Combined Notice of Filings, 36304-36305 [2014-14984]

Download as PDF 36304 Federal Register / Vol. 79, No. 123 / Thursday, June 26, 2014 / Notices Public Participation: The EM SSAB, Idaho National Laboratory, welcomes the attendance of the public at its advisory committee meetings and will make every effort to accommodate persons with physical disabilities or special needs. If you require special accommodations due to a disability, please contact Robert L. Pence at least seven days in advance of the meeting at the phone number listed above. Written statements may be filed with the Board either before or after the meeting. Individuals who wish to make oral presentations pertaining to agenda items should contact Robert L. Pence at the address or telephone number listed above. The request must be received five days prior to the meeting and reasonable provision will be made to include the presentation in the agenda. The Deputy Designated Federal Officer is empowered to conduct the meeting in a fashion that will facilitate the orderly conduct of business. Individuals wishing to make public comments will be provided a maximum of five minutes to present their comments. This notice is being published less than 15 days prior to the meeting date due to logistical issues that had to be resolved prior to the meeting date. Minutes: Minutes will be available by writing or calling Robert L. Pence, Federal Coordinator, at the address and phone number listed above. Minutes will also be available at the following Web site: https://inlcab.energy.gov/ pages/meetings.php. Issued at Washington, DC, on June 20, 2014. LaTanya R. Butler, Deputy Committee Management Officer. [FR Doc. 2014–15019 Filed 6–25–14; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission tkelley on DSK3SPTVN1PROD with NOTICES Combined Notice of Filings #2 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2474–008. Applicants: Sierra Pacific Power Company. Description: Market-Based Rate Tariff, Volume No. 7 Amendment to be effective 2/3/2014. Filed Date: 6/19/14. Accession Number: 20140619–5064. Comments Due: 5 p.m. ET 7/10/14. Docket Numbers: ER10–2475–008. Applicants: Nevada Power Company. VerDate Mar<15>2010 16:51 Jun 25, 2014 Jkt 232001 Description: Market-Based Rate Tariff, Volume No. 11 Amendment to be effective 2/3/2014. Filed Date: 6/19/14. Accession Number: 20140619–5065. Comments Due: 5 p.m. ET 7/10/14. Docket Numbers: ER14–275–001. Applicants: DTE Electric Company. Description: Clinton Compliance Filing to be effective 1/1/2014. Filed Date: 6/19/14. Accession Number: 20140619–5062. Comments Due: 5 p.m. ET 7/10/14. Docket Numbers: ER14–2209–001. Applicants: Duke Energy Progress, Inc. Description: 2nd Amended filing to RS 193 Cargill-DEP to be effective 6/14/2014. Filed Date: 6/18/14. Accession Number: 20140618–5111. Comments Due: 5 p.m. ET 7/9/14. Docket Numbers: ER14–2222–000. Applicants: Arizona Public Service Company. Description: Rate Schedule No. 273— Hassayampa—North Gila 500kV. Particpation Agreement to be effective 8/19/2014. Filed Date: 6/19/14. Accession Number: 20140619–5067. Comments Due: 5 p.m. ET 7/10/14. Docket Numbers: ER14–2223–000. Applicants: Sabine Cogen, LP. Description: Sabine Category Change Amendment Filing to be effective 6/20/2014. Filed Date: 6/19/14. Accession Number: 20140619–5086. Comments Due: 5 p.m. ET 7/10/14. Docket Numbers: ER14–2224–000. Applicants: CenterPoint Energy Houston Electric, LLC. Description: TFO Tariff Interim Rate Revision to Conform with PUCTApproved ERCOT Rate to be effective 5/12/2014. Filed Date: 6/19/14. Accession Number: 20140619–5098. Comments Due: 5 p.m. ET 7/10/14. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 19, 2014. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2014–14982 Filed 6–25–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP14–1049–000. Applicants: American Midstream (Midla), LLC. Description: Midla Off-System Capacity Filing to be effective 7/16/ 2014. Filed Date: 6/16/14. Accession Number: 20140616–5119. Comments Due: 5 p.m. ET 6/30/14. Docket Numbers: RP14–1050–000. Applicants: Leaf River Energy Center LLC. Description: Tariff Changes to Update Contact Information to be effective 7/16/ 2014. Filed Date: 6/16/14. Accession Number: 20140616–5213. Comments Due: 5 p.m. ET 6/30/14. Docket Numbers: RP14–1051–000. Applicants: Honeoye Storage Corporation. Description: June 2014 Show Cause Order issued March 20 2014 Change to be effective 7/20/2014. Filed Date: 6/17/14. Accession Number: 20140617–5059. Comments Due: 5 p.m. ET 6/30/14. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. Filings in Existing Proceedings Docket Numbers: RP14–764–001. Applicants: Millennium Pipeline Company, LLC. Description: Negotiated Rate Service Agmt—WPX Compliance Filing to be effective 5/1/2014. E:\FR\FM\26JNN1.SGM 26JNN1 Federal Register / Vol. 79, No. 123 / Thursday, June 26, 2014 / Notices Filed Date: 6/17/14. Accession Number: 20140617–5118. Comments Due: 5 p.m. ET 6/30/14. Any person desiring to protest in any of the above proceedings must file in accordance with Rule 211 of the Commission’s Regulations (18 CFR 385.211) on or before 5:00 p.m. Eastern time on the specified comment date. