Juneau Hydropower, Inc.; Notice of Application Tendered for Filing With the Commission, 33742 [2014-13699]
Download as PDF
33742
Federal Register / Vol. 79, No. 113 / Thursday, June 12, 2014 / Notices
Electronic Access to This Document:
The official version of this document is
the document published in the Federal
Register. Free Internet access to the
official edition of the Federal Register
and the Code of Federal Regulations is
available via the Federal Digital System
at: www.gpo.gov/fdsys. At this site you
can view this document, as well as all
other documents of this Department
published in the Federal Register, in
text or Adobe Portable Document
Format (PDF). To use PDF you must
have Adobe Acrobat Reader, which is
available free at the site. You may also
access documents of the Department
published in the Federal Register by
using the article search feature at:
www.federalregister.gov. Specifically,
through the advanced search feature at
this site, you can limit your search to
documents published by the
Department.
Dated: June 6, 2014.
Michael K. Yudin,
Acting Assistant Secretary, for Special
Education and, Rehabilitative Services.
[FR Doc. 2014–13690 Filed 6–11–14; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13563–003]
rmajette on DSK7SPTVN1PROD with NOTICES
Juneau Hydropower, Inc.; Notice of
Application Tendered for Filing With
the Commission
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Major Original
License.
b. Project No.: 13563–003.
c. Date filed: May 29, 2014.
d. Applicant: Juneau Hydropower,
Inc.
e. Name of Project: Sweetheart Lake
Hydroelectric Project.
f. Location: On Sweetheart Lake and
Sweetheart Creek in the City and
Borough of Juneau, Alaska. The project
will occupy about 2,058 acres of federal
lands located in the Tongass National
Forest administered by the United
States Forest Service.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Duff W.
Mitchell, Business Manager, Juneau
Hydropower, Inc., P.O. Box 22775,
Juneau, AK 99802; (907) 789–2775.
i. FERC Contact: John Matkowski at
(202) 502–8576, john.matkowski@
ferc.gov.
VerDate Mar<15>2010
21:18 Jun 11, 2014
Jkt 232001
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item k below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Deadline for requests for
cooperating agency status: July 28,
2014.
The Commission strongly encourages
electronic filing. Please file requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include docket
number P–13563–003.
l. The application is not ready for
environmental analysis at this time.
m. The proposed Sweetheart Lake
Project would consist of: (1) The
existing Sweetheart Lake with a surface
area of 1,702 acres and an active storage
capacity of 94,069 acre-feet at normal
maximum water elevation; (2) a 280foot-long, 111-foot-high rollercompacted concrete dam; (3) an intake
structure with a fish screen; (4) a 9,621foot-long, 15-foot-high, 15-foot-wide
unlined power tunnel conveying flow
from the project intake to the penstock;
(5) a 1,056-foot-long, 7- to 9-footdiameter penstock, the initial 896 feet of
which is located in the lower power
tunnel; (6) a 160-foot-long, 60-foot-wide
powerhouse containing three 6.6megawatt Francis generating units; (7) a
541-foot-long tailrace that will flow into
Sweetheart Creek; (8) a 25-foot-long, 5foot-wide, 4-foot-deep salmon smolt reentry pool located adjacent to the
powerhouse and tailrace; (9) a
switchyard adjacent to the powerhouse;
(10) an 8.69-mile-long, 138-kilovolt (kV)
transmission line consisting of buried,
submarine, and overhead segments; (11)
a 2.8-mile-long, 12.47-kV service line;
(12) a 4,400-foot-long access road; (13)
marine access facilities including a
dock, ramp, and landing site; (14) a
caretaker facility near the powerhouse;
(15) a shelter facility at the dam site;
and (16) appurtenant facilities. The
proposed Sweetheart Lake Project
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
would have an average annual
generation of 116 gigawatt-hours.
n. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. Procedural schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule will be made as appropriate.
Issue Notice of Acceptance/Notice of Ready
for Environmental Analysis.
Filing of Comments,
Terms and Conditions,
Recommendations and
Prescriptions.
Commission issues Draft
Environmental Impact
Statement (EIS).
