Notice of Effectiveness of Exempt Wholesale Generator Status, 33745 [2014-13730]

Download as PDF Federal Register / Vol. 79, No. 113 / Thursday, June 12, 2014 / Notices rmajette on DSK7SPTVN1PROD with NOTICES Filed Date: 6/3/14. Accession Number: 20140603–5129. Comments Due: 5 p.m. ET 6/24/14. Docket Numbers: ER14–2118–000. Applicants: Pheasant Run Wind II, LLC. Description: Notice of Cancellation of MBR Tariff to be effective 6/5/2014. Filed Date: 6/4/14. Accession Number: 20140604–5087. Comments Due: 5 p.m. ET 6/25/14. Docket Numbers: ER14–2119–000. Applicants: Calpine Energy Services, L.P. Description: Revised Market-Based Rate Tariff to be effective 6/5/2014. Filed Date: 6/4/14. Accession Number: 20140604–5123. Comments Due: 5 p.m. ET 6/25/14. Take notice that the Commission received the following foreign utility company status filings: Docket Numbers: FC14–14–000. Applicants: Enbridge Inc. Description: Self-Certification of Enbridge Inc. Filed Date: 6/3/14. Accession Number: 20140603–5069. Comments Due: 5 p.m. ET 6/24/14. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Copper Mountain Solar 3, LLC ................................... Campo Verde Solar, LLC ..... Lone Valley Solar Park I LLC ................................... Lone Valley Solar Park II LLC ................................... EG14–32–000 EG14–33–000 EG14–34–000 EG14–35–000 Take notice that during the month of May 2014, the status of the abovecaptioned entities as Exempt Wholesale Generators Companies became effective by operation of the Commission’s regulations. 18 CFR 366.7(a). Dated: June 6, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–13730 Filed 6–11–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14616–000] Oregon State University; Notice of Scoping Meeting and Soliciting Scoping Comments for an Applicant Prepared Environmental Assessment Using the Alternative Licensing Process a. Type of Filing: Notice of Intent to File License Application and PreApplication Document for an Original License. b. Project No.: 14616–000. c. Applicant: Oregon State University. d. Name of Project: Pacific Marine Energy Test Center South Energy Test Site. e. Location: Pacific Ocean approximately six nautical miles off the coast of Newport, Oregon on the Outer Continental Shelf. f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). g. Applicant Contact: Belinda Batten, Oregon State University, 350 Batcheller Hall, Corvallis, OR 97331; (541) 737– 9492; email at Belinda.Batten@ Dated: June 4, 2014. oregonstate.edu. Nathaniel J. Davis, Sr., h. FERC Contact: Jim Hastreiter at Deputy Secretary. (503) 552–2760; or email at [FR Doc. 2014–13668 Filed 6–11–14; 8:45 am] james.hastreiter@ferc.gov. BILLING CODE 6717–01–P i. Deadline for filing scoping comments: August 4, 2014. The Commission strongly encourages DEPARTMENT OF ENERGY electronic filing. Please file comments using the Commission’s eFiling system Federal Energy Regulatory at https://www.ferc.gov/docs-filing/ Commission efiling.asp. Commenters can submit brief comments up to 6,000 characters, Notice of Effectiveness of Exempt without prior registration, using the Wholesale Generator Status RE Camelot LLC ................... EG14–29–000 eComment system at https:// Windthorst-2, LLC ............... EG14–30–000 www.ferc.gov/docs-filing/ ecomment.asp. You must include your Spinning Spur Wind Two, LLC ................................... EG14–31–000 name and contact information at the end VerDate Mar<15>2010 21:18 Jun 11, 2014 Jkt 232001 PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 33745 of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–14616–000. j. The proposed project would consist of: (1) Four offshore test berths; (2) a maximum of 20 wave energy conversion (WEC) devices with a maximum total installed capacity of 20 megawatts; (2) various WEC devices including point absorbers, oscillating water column, overtopping, attenuator, and ‘‘other’’ types that utilize a combination of technology designs; (3) various anchoring systems including gravity based anchors, drag anchors, and embedment anchors, consisting of steel, concrete, or a mixture of steel and concrete; (4) single- or 3-point mooring systems consisting of chain, steel cables, or synthetic materials; (5) mooring infrastructure including surface buoys, subsurface floats, and chain, wire or rope, as catenary, tendon or bridle lines; (6) subsea connectors; (7) buried subsea transmission cables converging in a nearshore conduit; (8) an onshore cable landing connecting to a power monitoring and conditioning facility; (9) grid-interconnection at Central Lincoln Public Utility District substation; and (10) appurtenant facilities. k. Scoping Process: Oregon State University (OSU) intends to utilize the Federal Energy Regulatory Commission’s (Commission) alternative licensing process (ALP). Under the ALP, OSU will prepare an Applicant Prepared Environmental Assessment (APEA) and license application for the Pacific Marine Energy Test Center South Energy Test Site. OSU expects to file with the Commission, the APEA and the license application for the Pacific Marine Energy Test Center South Energy Test Site Project by December 2015. Although the Commission’s intent is to prepare an EA, there is the possibility that an Environmental Impact Statement (EIS) will be required. Nevertheless, this meeting will satisfy the NEPA scoping requirements, irrespective of whether an EA or EIS is issued by the Commission. The purpose of this notice is to inform you of the opportunity to participate in the upcoming scoping meetings and environmental site review identified below, and to solicit your scoping comments. E:\FR\FM\12JNN1.SGM 12JNN1

Agencies

[Federal Register Volume 79, Number 113 (Thursday, June 12, 2014)]
[Notices]
[Page 33745]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-13730]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Effectiveness of Exempt Wholesale Generator Status

RE Camelot LLC..........................................     EG14-29-000
Windthorst-2, LLC.......................................     EG14-30-000
Spinning Spur Wind Two, LLC.............................     EG14-31-000
Copper Mountain Solar 3, LLC............................     EG14-32-000
Campo Verde Solar, LLC..................................     EG14-33-000
Lone Valley Solar Park I LLC............................     EG14-34-000
Lone Valley Solar Park II LLC...........................     EG14-35-000
 

    Take notice that during the month of May 2014, the status of the 
above-captioned entities as Exempt Wholesale Generators Companies 
became effective by operation of the Commission's regulations. 18 CFR 
366.7(a).

    Dated: June 6, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-13730 Filed 6-11-14; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.