El Dorado Irrigation District; Notice of Application To Amend Exemption (Conduit) Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 35339-35340 [2014-14468]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 79, No. 119 / Friday, June 20, 2014 / Notices
waste management, and related
activities.
Purpose of the Environmental
Monitoring and Remediation Committee
(EM&R): The EM&R Committee provides
a citizens’ perspective to NNMCAB on
current and future environmental
remediation activities resulting from
historical Los Alamos National
Laboratory (LANL) operations and, in
particular, issues pertaining to
groundwater, surface water and work
required under the New Mexico
Environment Department Order on
Consent. The EM&R Committee will
keep abreast of DOE–EM and site
programs and plans. The committee will
work with the NNMCAB to provide
assistance in determining priorities and
the best use of limited funds and time.
Formal recommendations will be
proposed when needed and, after
consideration and approval by the full
NNMCAB, may be sent to DOE–EM for
action.
Purpose of the Waste Management
(WM) Committee: The WM Committee
reviews policies, practices and
procedures, existing and proposed, so as
to provide recommendations, advice,
suggestions and opinions to the
NNMCAB regarding waste management
operations at the Los Alamos site.
Tentative Agenda:
1. 2 p.m.—Approval of Agenda
2. 2:02 p.m.—Approval of Minutes from
April 9, 2014
3. 2:05 p.m.—Old Business
• Report from Annual Evaluation Ad
Hoc Committee, Suggested Changes
to Board Process—Alex Puglisi,
Ashley Sanderson, Manuel Pacheco
4. 2:15 p.m.—New Business
• Consideration and Action on Draft
Recommendation 2014–02:
Institution of Measures to Help
Ensure Waste Isolation Pilot Plant
(WIPP) and Los Alamos National
Laboratory Transuranic Disposal
Operations Remain Continually
Operational
5. 2:30 p.m.—Update from Executive
Committee—Carlos Valdez, Chair
6. 2:40 p.m.—Update from DOE—Lee
Bishop, Deputy Designated Federal
Officer
• Update on WIPP Status and Issues
7. 3:15 p.m. Committee Breakout
Session
• Review Committee Work Plans for
Impacts from Changes in 3706
Campaign
• Discuss Topics for Committee
Sponsored Draft Recommendations
8. 3:45 p.m.—Public Comment Period
9. 4 p.m.—Adjourn
Public Participation: The NNMCAB’s
Committees welcome the attendance of
VerDate Mar<15>2010
22:31 Jun 19, 2014
Jkt 232001
the public at their combined committee
meeting and will make every effort to
accommodate persons with physical
disabilities or special needs. If you
require special accommodations due to
a disability, please contact Menice
Santistevan at least seven days in
advance of the meeting at the telephone
number listed above. Written statements
may be filed with the Committees either
before or after the meeting. Individuals
who wish to make oral statements
pertaining to agenda items should
contact Menice Santistevan at the
address or telephone number listed
above. Requests must be received five
days prior to the meeting and reasonable
provision will be made to include the
presentation in the agenda. The Deputy
Designated Federal Officer is
empowered to conduct the meeting in a
fashion that will facilitate the orderly
conduct of business. Individuals
wishing to make public comments will
be provided a maximum of five minutes
to present their comments.
Minutes: Minutes will be available by
writing or calling Menice Santistevan at
the address or phone number listed
above. Minutes and other Board
documents are on the Internet at: https://
www.nnmcab.energy.gov.
Issued at Washington, DC, on June 16,
2014.
LaTanya R. Butler,
Deputy Committee Management Officer.
[FR Doc. 2014–14474 Filed 6–19–14; 8:45 am]
BILLING CODE 6405–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13714–001]
El Dorado Irrigation District; Notice of
Application To Amend Exemption
(Conduit) Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Amendment
of Exemption (Conduit).
b. Project No: 13714–001.
c. Date Filed: May 22, 2014.
d. Applicant: El Dorado Irrigation
District.
e. Name of Project: Tank 7 In-Conduit
Hydroelectric Project.
f. Location: The small conduit
hydropower project would be located on
the Pleasant Oak main pipeline at the
Tank 7 storage tank in El Dorado
County, California.