Comments on draft EIS ...
Commission issues final
EIS.
November 2014.
January 2015.
August 2015.
October 2015.
March 2016.
Dated: June 5, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–13699 Filed 6–11–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC14–94–000.
Applicants: White Pine Electric
Power, L.L.C., Up Power Marketing,
LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act for Disposition of
Jurisdictional Facilities and Requests for
Expedited Consideration and
Confidential Treatment of White Pine
Electric Power L.L.C., et. al.
E:\FR\FM\12JNN1.SGM
12JNN1
Agencies
[Federal Register Volume 79, Number 113 (Thursday, June 12, 2014)]
[Notices]
[Page 33742]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-13699]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13563-003]
Juneau Hydropower, Inc.; Notice of Application Tendered for
Filing With the Commission
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Major Original License.
b. Project No.: 13563-003.
c. Date filed: May 29, 2014.
d. Applicant: Juneau Hydropower, Inc.
e. Name of Project: Sweetheart Lake Hydroelectric Project.
f. Location: On Sweetheart Lake and Sweetheart Creek in the City
and Borough of Juneau, Alaska. The project will occupy about 2,058
acres of federal lands located in the Tongass National Forest
administered by the United States Forest Service.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Duff W. Mitchell, Business Manager, Juneau
Hydropower, Inc., P.O. Box 22775, Juneau, AK 99802; (907) 789-2775.
i. FERC Contact: John Matkowski at (202) 502-8576,
john.matkowski@ferc.gov.
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item k below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Deadline for requests for cooperating agency status: July 28,
2014.
The Commission strongly encourages electronic filing. Please file
requests for cooperating agency status using the Commission's eFiling
system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance,
please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866)
208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic
filing, please send a paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426. The
first page of any filing should include docket number P-13563-003.
l. The application is not ready for environmental analysis at this
time.
m. The proposed Sweetheart Lake Project would consist of: (1) The
existing Sweetheart Lake with a surface area of 1,702 acres and an
active storage capacity of 94,069 acre-feet at normal maximum water
elevation; (2) a 280-foot-long, 111-foot-high roller-compacted concrete
dam; (3) an intake structure with a fish screen; (4) a 9,621-foot-long,
15-foot-high, 15-foot-wide unlined power tunnel conveying flow from the
project intake to the penstock; (5) a 1,056-foot-long, 7- to 9-foot-
diameter penstock, the initial 896 feet of which is located in the
lower power tunnel; (6) a 160-foot-long, 60-foot-wide powerhouse
containing three 6.6-megawatt Francis generating units; (7) a 541-foot-
long tailrace that will flow into Sweetheart Creek; (8) a 25-foot-long,
5-foot-wide, 4-foot-deep salmon smolt re-entry pool located adjacent to
the powerhouse and tailrace; (9) a switchyard adjacent to the
powerhouse; (10) an 8.69-mile-long, 138-kilovolt (kV) transmission line
consisting of buried, submarine, and overhead segments; (11) a 2.8-
mile-long, 12.47-kV service line; (12) a 4,400-foot-long access road;
(13) marine access facilities including a dock, ramp, and landing site;
(14) a caretaker facility near the powerhouse; (15) a shelter facility
at the dam site; and (16) appurtenant facilities. The proposed
Sweetheart Lake Project would have an average annual generation of 116
gigawatt-hours.
n. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
o. Procedural schedule: The application will be processed according
to the following preliminary Hydro Licensing Schedule. Revisions to the
schedule will be made as appropriate.
------------------------------------------------------------------------
------------------------------------------------------------------------
Issue Notice of Acceptance/Notice of November 2014.
Ready for Environmental Analysis.
Filing of Comments, Terms and Conditions, January 2015.
Recommendations and Prescriptions.
Commission issues Draft Environmental August 2015.
Impact Statement (EIS).
Comments on draft EIS.................... October 2015.
Commission issues final EIS.............. March 2016.
------------------------------------------------------------------------
Dated: June 5, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-13699 Filed 6-11-14; 8:45 am]
BILLING CODE 6717-01-P