Regulatory Treatment of Non-Safety Systems for Passive Advanced Light Water Reactors, 37782-37783 [2014-15572]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
37782
Federal Register / Vol. 79, No. 127 / Wednesday, July 2, 2014 / Notices
information requested includes the
name of the Office Director/Regional
Administrator or Chairman, as
appropriate, the traveler’s identifying
information, purpose of travel, listing of
the trip coordinators, other NRC’s
travelers and contractors attending the
same meeting, and a proposed itinerary.
Revisions to NRC’s Management
Directives 14.1 and 5.13 require each
traveler to obtain a briefing on the most
recent status of the threat environment
prior to travel, and to requisition
government issued communication
devices such as cell phones and laptops
for use while travelling. These and other
procedural changes necessitated a
redesign of NRC Form 445.
Submit, by September 2, 2014,
comments that address the following
questions:
1. Is the proposed collection of
information necessary for the NRC to
properly perform its functions? Does the
information have practical utility?
2. Is the burden estimate accurate?
3. Is there a way to enhance the
quality, utility, and clarity of the
information to be collected?
4. How can the burden of the
information collection be minimized,
including the use of automated
collection techniques or other forms of
information technology?
The public may examine and have
copied for a fee, publicly-available
documents, including the draft
supporting statement, at the NRC’s
Public Document Room, Room O–1F21,
One White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852. The
OMB clearance requests are available at
the NRC’s Web site: https://www.nrc.gov/
public-involve/doc-comment/omb/. The
document will be available on the
NRC’s home page site for 60 days after
the signature date of this notice.
Comments submitted in writing or in
electronic form will be made available
for public inspection. Because your
comments will not be edited to remove
any identifying or contact information,
the NRC cautions you against including
any information in your submission that
you do not want to be publicly
disclosed. Comments submitted should
reference Docket No. NRC–2014–0105.
You may submit your comments by any
of the following methods. Electronic
comments go to https://
www.regulations.gov and search for
Docket No. NRC–2014–0105. Mail
comments to the Acting NRC Clearance
Officer, Brenda Miles (T–5 F53), U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001.
Questions about the information
collection requirements may be directed
to the Acting NRC Clearance Officer,
VerDate Mar<15>2010
17:49 Jul 01, 2014
Jkt 232001
Brenda Miles (T–5 F53), U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001; telephone: 301–415–
7884, or by email to
INFOCOLLECTS.Resource@NRC.GOV.
Dated at Rockville, Maryland, this 26th day
of June, 2014.
For the Nuclear Regulatory Commission.
Brenda Miles,
Acting NRC Clearance Officer, Office of
Information Services.
[FR Doc. 2014–15445 Filed 7–1–14; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
Advisory Committee on the Medical
Uses of Isotopes: Meeting Notice
U.S. Nuclear Regulatory
Commission.
ACTION: Notice of Meeting.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) will convene a
teleconference meeting of the Advisory
Committee on the Medical Uses of
Isotopes (ACMUI) on August 20, 2014,
to discuss the revisions to the ACMUI
bylaws. Meeting information, including
a copy of the agenda and handouts, will
be available at https://www.nrc.gov/
reading-rm/doc-collections/acmui/
meetings/2014.html. The agenda and
handouts may also be obtained by
contacting Ms. Sophie Holiday using the
information below.
DATES: The teleconference meeting will
be held on Wednesday, August 20,
2014, 1:30 p.m. to 3:00 p.m. Eastern
Daylight Time (EDT).
Public Participation: Any member of
the public who wishes to participate in
the teleconference should contact Ms.
Holiday using the contact information
below.
Contact Information: Sophie Holiday,
email: sophie.holiday@nrc.gov,
telephone: (301) 415–7865.
SUMMARY:
Conduct of the Meeting
Dr. Bruce Thomadsen, ACMUI
Chairman, will preside over the
meeting. Dr. Thomadsen will conduct
the meeting in a manner that will
facilitate the orderly conduct of
business. The following procedures
apply to public participation in the
meeting:
1. Persons who wish to provide a
written statement should submit an
electronic copy to Ms. Holiday at the
contact information listed above. All
submittals must be received by August
15, 2014, three business days prior to
the meeting, and must pertain to the
topic on the agenda for the meeting.
PO 00000
Frm 00072
Fmt 4703
Sfmt 4703
2. Questions and comments from
members of the public will be permitted
during the meetings, at the discretion of
the Chairman.
3. The draft transcript and meeting
summary will be available on ACMUI’s
Web site https://www.nrc.gov/readingrm/doc-collections/acmui/meetings/
2014.html on or about October 1, 2014.