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
35339
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Brian Deason,
Hydroelectric Compliance Analyst, 2890
Mosquito Road, Placerville, CA 95667,
(530) 642–4064.
i. FERC Contact: Christopher Chaney,
(202) 502–6778, christopher.chaney@
ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests, is 30
days from the issuance date of this
notice by the Commission. The
Commission strongly encourages
electronic filing. Please file any motion
to intervene, protest, comments, and/or
recommendations using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–13714–001.
k. Description of Request: El Dorado
Irrigation District proposes to amend the
exemption to reduce the number of
authorized generating units from three
to two, and reduce the installed capacity
from 590 kilowatts to 420 kilowatts. Due
to the reduction in units, El Dorado also
proposes to reduce the size of the
powerhouse and project boundary.
l. Locations of the Application: This
filing may be viewed on the
Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number P–13714 in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above and at the Commission’s Public
Reference Room, located at 888 First
Street NE., Room 2A, Washington, DC
20426, or by calling (202) 502–8371.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
E:\FR\FM\20JNN1.SGM
20JNN1
mstockstill on DSK4VPTVN1PROD with NOTICES
35340
Federal Register / Vol. 79, No. 119 / Friday, June 20, 2014 / Notices
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the license
amendment. Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: June 16, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–14468 Filed 6–19–14; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
22:31 Jun 19, 2014
Jkt 232001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–496–000]
Dominion Transmission, Inc.; Notice of
Application
Take notice that on June 2, 2014,
Dominion Transmission, Inc. (DTI), 120
Tredegar Street, Richmond, Virginia
23219, filed in Docket No. CP14–496–
000, an application pursuant to section
7(c) of the Natural Gas Act and Part 157
of the Commission’s regulations, for a
certificate of public convenience and
necessity to construct and operate
certain compression facilities located in
Marshall County, West Virginia and
Monroe County, Ohio known as the
Clarington Project.
Specifically, DTI plans to install over
16,130 of horsepower (hp) at existing
compressor stations (6, 130 hp at Burch
Ridge Stateion in Marshal County, WV
and 10,000 hp at Mullett Station in
Monroe County, OH), two meter stations
and 2,612 feet of new 20-inch diameter
suction piping and 2,756 feet of new 16inch diameter discharge piping in
Monroe County, OH. The project is
designed to provide natural gas
incremental firm transportation services
of 250,000 dekatherms per day on DTI’s
system. DTI has an initial incremental
rate to recover the costs of the Project
facilities. The estimated cost for DTI’s
construction of the project is
$76,560,748, all as more fully set forth
in the application, which is on file with
the Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to
Matthew R. Bley, Manager, Gas
Transmission Certificates, Dominion
Transmission, Inc., 701 East Cary Street,
Richmond, Virginia 23219, phone: (804)
771–4399, fax: (804) 771–4804, or email:
matthew.r.bley@dom.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
E:\FR\FM\20JNN1.SGM
20JNN1
Agencies
[Federal Register Volume 79, Number 119 (Friday, June 20, 2014)]
[Notices]
[Pages 35339-35340]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-14468]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13714-001]
El Dorado Irrigation District; Notice of Application To Amend
Exemption (Conduit) Accepted for Filing, Soliciting Comments, Motions
To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Amendment of Exemption (Conduit).
b. Project No: 13714-001.
c. Date Filed: May 22, 2014.
d. Applicant: El Dorado Irrigation District.
e. Name of Project: Tank 7 In-Conduit Hydroelectric Project.
f. Location: The small conduit hydropower project would be located
on the Pleasant Oak main pipeline at the Tank 7 storage tank in El
Dorado County, California.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Brian Deason, Hydroelectric Compliance
Analyst, 2890 Mosquito Road, Placerville, CA 95667, (530) 642-4064.
i. FERC Contact: Christopher Chaney, (202) 502-6778,
christopher.chaney@ferc.gov.
j. Deadline for filing comments, motions to intervene, and
protests, is 30 days from the issuance date of this notice by the
Commission. The Commission strongly encourages electronic filing.
Please file any motion to intervene, protest, comments, and/or
recommendations using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-13714-001.
k. Description of Request: El Dorado Irrigation District proposes
to amend the exemption to reduce the number of authorized generating
units from three to two, and reduce the installed capacity from 590
kilowatts to 420 kilowatts. Due to the reduction in units, El Dorado
also proposes to reduce the size of the powerhouse and project
boundary.
l. Locations of the Application: This filing may be viewed on the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number P-13714 in the docket number field to access
the document. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and
issuances related to this or other pending projects. For assistance,
call 1-866-208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call
(202) 502-8659. A copy is also available for inspection and
reproduction at the address in item (h) above and at the Commission's
Public Reference Room, located at 888 First Street NE., Room 2A,
Washington, DC 20426, or by calling (202) 502-8371.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
[[Page 35340]]
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to project works which are the subject of the license amendment.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
Dated: June 16, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-14468 Filed 6-19-14; 8:45 am]
BILLING CODE 6717-01-P