Texas Eastern Transmission, LP; Notice of Request Under Blanket Authorization, 38287-38288 [2014-15699]
Download as PDF
Federal Register / Vol. 79, No. 129 / Monday, July 7, 2014 / Notices
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on July 14, 2014.
Dated: June 27, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–15700 Filed 7–3–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
inadvertently failed to file its QF selfcertification with the Commission.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on July 28, 2014.
Dated: June 27, 2014.
Kimberly D. Bose,
Secretary.
Federal Energy Regulatory
Commission
[FR Doc. 2014–15701 Filed 7–3–14; 8:45 am]
BILLING CODE 6717–01–P
Notice of Petition for Declaratory
Order; Beaver Falls Municipal
Authority
mstockstill on DSK4VPTVN1PROD with NOTICES
[Docket Nos. EL14–78–000; QF14–91–001]
DEPARTMENT OF ENERGY
Take notice that on June 26, 2014,
pursuant to Rule 207 of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.207(a)(2), Beaver
Falls Municipal Authority (BFMA) filed
a petition for declaratory order seeking
limited waiver of the Commission’s
small power production qualifying (QF)
filing regulations set forth in 18 CFR
292.203(a)(3) from March 17, 2006 to
November 15, 2003 when BFMA
VerDate Mar<15>2010
15:59 Jul 03, 2014
Jkt 232001
Federal Energy Regulatory
Commission
[Docket No. CP14–507–000]
Texas Eastern Transmission, LP;
Notice of Request Under Blanket
Authorization
Take notice that on June 25, 2014,
Texas Eastern Transmission, LP (Texas
Eastern), 5400 Westheimer Court,
Houston, Texas 77056–5310, filed a
prior notice application pursuant to
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
38287
section 7(b) of the Natural Gas Act
(NGA) and sections 157.205 and
157.216 of the Federal Energy
Regulatory Commission’s (Commission)
regulations under the NGA, and Texas
Eastern’s blanket certificate issued in
Docket No. CP82–535–000, for
authorization to abandon certain
inactive supply laterals located in
offshore federal waters in the Gulf of
Mexico near Louisiana. Specifically,
Texas Eastern proposes to abandon in
place approximately 5.2 miles of 12inch diameter pipeline (Line 40–B–3–
B), all as more fully set forth in the
application, which is open to the public
for inspection. The filing may also be
viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Lisa
A. Connolly, General Manager, Rates &
Certificates, Texas Eastern
Transmission, LP, P.O. Box 1642,
Houston, Texas 77251–1642, or phone
(713) 627–4102 or fax (713) 627–5947 or
by email laconnolly@spectraenergy.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
E:\FR\FM\07JYN1.SGM
07JYN1
38288
Federal Register / Vol. 79, No. 129 / Monday, July 7, 2014 / Notices
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenter will
not receive copies of all documents filed
by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Dated: June 27, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–15699 Filed 7–3–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–502–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Columbia Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization
Take notice that on June 17, 2014,
Columbia Gas Transmission, LLC
(Columbia), 5151 San Felipe, Suite
2500, Houston, TX 77056, filed a prior
notice application pursuant to section
7(b) of the Natural Gas Act (NGA) and
sections 157.205 and 157.216 of the
Federal Energy Regulatory
VerDate Mar<15>2010
15:59 Jul 03, 2014
Jkt 232001
Commission’s (Commission) regulations
under the NGA, and Columbia’s blanket
certificate issued in Docket No. CP83–
76–000, for authorization to abandon by
removal four compressor units and
various appurtenant facilities and
structures at Huff Creek Compressor
Station situated in Wyoming County,
West Virginia, all as more fully set forth
in the application, which is open to the
public for inspection. The filing may
also be viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to
Fredric J. George, Senior Counsel,
Columbia Gas Transmission, LLC, P.O.
Box 1273, Charleston, West Virginia
25325–1273, or phone (304) 357–2359
or fax (304) 357–3206 or by email
fgeorge@nisource.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenter will
not receive copies of all documents filed
by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Dated: June 27, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–15698 Filed 7–3–14; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPPT–2014–0381; FRL–9911–22]
Certain New Chemicals; Receipt and
Status Information
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
EPA is required under the
Toxic Substances Control Act (TSCA) to
publish in the Federal Register a notice
of receipt of a premanufacture notice
(PMN); an application for a test
marketing exemption (TME), both
pending and/or expired; and a periodic
status report on any new chemicals
under EPA review and the receipt of
notices of commencement (NOC) to
manufacture those chemicals. This
document covers the period from May
23, 2013 to September 30, 2013.
SUMMARY:
E:\FR\FM\07JYN1.SGM
07JYN1
Agencies
[Federal Register Volume 79, Number 129 (Monday, July 7, 2014)]
[Notices]
[Pages 38287-38288]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-15699]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP14-507-000]
Texas Eastern Transmission, LP; Notice of Request Under Blanket
Authorization
Take notice that on June 25, 2014, Texas Eastern Transmission, LP
(Texas Eastern), 5400 Westheimer Court, Houston, Texas 77056-5310,
filed a prior notice application pursuant to section 7(b) of the
Natural Gas Act (NGA) and sections 157.205 and 157.216 of the Federal
Energy Regulatory Commission's (Commission) regulations under the NGA,
and Texas Eastern's blanket certificate issued in Docket No. CP82-535-
000, for authorization to abandon certain inactive supply laterals
located in offshore federal waters in the Gulf of Mexico near
Louisiana. Specifically, Texas Eastern proposes to abandon in place
approximately 5.2 miles of 12-inch diameter pipeline (Line 40-B-3-B),
all as more fully set forth in the application, which is open to the
public for inspection. The filing may also be viewed on the Web at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY,
(202) 502-8659.
Any questions regarding this application should be directed to Lisa
A. Connolly, General Manager, Rates & Certificates, Texas Eastern
Transmission, LP, P.O. Box 1642, Houston, Texas 77251-1642, or phone
(713) 627-4102 or fax (713) 627-5947 or by email
laconnolly@spectraenergy.com.
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding, or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the
[[Page 38288]]
EA in the Commission's public record for this proceeding or the
issuance of a Notice of Schedule for Environmental Review will serve to
notify federal and state agencies of the timing for the completion of
all necessary reviews, and the subsequent need to complete all federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenters will not be required to serve copies of filed
documents on all other parties. However, the non-party commenter will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 5 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
Dated: June 27, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-15699 Filed 7-3-14; 8:45 am]
BILLING CODE 6717-01-P