This meeting will be held in
accordance with the Atomic Energy Act
of 1954, as amended (primarily Section
161a); the Federal Advisory Committee
Act (5 U.S.C. App); and the
Commission’s regulations in Title 10 of
the Code of Federal Regulations, Part 7.
Dated: June 26, 2014.
Andrew L. Bates,
Advisory Committee Management Officer.
[FR Doc. 2014–15575 Filed 7–1–14; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2012–0237]
Regulatory Treatment of Non-Safety
Systems for Passive Advanced Light
Water Reactors
Nuclear Regulatory
Commission.
ACTION: Standard review plan; issuance.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is issuing a final
revision to the following section of
NUREG–0800, ‘‘Standard Review Plan
for the Review of Safety Analysis
Reports for Nuclear Power Plants: LWR
Edition’’ Section 19.3, ‘‘Regulatory
Treatment of Non-Safety Systems
(RTNSS) for Passive Advanced Light
Water Reactors.’’
DATES: The effective date of this
Standard Review Plan (SRP) update is
August 1, 2014.
ADDRESSES: Please refer to Docket ID
NRC–2012–0237 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2012–0237. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–287–3422;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may access publiclySUMMARY:
E:\FR\FM\02JYN1.SGM
02JYN1
Federal Register / Vol. 79, No. 127 / Wednesday, July 2, 2014 / Notices
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The final
revision for Section 19.3, ‘‘Regulatory
Treatment of Non-Safety Systems
(RTNSS) for Passive Advanced Light
Water Reactors.’’ is available under
ADAMS Accession No ML14035A149.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville Pike
Rockville, Maryland 20852.
• The NRC posts its issued staff
guidance on the NRC’s external Web
page at https://www.nrc.gov/reading-rm/
doc-collections/nuregs/staff/sr0800/.
FOR FURTHER INFORMATION CONTACT:
Jonathan DeGange, Office of New
Reactors, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001; telephone: 301–415–6992 or
email: Jonathan.Degange@nrc.gov.
SUPPLEMENTARY INFORMATION:
mstockstill on DSK4VPTVN1PROD with NOTICES
I. Background
On October 12, 2012 (77 FR 62270)
the NRC staff published for public
comment the initial issuance of Section
19.3, ‘‘Regulatory Treatment of NonSafety Systems (RTNSS) for Passive
Advanced Light Water Reactors,’’
(ADAMS Accession No. ML12128A405).
The NRC staff received comment
submissions on the proposed revision.
The NRC staff made several changes to
the proposed revision after
consideration of the comments.
Additionally, in July 2013 (78 FR 41436)
the staff re-noticed the draft SRP section
to include a revised position on
treatment of the high winds external
hazard for certain RTNSS structures,
systems and components. Comments
from both the original request for
comment and subsequent re-issuance
are documented alongside the NRC
staff’s respective response in ADAMS
under Accession No. ML14035A148. A
redline strikeout comparing the
proposed draft and final revisions can
be found in ADAMS under Accession
No. ML14035A146.
II. Backfitting and Issue Finality
This SRP provides guidance to the
staff for reviewing applications for a
construction permit and an operating
license under part 50 of Title 10 of the
Code of Federal Regulations (10 CFR)
VerDate Mar<15>2010
17:49 Jul 01, 2014
Jkt 232001
with respect to the regulatory treatment
of non-safety systems. The draft SRP
would also provide guidance for
reviewing an application for a standard
design approval, a standard design
certification, a combined license, and a
manufacturing license under 10 CFR
part 52 with respect to these same
subject matters.
Issuance of this final SRP section does
not constitute backfitting as defined in
10 CFR 50.109 (the Backfit Rule) and is
not otherwise inconsistent with the
issue finality provisions in 10 CFR part
52. The NRC staff’s position is based
upon the following considerations:
1. The SRP positions do not constitute
backfitting, inasmuch as the SRP is
internal guidance directed at the NRC
staff with respect to their regulatory
responsibilities.
The SRP provides guidance to the
staff on how to review an application for
NRC regulatory approval in the form of
licensing. Changes in internal staff
guidance are not matters for which
either nuclear power plant applicants or
licensees are protected under either the
Backfit Rule or the issue finality
provisions of 10 CFR part 52.
2. Backfitting and issue finality—with
certain exceptions discussed below—do
not protect current or future applicants.
Applicants and potential applicants
are not, with certain exceptions,
protected by either the Backfit Rule or
any issue finality provisions under 10
CFR part 52. This is because neither the
Backfit Rule nor the issue finality
provisions were intended to apply to
every NRC action which substantially
changes the expectations of current and
future applicants.
