El Dorado Irrigation District; Notice of Application To Amend Exemption (Conduit) Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 35339-35340 [2014-14468]

Download as PDF mstockstill on DSK4VPTVN1PROD with NOTICES Federal Register / Vol. 79, No. 119 / Friday, June 20, 2014 / Notices waste management, and related activities. Purpose of the Environmental Monitoring and Remediation Committee (EM&R): The EM&R Committee provides a citizens’ perspective to NNMCAB on current and future environmental remediation activities resulting from historical Los Alamos National Laboratory (LANL) operations and, in particular, issues pertaining to groundwater, surface water and work required under the New Mexico Environment Department Order on Consent. The EM&R Committee will keep abreast of DOE–EM and site programs and plans. The committee will work with the NNMCAB to provide assistance in determining priorities and the best use of limited funds and time. Formal recommendations will be proposed when needed and, after consideration and approval by the full NNMCAB, may be sent to DOE–EM for action. Purpose of the Waste Management (WM) Committee: The WM Committee reviews policies, practices and procedures, existing and proposed, so as to provide recommendations, advice, suggestions and opinions to the NNMCAB regarding waste management operations at the Los Alamos site. Tentative Agenda: 1. 2 p.m.—Approval of Agenda 2. 2:02 p.m.—Approval of Minutes from April 9, 2014 3. 2:05 p.m.—Old Business • Report from Annual Evaluation Ad Hoc Committee, Suggested Changes to Board Process—Alex Puglisi, Ashley Sanderson, Manuel Pacheco 4. 2:15 p.m.—New Business • Consideration and Action on Draft Recommendation 2014–02: Institution of Measures to Help Ensure Waste Isolation Pilot Plant (WIPP) and Los Alamos National Laboratory Transuranic Disposal Operations Remain Continually Operational 5. 2:30 p.m.—Update from Executive Committee—Carlos Valdez, Chair 6. 2:40 p.m.—Update from DOE—Lee Bishop, Deputy Designated Federal Officer • Update on WIPP Status and Issues 7. 3:15 p.m. Committee Breakout Session • Review Committee Work Plans for Impacts from Changes in 3706 Campaign • Discuss Topics for Committee Sponsored Draft Recommendations 8. 3:45 p.m.—Public Comment Period 9. 4 p.m.—Adjourn Public Participation: The NNMCAB’s Committees welcome the attendance of VerDate Mar<15>2010 22:31 Jun 19, 2014 Jkt 232001 the public at their combined committee meeting and will make every effort to accommodate persons with physical disabilities or special needs. If you require special accommodations due to a disability, please contact Menice Santistevan at least seven days in advance of the meeting at the telephone number listed above. Written statements may be filed with the Committees either before or after the meeting. Individuals who wish to make oral statements pertaining to agenda items should contact Menice Santistevan at the address or telephone number listed above. Requests must be received five days prior to the meeting and reasonable provision will be made to include the presentation in the agenda. The Deputy Designated Federal Officer is empowered to conduct the meeting in a fashion that will facilitate the orderly conduct of business. Individuals wishing to make public comments will be provided a maximum of five minutes to present their comments. Minutes: Minutes will be available by writing or calling Menice Santistevan at the address or phone number listed above. Minutes and other Board documents are on the Internet at: https:// www.nnmcab.energy.gov. Issued at Washington, DC, on June 16, 2014. LaTanya R. Butler, Deputy Committee Management Officer. [FR Doc. 2014–14474 Filed 6–19–14; 8:45 am] BILLING CODE 6405–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13714–001] El Dorado Irrigation District; Notice of Application To Amend Exemption (Conduit) Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Amendment of Exemption (Conduit). b. Project No: 13714–001. c. Date Filed: May 22, 2014. d. Applicant: El Dorado Irrigation District. e. Name of Project: Tank 7 In-Conduit Hydroelectric Project. f. Location: The small conduit hydropower project would be located on the Pleasant Oak main pipeline at the Tank 7 storage tank in El Dorado County, California. PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 35339 g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Brian Deason, Hydroelectric Compliance Analyst, 2890 Mosquito Road, Placerville, CA 95667, (530) 642–4064. i. FERC Contact: Christopher Chaney, (202) 502–6778, christopher.chaney@ ferc.gov. j. Deadline for filing comments, motions to intervene, and protests, is 30 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file any motion to intervene, protest, comments, and/or recommendations using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–13714–001. k. Description of Request: El Dorado Irrigation District proposes to amend the exemption to reduce the number of authorized generating units from three to two, and reduce the installed capacity from 590 kilowatts to 420 kilowatts. Due to the reduction in units, El Dorado also proposes to reduce the size of the powerhouse and project boundary. l. Locations of the Application: This filing may be viewed on the Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number P–13714 in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above and at the Commission’s Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. E:\FR\FM\20JNN1.SGM 20JNN1 mstockstill on DSK4VPTVN1PROD with NOTICES 35340 Federal Register / Vol. 79, No. 119 / Friday, June 20, 2014 / Notices n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the license amendment. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: June 16, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–14468 Filed 6–19–14; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 22:31 Jun 19, 2014 Jkt 232001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP14–496–000] Dominion Transmission, Inc.; Notice of Application Take notice that on June 2, 2014, Dominion Transmission, Inc. (DTI), 120 Tredegar Street, Richmond, Virginia 23219, filed in Docket No. CP14–496– 000, an application pursuant to section 7(c) of the Natural Gas Act and Part 157 of the Commission’s regulations, for a certificate of public convenience and necessity to construct and operate certain compression facilities located in Marshall County, West Virginia and Monroe County, Ohio known as the Clarington Project. Specifically, DTI plans to install over 16,130 of horsepower (hp) at existing compressor stations (6, 130 hp at Burch Ridge Stateion in Marshal County, WV and 10,000 hp at Mullett Station in Monroe County, OH), two meter stations and 2,612 feet of new 20-inch diameter suction piping and 2,756 feet of new 16inch diameter discharge piping in Monroe County, OH. The project is designed to provide natural gas incremental firm transportation services of 250,000 dekatherms per day on DTI’s system. DTI has an initial incremental rate to recover the costs of the Project facilities. The estimated cost for DTI’s construction of the project is $76,560,748, all as more fully set forth in the application, which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Any questions regarding this application should be directed to Matthew R. Bley, Manager, Gas Transmission Certificates, Dominion Transmission, Inc., 701 East Cary Street, Richmond, Virginia 23219, phone: (804) 771–4399, fax: (804) 771–4804, or email: matthew.r.bley@dom.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 7 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, E:\FR\FM\20JNN1.SGM 20JNN1

