Combined Notice of Filings, 36305 [2014-14983]
Download as PDF
Federal Register / Vol. 79, No. 123 / Thursday, June 26, 2014 / Notices
Filed Date: 6/17/14.
Accession Number: 20140617–5118.
Comments Due: 5 p.m. ET 6/30/14.
Any person desiring to protest in any
of the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 18, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 16, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014–14983 Filed 6–25–14; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2014–14984 Filed 6–25–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. RD14–7–000]
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
North American Electric Reliability
Corporation; Order Approving
Reliability Standard
tkelley on DSK3SPTVN1PROD with NOTICES
Filings Instituting Proceedings
Before Commissioners: Cheryl A. LaFleur,
Acting Chairman; Philip D. Moeller, John
R. Norris, and Tony Clark.
Docket Numbers: RP14–1046–000.
Applicants: Texas Gas Transmission,
LLC.
Description: Superceding Neg Rate
Agmt (Macquarie 26833) to be effective
6/13/2014.
Filed Date: 6/13/14.
Accession Number: 20140613–5054.
Comments Due: 5 p.m. ET 6/25/14.
Docket Numbers: RP14–1047–000.
Applicants: American Midstream
(Midla), LLC.
Description: Midla Revision to Tariff
Record 25 to be effective 8/1/2014.
Filed Date: 6/13/14.
Accession Number: 20140613–5105.
Comments Due: 5 p.m. ET 6/25/14.
Docket Numbers: RP14–1048–000.
Applicants: Tallgrass Interstate Gas
Transmission, L.
Description: Neg Rate 2014–06–06
Atmos A&R NRA to be effective 6/14/
2014.
Filed Date: 6/13/14.
Accession Number: 20140613–5178.
Comments Due: 5 p.m. ET 6/25/14.
The filings are accessible in the
Commission’s eLibrary system by
1. On March 7, 2014, the North
American Electric Reliability
Corporation (NERC) submitted a
petition for approval of proposed
Reliability Standard PER–005–2
(Operations Personnel Training) and
retirement of currently-effective
Reliability Standard PER–005–1
(Systems Personnel Training).
Reliability Standard PER–005–2 is
designed to ensure that personnel
performing or supporting real-time
operations on the Bulk-Power System
are trained using a systematic approach,
and expands the scope of NERC’s
currently-effective training Reliability
Standard to include certain personnel of
transmission owners and generator
operators, as well as operations support
personnel as defined in a proposed new
term for the NERC Glossary of Terms
Used in Reliability Standards (NERC
Glossary or Glossary). In addition, the
proposed Reliability Standard includes
new implementation period
requirements for entities that become
subject to the obligation to provide
emergency operations training using
VerDate Mar<15>2010
16:51 Jun 25, 2014
Jkt 232001
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
36305
simulation technology. NERC requests
that the proposed standard become
effective the first day of the first
calendar quarter 24 months beyond the
date the standard is approved.
2. As explained below, pursuant to
section 215(d) of the Federal Power Act
(FPA),1 we approve Reliability Standard
PER–005–2, and find that it is just,
reasonable, not unduly discriminatory
or preferential, and in the public
interest. We also approve NERC’s
proposed implementation plan for the
revised standard, including the
retirement of currently-effective
Reliability Standard PER–005–1, and
the proposed violation risk factors and
violation severity levels. Finally, we
approve the new Glossary term
‘‘Operations Support Personnel’’ and
proposed changes to the Glossary term
‘‘System Operator’’ as described in
NERC’s petition.
I. Background
3. The Commission certified NERC as
the Electric Reliability Organization
(ERO), as defined in section 215 of the
FPA, in July 2006.2 On March 16, 2007,
the Commission issued Order No. 693,
approving 83 of the 107 initial
Reliability Standards filed by NERC,3
including four PER Reliability
Standards governing certain areas of
personnel staffing and training.4
4. In addition, under section 215(d)(5)
of the FPA, the Commission directed
NERC to develop several modifications
to the approved PER standards.
Specifically, the Commission directed
NERC to develop revised or additional
standards that would: (1) Identify the
expectations of the training for each job
function; (2) develop training programs
tailored to each job function with
consideration of the individual training
needs of the personnel; (3) expand the
applicability of the training
requirements to include: reliability
coordinators, local transmission control
center operator personnel, generator
operators centrally-located at a
generation control center with a direct
impact on the reliable operation of the
Bulk-Power System, and operations
planning and operations support staff
who carry out outage planning and
assessments and those who develop
1 16
U.S.C. 824o(d) (2012).
American Electric Reliability Corp., 116
FERC ¶ 61,062, order on reh’g and compliance, 117
FERC ¶ 61,126 (2006), order on compliance, 118
FERC ¶ 61,190, order on reh’g 119 FERC ¶ 61,046
(2007), aff’d sub nom. Alcoa Inc. v. FERC, 564 F.3d
1342 (D.C. Cir. 2009).
3 Mandatory Reliability Standards for the BulkPower System, Order No. 693, FERC Stats. & Regs.
¶ 31,242, order on reh’g, Order No. 693–A, 120
FERC ¶ 61,053 (2007).
4 See id. PP 1324–1417.
2 North
E:\FR\FM\26JNN1.SGM
26JNN1
Agencies
[Federal Register Volume 79, Number 123 (Thursday, June 26, 2014)]
[Notices]
[Page 36305]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-14983]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP14-1046-000.
Applicants: Texas Gas Transmission, LLC.
Description: Superceding Neg Rate Agmt (Macquarie 26833) to be
effective 6/13/2014.
Filed Date: 6/13/14.
Accession Number: 20140613-5054.
Comments Due: 5 p.m. ET 6/25/14.
Docket Numbers: RP14-1047-000.
Applicants: American Midstream (Midla), LLC.
Description: Midla Revision to Tariff Record 25 to be effective 8/
1/2014.
Filed Date: 6/13/14.
Accession Number: 20140613-5105.
Comments Due: 5 p.m. ET 6/25/14.
Docket Numbers: RP14-1048-000.
Applicants: Tallgrass Interstate Gas Transmission, L.
Description: Neg Rate 2014-06-06 Atmos A&R NRA to be effective 6/
14/2014.
Filed Date: 6/13/14.
Accession Number: 20140613-5178.
Comments Due: 5 p.m. ET 6/25/14.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: June 16, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014-14983 Filed 6-25-14; 8:45 am]
BILLING CODE 6717-01-P