The exceptions to the general
principle are applicable whenever an
applicant references a 10 CFR part 52
license (e.g., an early site permit) and/
or NRC regulatory approval (e.g., a
design certification rule) with specified
issue finality provisions. The staff does
not currently intend to impose the
positions represented in this SRP
section in a manner that is inconsistent
with any issue finality provisions of 10
CFR part 52. If in the future the NRC
staff does indeed intend to impose
positions inconsistent with these issue
finality provisions, the NRC staff must
address the regulatory criteria for
avoiding issue finality.
The staff notes that with respect to
economic simplified boiling water
reactor (ESBWR) design certification
application currently under
consideration by the NRC, the NRC staff
does not intend to reevaluate the
adequacy of RTNSS SSCs, because for
the ESBWR design already meets the
guidance discussed in this SRP Section.
PO 00000
Frm 00073
Fmt 4703
Sfmt 4703
37783
3. The NRC staff has no intention to
impose the SRP positions on existing
nuclear power plant licenses or
regulatory approvals either now or in
the future (absent a voluntary request
for change from the licensee, holder of
a regulatory approval, or a design
certification applicant).
The staff does not intend to impose or
apply the positions described in the SRP
section to existing (already issued)
licenses (e.g., operating licenses and
combined licenses) and regulatory
approvals—in this case, design
certifications and combined licenses.
Hence, the issuance of this SRP
guidance even if considered guidance
which is within the purview of the issue
finality provisions in 10 CFR part 52—
need not be evaluated as if it were a
backfit or as being inconsistent with
issue finality provisions. If, in the
future, the staff seeks to impose a
position in the SRP on holders of
already issued licenses in a manner
which does not provide issue finality as
described in the applicable issue finality
provision, then the staff must make the
showing as set forth in the Backfit Rule,
or address the criteria for avoiding issue
finality as described in the applicable
issue finality provision.
III. Congressional Review Act
This action is a rule as defined in the
Congressional Review Act (5 U.S.C.
801–808). However, the Office of
Management and Budget has not found
it to be a major rule as defined in the
Congressional Review Act.
Dated at Rockville, Maryland, this 23rd day
of June, 2014.
For the Nuclear Regulatory Commission.
Joseph Colaccino, Chief,
Policy Branch, Division of Advanced Reactors
and Rulemaking, Office of New Reactors.
[FR Doc. 2014–15572 Filed 7–1–14; 8:45 am]
BILLING CODE 7590–01–P
POSTAL SERVICE
Transfer of Inbound Surface Parcel
Post (at UPU Rates) to Competitive
Product List
Postal ServiceTM.
Notice.
AGENCY:
ACTION:
The Postal Service hereby
provides notice that it has filed a
request with the Postal Regulatory
Commission to transfer Inbound Surface
Parcel Post (at UPU rates) from the
market-dominant product list to the
competitive product list.
DATES: Effective date: July 2, 2014.
FOR FURTHER INFORMATION CONTACT:
Caroline Brownlie, 202–268–3010.
SUMMARY:
E:\FR\FM\02JYN1.SGM
02JYN1
Agencies
[Federal Register Volume 79, Number 127 (Wednesday, July 2, 2014)]
[Notices]
[Pages 37782-37783]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-15572]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2012-0237]
Regulatory Treatment of Non-Safety Systems for Passive Advanced
Light Water Reactors
AGENCY: Nuclear Regulatory Commission.
ACTION: Standard review plan; issuance.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing a
final revision to the following section of NUREG-0800, ``Standard
Review Plan for the Review of Safety Analysis Reports for Nuclear Power
Plants: LWR Edition'' Section 19.3, ``Regulatory Treatment of Non-
Safety Systems (RTNSS) for Passive Advanced Light Water Reactors.''
DATES: The effective date of this Standard Review Plan (SRP) update is
August 1, 2014.
ADDRESSES: Please refer to Docket ID NRC-2012-0237 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly-available information related to this document
using any of the following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2012-0237. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-287-
3422; email: Carol.Gallagher@nrc.gov. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may access publicly-
[[Page 37783]]
available documents online in the ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/adams.html. To begin the search, select
``ADAMS Public Documents'' and then select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to pdr.resource@nrc.gov. The final revision for Section 19.3,
``Regulatory Treatment of Non-Safety Systems (RTNSS) for Passive
Advanced Light Water Reactors.'' is available under ADAMS Accession No
ML14035A149.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike Rockville, Maryland 20852.
The NRC posts its issued staff guidance on the NRC's
external Web page at https://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr0800/.
