Notice of Effectiveness of Exempt Wholesale Generator Status, 33745 [2014-13730]
Download as PDF
Federal Register / Vol. 79, No. 113 / Thursday, June 12, 2014 / Notices
rmajette on DSK7SPTVN1PROD with NOTICES
Filed Date: 6/3/14.
Accession Number: 20140603–5129.
Comments Due: 5 p.m. ET 6/24/14.
Docket Numbers: ER14–2118–000.
Applicants: Pheasant Run Wind II,
LLC.
Description: Notice of Cancellation of
MBR Tariff to be effective 6/5/2014.
Filed Date: 6/4/14.
Accession Number: 20140604–5087.
Comments Due: 5 p.m. ET 6/25/14.
Docket Numbers: ER14–2119–000.
Applicants: Calpine Energy Services,
L.P.
Description: Revised Market-Based
Rate Tariff to be effective 6/5/2014.
Filed Date: 6/4/14.
Accession Number: 20140604–5123.
Comments Due: 5 p.m. ET 6/25/14.
Take notice that the Commission
received the following foreign utility
company status filings:
Docket Numbers: FC14–14–000.
Applicants: Enbridge Inc.
Description: Self-Certification of
Enbridge Inc.
Filed Date: 6/3/14.
Accession Number: 20140603–5069.
Comments Due: 5 p.m. ET 6/24/14.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Copper Mountain Solar 3,
LLC ...................................
Campo Verde Solar, LLC .....
Lone Valley Solar Park I
LLC ...................................
Lone Valley Solar Park II
LLC ...................................
EG14–32–000
EG14–33–000
EG14–34–000
EG14–35–000
Take notice that during the month of
May 2014, the status of the abovecaptioned entities as Exempt Wholesale
Generators Companies became effective
by operation of the Commission’s
regulations. 18 CFR 366.7(a).
Dated: June 6, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–13730 Filed 6–11–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14616–000]
Oregon State University; Notice of
Scoping Meeting and Soliciting
Scoping Comments for an Applicant
Prepared Environmental Assessment
Using the Alternative Licensing
Process
a. Type of Filing: Notice of Intent to
File License Application and PreApplication Document for an Original
License.
b. Project No.: 14616–000.
c. Applicant: Oregon State University.
d. Name of Project: Pacific Marine
Energy Test Center South Energy Test
Site.
e. Location: Pacific Ocean
approximately six nautical miles off the
coast of Newport, Oregon on the Outer
Continental Shelf.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
g. Applicant Contact: Belinda Batten,
Oregon State University, 350 Batcheller
Hall, Corvallis, OR 97331; (541) 737–
9492; email at Belinda.Batten@
Dated: June 4, 2014.
oregonstate.edu.
Nathaniel J. Davis, Sr.,
h. FERC Contact: Jim Hastreiter at
Deputy Secretary.
(503) 552–2760; or email at
[FR Doc. 2014–13668 Filed 6–11–14; 8:45 am]
james.hastreiter@ferc.gov.
BILLING CODE 6717–01–P
i. Deadline for filing scoping
comments: August 4, 2014.
The Commission strongly encourages
DEPARTMENT OF ENERGY
electronic filing. Please file comments
using the Commission’s eFiling system
Federal Energy Regulatory
at https://www.ferc.gov/docs-filing/
Commission
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
Notice of Effectiveness of Exempt
without prior registration, using the
Wholesale Generator Status
RE Camelot LLC ................... EG14–29–000 eComment system at https://
Windthorst-2, LLC ............... EG14–30–000 www.ferc.gov/docs-filing/
ecomment.asp. You must include your
Spinning Spur Wind Two,
LLC ................................... EG14–31–000 name and contact information at the end
VerDate Mar<15>2010
21:18 Jun 11, 2014
Jkt 232001
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
33745
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14616–000.
j. The proposed project would consist
of: (1) Four offshore test berths; (2) a
maximum of 20 wave energy conversion
(WEC) devices with a maximum total
installed capacity of 20 megawatts; (2)
various WEC devices including point
absorbers, oscillating water column,
overtopping, attenuator, and ‘‘other’’
types that utilize a combination of
technology designs; (3) various
anchoring systems including gravity
based anchors, drag anchors, and
embedment anchors, consisting of steel,
concrete, or a mixture of steel and
concrete; (4) single- or 3-point mooring
systems consisting of chain, steel cables,
or synthetic materials; (5) mooring
infrastructure including surface buoys,
subsurface floats, and chain, wire or
rope, as catenary, tendon or bridle lines;
(6) subsea connectors; (7) buried subsea
transmission cables converging in a
nearshore conduit; (8) an onshore cable
landing connecting to a power
monitoring and conditioning facility; (9)
grid-interconnection at Central Lincoln
Public Utility District substation; and
(10) appurtenant facilities.
k. Scoping Process:
Oregon State University (OSU)
intends to utilize the Federal Energy
Regulatory Commission’s (Commission)
alternative licensing process (ALP).
Under the ALP, OSU will prepare an
Applicant Prepared Environmental
Assessment (APEA) and license
application for the Pacific Marine
Energy Test Center South Energy Test
Site.
OSU expects to file with the
Commission, the APEA and the license
application for the Pacific Marine
Energy Test Center South Energy Test
Site Project by December 2015.
Although the Commission’s intent is to
prepare an EA, there is the possibility
that an Environmental Impact Statement
(EIS) will be required. Nevertheless, this
meeting will satisfy the NEPA scoping
requirements, irrespective of whether an
EA or EIS is issued by the Commission.
The purpose of this notice is to inform
you of the opportunity to participate in
the upcoming scoping meetings and
environmental site review identified
below, and to solicit your scoping
comments.
E:\FR\FM\12JNN1.SGM
12JNN1
Agencies
[Federal Register Volume 79, Number 113 (Thursday, June 12, 2014)]
[Notices]
[Page 33745]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-13730]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Effectiveness of Exempt Wholesale Generator Status
RE Camelot LLC.......................................... EG14-29-000
Windthorst-2, LLC....................................... EG14-30-000
Spinning Spur Wind Two, LLC............................. EG14-31-000
Copper Mountain Solar 3, LLC............................ EG14-32-000
Campo Verde Solar, LLC.................................. EG14-33-000
Lone Valley Solar Park I LLC............................ EG14-34-000
Lone Valley Solar Park II LLC........................... EG14-35-000
Take notice that during the month of May 2014, the status of the
above-captioned entities as Exempt Wholesale Generators Companies
became effective by operation of the Commission's regulations. 18 CFR
366.7(a).
Dated: June 6, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-13730 Filed 6-11-14; 8:45 am]
BILLING CODE 6717-01-P