Flambeau Hydro, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process, 36047 [2014-14844]
Download as PDF
Federal Register / Vol. 79, No. 122 / Wednesday, June 25, 2014 / Notices
Public Participation: The EM SSAB,
Oak Ridge, welcomes the attendance of
the public at its advisory committee
meetings and will make every effort to
accommodate persons with physical
disabilities or special needs. If you
require special accommodations due to
a disability, please contact Melyssa P.
Noe at least seven days in advance of
the meeting at the phone number listed
above. Written statements may be filed
with the Board either before or after the
meeting. Individuals who wish to make
oral statements pertaining to the agenda
item should contact Melyssa P. Noe at
the address or telephone number listed
above. Requests must be received five
days prior to the meeting and reasonable
provision will be made to include the
presentation in the agenda. The Deputy
Designated Federal Officer is
empowered to conduct the meeting in a
fashion that will facilitate the orderly
conduct of business. Individuals
wishing to make public comments will
be provided a maximum of five minutes
to present their comments.
Minutes: Minutes will be available by
writing or calling Melyssa P. Noe at the
address and phone number listed above.
Minutes will also be available at the
following Web site: https://energy.gov/
orem/services/community-engagement/
oak-ridge-site-specific-advisory-board.
Issued at Washington, DC, on June 20,
2014.
LaTanya R. Butler,
Deputy Committee Management Officer.
[FR Doc. 2014–14824 Filed 6–24–14; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2684–009]
mstockstill on DSK4VPTVN1PROD with NOTICES
Flambeau Hydro, LLC; Notice of Intent
To File License Application, Filing of
Pre-Application Document, and
Approving Use of the Traditional
Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 2684–009.
c. Date Filed: April 22, 2014.
d. Submitted By: Flambeau Hydro,
LLC.
e. Name of Project: Arpin
Hydroelectric Project.
f. Location: On the Chippewa River
near the Village of Radisson, in Sawyer
County, Wisconsin. No federal lands are
occupied by the project works or located
within the project boundary.
VerDate Mar<15>2010
18:01 Jun 24, 2014
Jkt 232001
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Jason
P. Kreuscher, Vice President,
Operations, Renewable World Energies,
LLC, 100 S. State Street, P.O. Box 264,
Neshkoro, WI 54960; phone: (855) 462–
0220.
i. FERC Contact: Isis Johnson at (202)
502–6346; or email at isis.johnson@
ferc.gov.
j. Flambeau Hydro filed its request to
use the Traditional Licensing Process on
April 22, 2014. Flambeau Hydro
provided public notice of its request on
April 23, 2014. In a letter dated June 19,
2014, the Director of the Division of
Hydropower Licensing approved
Flambeau Hydro’s request to use the
Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with: (a) The U.S.
Fish and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402; (b) NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920; and (c)
the Wisconsin State Historic
Preservation Officer, as required by
section 106, National Historical
Preservation Act, and the implementing
regulations of the Advisory Council on
Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Flambeau Hydro as the Commission’s
non-federal representative for carrying
out informal consultation, pursuant to
section 7 of the Endangered Species Act,
section 305 of the Magnuson-Stevens
Fishery Conservation and Management
Act, and section 106 of the National
Historic Preservation Act.
m. Flambeau Hydro filed a PreApplication Document (PAD; including
a proposed process plan and schedule)
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
o. The licensee states its unequivocal
intent to submit an application for a
PO 00000
Frm 00060
Fmt 4703
Sfmt 4703
36047
new license for Project No. 2684.
Pursuant to 18 CFR 16.8, 16.9, and 16.10
each application for a new license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by April 30, 2017.
p. Register online at https://www.ferc.
gov/docs-filing/esubscription.asp to be
notified via email of new filing and
issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
Dated: June 19, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–14844 Filed 6–24–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–127–003.
Applicants: Idaho Power Company.
Description: Resubmitted OATT
Order No. 1000 Third Regional
Compliance Filing to be effective
6/13/2014.
Filed Date: 6/18/14.
Accession Number: 20140618–5002.