FOR FURTHER INFORMATION CONTACT: Jonathan DeGange, Office of New
Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001; telephone: 301-415-6992 or email: Jonathan.Degange@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Background
On October 12, 2012 (77 FR 62270) the NRC staff published for
public comment the initial issuance of Section 19.3, ``Regulatory
Treatment of Non-Safety Systems (RTNSS) for Passive Advanced Light
Water Reactors,'' (ADAMS Accession No. ML12128A405).
The NRC staff received comment submissions on the proposed
revision. The NRC staff made several changes to the proposed revision
after consideration of the comments. Additionally, in July 2013 (78 FR
41436) the staff re-noticed the draft SRP section to include a revised
position on treatment of the high winds external hazard for certain
RTNSS structures, systems and components. Comments from both the
original request for comment and subsequent re-issuance are documented
alongside the NRC staff's respective response in ADAMS under Accession
No. ML14035A148. A redline strikeout comparing the proposed draft and
final revisions can be found in ADAMS under Accession No. ML14035A146.
II. Backfitting and Issue Finality
This SRP provides guidance to the staff for reviewing applications
for a construction permit and an operating license under part 50 of
Title 10 of the Code of Federal Regulations (10 CFR) with respect to
the regulatory treatment of non-safety systems. The draft SRP would
also provide guidance for reviewing an application for a standard
design approval, a standard design certification, a combined license,
and a manufacturing license under 10 CFR part 52 with respect to these
same subject matters.
Issuance of this final SRP section does not constitute backfitting
as defined in 10 CFR 50.109 (the Backfit Rule) and is not otherwise
inconsistent with the issue finality provisions in 10 CFR part 52. The
NRC staff's position is based upon the following considerations:
1. The SRP positions do not constitute backfitting, inasmuch as the
SRP is internal guidance directed at the NRC staff with respect to
their regulatory responsibilities.
The SRP provides guidance to the staff on how to review an
application for NRC regulatory approval in the form of licensing.
Changes in internal staff guidance are not matters for which either
nuclear power plant applicants or licensees are protected under either
the Backfit Rule or the issue finality provisions of 10 CFR part 52.
2. Backfitting and issue finality--with certain exceptions
discussed below--do not protect current or future applicants.
Applicants and potential applicants are not, with certain
exceptions, protected by either the Backfit Rule or any issue finality
provisions under 10 CFR part 52. This is because neither the Backfit
Rule nor the issue finality provisions were intended to apply to every
NRC action which substantially changes the expectations of current and
future applicants.
The exceptions to the general principle are applicable whenever an
applicant references a 10 CFR part 52 license (e.g., an early site
permit) and/or NRC regulatory approval (e.g., a design certification
rule) with specified issue finality provisions. The staff does not
currently intend to impose the positions represented in this SRP
section in a manner that is inconsistent with any issue finality
provisions of 10 CFR part 52. If in the future the NRC staff does
indeed intend to impose positions inconsistent with these issue
finality provisions, the NRC staff must address the regulatory criteria
for avoiding issue finality.
The staff notes that with respect to economic simplified boiling
water reactor (ESBWR) design certification application currently under
consideration by the NRC, the NRC staff does not intend to reevaluate
the adequacy of RTNSS SSCs, because for the ESBWR design already meets
the guidance discussed in this SRP Section.
3. The NRC staff has no intention to impose the SRP positions on
existing nuclear power plant licenses or regulatory approvals either
now or in the future (absent a voluntary request for change from the
licensee, holder of a regulatory approval, or a design certification
applicant).
The staff does not intend to impose or apply the positions
described in the SRP section to existing (already issued) licenses
(e.g., operating licenses and combined licenses) and regulatory
approvals--in this case, design certifications and combined licenses.
Hence, the issuance of this SRP guidance even if considered guidance
which is within the purview of the issue finality provisions in 10 CFR
part 52--need not be evaluated as if it were a backfit or as being
inconsistent with issue finality provisions. If, in the future, the
staff seeks to impose a position in the SRP on holders of already
issued licenses in a manner which does not provide issue finality as
described in the applicable issue finality provision, then the staff
must make the showing as set forth in the Backfit Rule, or address the
criteria for avoiding issue finality as described in the applicable
issue finality provision.
III. Congressional Review Act
This action is a rule as defined in the Congressional Review Act (5
U.S.C. 801-808). However, the Office of Management and Budget has not
found it to be a major rule as defined in the Congressional Review Act.
Dated at Rockville, Maryland, this 23rd day of June, 2014.
For the Nuclear Regulatory Commission.
Joseph Colaccino, Chief,
Policy Branch, Division of Advanced Reactors and Rulemaking, Office of
New Reactors.
[FR Doc. 2014-15572 Filed 7-1-14; 8:45 am]