Agencies

[Federal Register Volume 79, Number 119 (Friday, June 20, 2014)]
[Notices]
[Pages 35339-35340]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-14468]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13714-001]


El Dorado Irrigation District; Notice of Application To Amend 
Exemption (Conduit) Accepted for Filing, Soliciting Comments, Motions 
To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Amendment of Exemption (Conduit).
    b. Project No: 13714-001.
    c. Date Filed: May 22, 2014.
    d. Applicant: El Dorado Irrigation District.
    e. Name of Project: Tank 7 In-Conduit Hydroelectric Project.
    f. Location: The small conduit hydropower project would be located 
on the Pleasant Oak main pipeline at the Tank 7 storage tank in El 
Dorado County, California.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Brian Deason, Hydroelectric Compliance 
Analyst, 2890 Mosquito Road, Placerville, CA 95667, (530) 642-4064.
    i. FERC Contact: Christopher Chaney, (202) 502-6778, 
christopher.chaney@ferc.gov.
    j. Deadline for filing comments, motions to intervene, and 
protests, is 30 days from the issuance date of this notice by the 
Commission. The Commission strongly encourages electronic filing. 
Please file any motion to intervene, protest, comments, and/or 
recommendations using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-13714-001.
    k. Description of Request: El Dorado Irrigation District proposes 
to amend the exemption to reduce the number of authorized generating 
units from three to two, and reduce the installed capacity from 590 
kilowatts to 420 kilowatts. Due to the reduction in units, El Dorado 
also proposes to reduce the size of the powerhouse and project 
boundary.
    l. Locations of the Application: This filing may be viewed on the 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number P-13714 in the docket number field to access 
the document. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and 
issuances related to this or other pending projects. For assistance, 
call 1-866-208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call 
(202) 502-8659. A copy is also available for inspection and 
reproduction at the address in item (h) above and at the Commission's 
Public Reference Room, located at 888 First Street NE., Room 2A, 
Washington, DC 20426, or by calling (202) 502-8371.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.

[[Page 35340]]

    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to project works which are the subject of the license amendment. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.

    Dated: June 16, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-14468 Filed 6-19-14; 8:45 am]
BILLING CODE 6717-01-P