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 18, 2014. Nathaniel J. Davis, Sr., Deputy Secretary. clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 16, 2014. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2014–14983 Filed 6–25–14; 8:45 am] BILLING CODE 6717–01–P [FR Doc. 2014–14984 Filed 6–25–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. RD14–7–000] Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: North American Electric Reliability Corporation; Order Approving Reliability Standard tkelley on DSK3SPTVN1PROD with NOTICES Filings Instituting Proceedings Before Commissioners: Cheryl A. LaFleur, Acting Chairman; Philip D. Moeller, John R. Norris, and Tony Clark. Docket Numbers: RP14–1046–000. Applicants: Texas Gas Transmission, LLC. Description: Superceding Neg Rate Agmt (Macquarie 26833) to be effective 6/13/2014. Filed Date: 6/13/14. Accession Number: 20140613–5054. Comments Due: 5 p.m. ET 6/25/14. Docket Numbers: RP14–1047–000. Applicants: American Midstream (Midla), LLC. Description: Midla Revision to Tariff Record 25 to be effective 8/1/2014. Filed Date: 6/13/14. Accession Number: 20140613–5105. Comments Due: 5 p.m. ET 6/25/14. Docket Numbers: RP14–1048–000. Applicants: Tallgrass Interstate Gas Transmission, L. Description: Neg Rate 2014–06–06 Atmos A&R NRA to be effective 6/14/ 2014. Filed Date: 6/13/14. Accession Number: 20140613–5178. Comments Due: 5 p.m. ET 6/25/14. The filings are accessible in the Commission’s eLibrary system by 1. On March 7, 2014, the North American Electric Reliability Corporation (NERC) submitted a petition for approval of proposed Reliability Standard PER–005–2 (Operations Personnel Training) and retirement of currently-effective Reliability Standard PER–005–1 (Systems Personnel Training). Reliability Standard PER–005–2 is designed to ensure that personnel performing or supporting real-time operations on the Bulk-Power System are trained using a systematic approach, and expands the scope of NERC’s currently-effective training Reliability Standard to include certain personnel of transmission owners and generator operators, as well as operations support personnel as defined in a proposed new term for the NERC Glossary of Terms Used in Reliability Standards (NERC Glossary or Glossary). In addition, the proposed Reliability Standard includes new implementation period requirements for entities that become subject to the obligation to provide emergency operations training using VerDate Mar<15>2010 16:51 Jun 25, 2014 Jkt 232001 PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 36305 simulation technology. NERC requests that the proposed standard become effective the first day of the first calendar quarter 24 months beyond the date the standard is approved. 2. As explained below, pursuant to section 215(d) of the Federal Power Act (FPA),1 we approve Reliability Standard PER–005–2, and find that it is just, reasonable, not unduly discriminatory or preferential, and in the public interest. We also approve NERC’s proposed implementation plan for the revised standard, including the retirement of currently-effective Reliability Standard PER–005–1, and the proposed violation risk factors and violation severity levels. Finally, we approve the new Glossary term ‘‘Operations Support Personnel’’ and proposed changes to the Glossary term ‘‘System Operator’’ as described in NERC’s petition. I. Background 3. The Commission certified NERC as the Electric Reliability Organization (ERO), as defined in section 215 of the FPA, in July 2006.2 On March 16, 2007, the Commission issued Order No. 693, approving 83 of the 107 initial Reliability Standards filed by NERC,3 including four PER Reliability Standards governing certain areas of personnel staffing and training.4 4. In addition, under section 215(d)(5) of the FPA, the Commission directed NERC to develop several modifications to the approved PER standards. Specifically, the Commission directed NERC to develop revised or additional standards that would: (1) Identify the expectations of the training for each job function; (2) develop training programs tailored to each job function with consideration of the individual training needs of the personnel; (3) expand the applicability of the training requirements to include: reliability coordinators, local transmission control center operator personnel, generator operators centrally-located at a generation control center with a direct impact on the reliable operation of the Bulk-Power System, and operations planning and operations support staff who carry out outage planning and assessments and those who develop 1 16 U.S.C. 824o(d) (2012). American Electric Reliability Corp., 116 FERC ¶ 61,062, order on reh’g and compliance, 117 FERC ¶ 61,126 (2006), order on compliance, 118 FERC ¶ 61,190, order on reh’g 119 FERC ¶ 61,046 (2007), aff’d sub nom. Alcoa Inc. v. FERC, 564 F.3d 1342 (D.C. Cir. 2009). 3 Mandatory Reliability Standards for the BulkPower System, Order No. 693, FERC Stats. & Regs. ¶ 31,242, order on reh’g, Order No. 693–A, 120 FERC ¶ 61,053 (2007). 4 See id. PP 1324–1417. 2 North E:\FR\FM\26JNN1.SGM 26JNN1

