show
pictures of Three Lakes, the road to
Three Lakes dam, and Milk Ranch
conduit (not visiting these sites due
to long distance, treacherous road
conditions without specialized
vehicle, and visitor safety)
2:00 p.m. Grizzly Forebay Features
• En route, stop at Grizzly
powerhouse tunnel portal and view
Grizzly penstock
• All recreation features in license,
and view Grizzly forebay dam from
nearest recreation facility
• Show pictures of Grizzly and Bucks
powerhouses, Bucks penstock and
other features (not visiting these
sites due to specialized personal
protective gear requirements and
visitor safety)
4:00 p.m. Finish at Bucks Lakeshore
Resort
To better support the safety of the
group, participants will be requested to
car pool in vehicles provided by the
licensees. Participants are asked not to
attempt to join the site review after it
departs the initial meeting location.
Participants must wear appropriate
footwear (i.e., no sandals or open-toed
shoes). Some brief walking over dirt
trails may be needed.
To appropriately accommodate
persons interested in attending the site
tour, participants must contact Alan
Mitchnick, FERC Team Leader, at (202)
502–6074 or alan.mitchnick@ferc.gov,
no later than Monday, July 28, 2014.
Dated: July 2, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–16200 Filed 7–10–14; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
40097
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–512–000]
Enbridge Offshore Facilities, LLC;
Notice of Petition for Declaratory Order
Take notice that on July 1, 2014,
Enbridge Offshore Facilities, LLC (EOF)
pursuant to Rule 207(a)(2) of the Federal
Energy Regulatory Commission’s Rules
of Practice and Procedure, 18 CFR
385.207(a)(2) (2013), filed a petition for
declaratory order requesting that the
Commission confirm that the proposed
EOF facilities and Gas Delivery Line
described in this petition, will not be
engaged in the transportation of natural
gas subject to the Commission’s
jurisdiction under the Natural Gas Act,
15 U.S.C. 717, et seq.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on July 15, 2014
E:\FR\FM\11JYN1.SGM
11JYN1
Agencies
[Federal Register Volume 79, Number 133 (Friday, July 11, 2014)]
[Notices]
[Pages 40096-40097]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-16197]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL14-56-000]
LoneStar Wind Power Company, NorthStar Wind Power Company,
WindStar Power Company, v. South Texas Electric Co-Operative; Notice of
Amended Petition For Enforcement
Take notice that on June 30, 2014, LoneStar Wind Power Company,
NorthStar Wind Power Company, and WindStar Power Company filed an
amended petition supplementing its request, originally filed on May 27,
2014, for the Federal Energy Regulatory Commission (Commission) to
exercise its authority and initiate enforcement action against the
South Texas Electric Co-Operative to ensure that PURPA regulations are
properly and lawfully implemented.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to
[[Page 40097]]
become a party must file a notice of intervention or motion to
intervene, as appropriate. Such notices, motions, or protests must be
filed on or before the comment date. On or before the comment date, it
is not necessary to serve motions to intervene or protests on persons
other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on July 21, 2014.
Dated: July 3, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-16197 Filed 7-10-14; 8:45 am]
BILLING CODE 6717-01-P