Comments Due: 5 p.m. ET 7/7/14.
Docket Numbers: ER14–1882–001.
Applicants: Monongahela Power
Company.
Description: Compliance Filing per
6/9/14 Order in ER14–1882 to be
effective 6/1/2014.
Filed Date: 6/18/14.
Accession Number: 20140618–5072.
Comments Due: 5 p.m. ET 7/9/14.
Docket Numbers: ER14–1883–001.
Applicants: Allegheny Energy Supply
Company, LLC.
Description: Compliance Filing per
6/9/14 Order in ER14–1883 to be
effective 6/1/2014.
Filed Date: 6/18/14.
Accession Number: 20140618–5073.
Comments Due: 5 p.m. ET 7/9/14.
Docket Numbers: ER14–2200–000.
Applicants: ESI Vansycle Partners,
L.P.
Description: ESI Vansycle Partners,
L.P. Order No. 784 Compliance Filing to
be effective 6/18/2014.
Filed Date: 6/17/14.
Accession Number: 20140617–5144.
Comments Due: 5 p.m. ET 7/8/14.
E:\FR\FM\25JNN1.SGM
25JNN1
Agencies
[Federal Register Volume 79, Number 122 (Wednesday, June 25, 2014)]
[Notices]
[Page 36047]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-14844]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2684-009]
Flambeau Hydro, LLC; Notice of Intent To File License
Application, Filing of Pre-Application Document, and Approving Use of
the Traditional Licensing Process
a. Type of Filing: Notice of Intent to File License Application and
Request to Use the Traditional Licensing Process.
b. Project No.: 2684-009.
c. Date Filed: April 22, 2014.
d. Submitted By: Flambeau Hydro, LLC.
e. Name of Project: Arpin Hydroelectric Project.
f. Location: On the Chippewa River near the Village of Radisson, in
Sawyer County, Wisconsin. No federal lands are occupied by the project
works or located within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Potential Applicant Contact: Jason P. Kreuscher, Vice President,
Operations, Renewable World Energies, LLC, 100 S. State Street, P.O.
Box 264, Neshkoro, WI 54960; phone: (855) 462-0220.
i. FERC Contact: Isis Johnson at (202) 502-6346; or email at
isis.johnson@ferc.gov.
j. Flambeau Hydro filed its request to use the Traditional
Licensing Process on April 22, 2014. Flambeau Hydro provided public
notice of its request on April 23, 2014. In a letter dated June 19,
2014, the Director of the Division of Hydropower Licensing approved
Flambeau Hydro's request to use the Traditional Licensing Process.
k. With this notice, we are initiating informal consultation with:
(a) The U.S. Fish and Wildlife Service and/or NOAA Fisheries under
section 7 of the Endangered Species Act and the joint agency
regulations thereunder at 50 CFR, Part 402; (b) NOAA Fisheries under
section 305(b) of the Magnuson-Stevens Fishery Conservation and
Management Act and implementing regulations at 50 CFR 600.920; and (c)
the Wisconsin State Historic Preservation Officer, as required by
section 106, National Historical Preservation Act, and the implementing
regulations of the Advisory Council on Historic Preservation at 36 CFR
800.2.
l. With this notice, we are designating Flambeau Hydro as the
Commission's non-federal representative for carrying out informal
consultation, pursuant to section 7 of the Endangered Species Act,
section 305 of the Magnuson-Stevens Fishery Conservation and Management
Act, and section 106 of the National Historic Preservation Act.
m. Flambeau Hydro filed a Pre-Application Document (PAD; including
a proposed process plan and schedule) with the Commission, pursuant to
18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's Web site
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCONlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in paragraph h.
o. The licensee states its unequivocal intent to submit an
application for a new license for Project No. 2684. Pursuant to 18 CFR
16.8, 16.9, and 16.10 each application for a new license and any
competing license applications must be filed with the Commission at
least 24 months prior to the expiration of the existing license. All
applications for license for this project must be filed by April 30,
2017.
p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: June 19, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-14844 Filed 6-24-14; 8:45 am]
BILLING CODE 6717-01-P