Agencies

[Federal Register Volume 79, Number 123 (Thursday, June 26, 2014)]
[Notices]
[Pages 36304-36305]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-14984]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

Filings Instituting Proceedings

    Docket Numbers: RP14-1049-000.
    Applicants: American Midstream (Midla), LLC.
    Description: Midla Off-System Capacity Filing to be effective 7/16/
2014.
    Filed Date: 6/16/14.
    Accession Number: 20140616-5119.
    Comments Due: 5 p.m. ET 6/30/14.

    Docket Numbers: RP14-1050-000.
    Applicants: Leaf River Energy Center LLC.
    Description: Tariff Changes to Update Contact Information to be 
effective 7/16/2014.
    Filed Date: 6/16/14.
    Accession Number: 20140616-5213.
    Comments Due: 5 p.m. ET 6/30/14.

    Docket Numbers: RP14-1051-000.
    Applicants: Honeoye Storage Corporation.
    Description: June 2014 Show Cause Order issued March 20 2014 Change 
to be effective 7/20/2014.
    Filed Date: 6/17/14.
    Accession Number: 20140617-5059.
    Comments Due: 5 p.m. ET 6/30/14.

    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.

Filings in Existing Proceedings

    Docket Numbers: RP14-764-001.
    Applicants: Millennium Pipeline Company, LLC.
    Description: Negotiated Rate Service Agmt--WPX Compliance Filing to 
be effective 5/1/2014.

[[Page 36305]]

    Filed Date: 6/17/14.
    Accession Number: 20140617-5118.
    Comments Due: 5 p.m. ET 6/30/14.

    Any person desiring to protest in any of the above proceedings must 
file in accordance with Rule 211 of the Commission's Regulations (18 
CFR 385.211) on or before 5:00 p.m. Eastern time on the specified 
comment date.
    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: June 18, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014-14984 Filed 6-25-14; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.