Combined Notice of Filings #1, 33744-33745 [2014-13668]
Download as PDF
33744
Federal Register / Vol. 79, No. 113 / Thursday, June 12, 2014 / Notices
Comments Due: 5 p.m. ET 7/7/14.
Docket Numbers: ER14–7–000.
Federal Energy Regulatory
Applicants: American Electric Power
Commission
Service Corporation.
Description: Refund Report to be
Combined Notice of Filings #1
effective N/A.
Filed Date: 6/4/14.
Take notice that the Commission
Accession Number: 20140604–5121.
received the following electric corporate
Comments Due: 5 p.m. ET 6/25/14.
filings:
Docket Numbers: ER14–1455–001.
Docket Numbers: EC14–99–000.
Applicants: San Diego Gas & Electric
Applicants: Catalina Solar Lessee,
Company.
LLC.
Description: SDGE Generator
Description: Application for
Interconnection Procedures Compliance
Authorization under Section 203 of the
Filing to be effective 5/6/2014.
Federal Power Act and Requests for
Filed Date: 6/4/14.
Waivers, Confidential Treatment and
Accession Number: 20140604–5126.
Expedited Consideration of Catalina
Comments Due: 5 p.m. ET 6/25/14.
Solar Lessee, LLC.
Docket Numbers: ER14–1735–001.
Filed Date: 6/3/14.
Applicants: New York Independent
Accession Number: 20140603–5170.
System Operator, Inc.
Comments Due: 5 p.m. ET 6/24/14.
Description: NYISO compliance filing
Take notice that the Commission
re: 2 week notification of effective date
received the following exempt
to be effective 6/18/2014.
wholesale generator filings:
Filed Date: 6/4/14.
Docket Numbers: EG14–60–000.
Accession Number: 20140604–5118.
Applicants: Beebe 1B Renewable
Comments Due: 5 p.m. ET 6/25/14.
Energy, LLC.
Docket Numbers: ER14–1781–001.
Description: Notice of SelfApplicants: PJM Interconnection,
Certification of Exempt Wholesale
L.L.C.
Generator Status of Beebe 1B Renewable
Description: Non-Queue No. NQ89;
Energy, LLC.
Substitute Original Service Agreement
Filed Date: 6/3/14.
No. 3808 to be effective 5/6/2017.
Accession Number: 20140603–5166.
Filed Date: 6/4/14.
Comments Due: 5 p.m. ET 6/24/14.
Accession Number: 20140604–5061.
Take notice that the Commission
Comments Due: 5 p.m. ET 6/25/14.
received the following electric rate
Docket Numbers: ER14–1850–000;
filings:
ER14–1852–000; ER14–1853–000;
Docket Numbers: ER10–2564–003;
ER14–1854–000; ER14–1855–000;
ER10–2600–003; ER10–2289–003.
ER14–1856–000; ER14–1867–000;
Applicants: UNS Electric, Inc.,
ER14–1869–000; ER14–1870–000;
Tucson Electric Power Company,
ER14–1871–000; ER14–1902–000;
UniSource Energy Development
ER14–1909–000; ER14–1910–000;
Company.
ER14–1915–000; ER14–1916–000;
Description: Errata to January 21, 2014 ER14–1917–000; ER14–1918–000;
and February 7, 2014 Notice of Change
ER14–1919–000; ER14–1929–000;
in Status of Tucson Electric Power
ER14–1930–000; ER14–1932–000.
Company, et al.
Applicants: NRG Sterlington Power
Filed Date: 6/3/14.
LLC, Louisiana Generating LLC,
Accession Number: 20140603–5096.
Cottonwood Energy Company LP, Big
Comments Due: 5 p.m. ET 6/24/14.
Cajun I Peaking Power LLC, North
Docket Numbers: ER13–187–005.
Community Turbines LLC, North Wind
Applicants: Midcontinent
Turbines LLC, Larswind, LLC, Lookout
Independent System Operator, Inc.
WindPower LLC, Pinnacle Wind, LLC,
Description: 2014–06–04_Order 1000
Sierra Wind, LLC, Bendwind, LLC,
Regional Compliance Part 1 to be
Storm Lake Power Partners I LLC, TAIR
effective 6/1/2013.
Windfarm, LLC, Bayou Cove Peaking
Filed Date: 6/4/14.
Power, LLC, Forward WindPower LLC,
Accession Number: 20140604–5088.
Groen Wind, LLC, Hillcrest Wind, LLC,
Comments Due: 5 p.m. ET 7/7/14.
Jeffers Wind 20, LLC, DeGreeff DP, LLC,
Docket Numbers: ER13–187–006.
DeGreeffpa, LLC, GenOn Mid-Atlantic,
Applicants: Midcontinent
LLC.
Independent System Operator, Inc.
Description: Amendment to May 1,
Description: 2014–06–04_Order 1000
2014 through May 9, 2014 NRG
Regional Compliance Filing Part 1(2) to
Sterlington Power LLC, et al. tariff
be effective 6/1/2013.
filing(s).
Filed Date: 6/4/14.
Filed Date: 6/4/14.
Accession Number: 20140604–5115.
Accession Number: 20140604–5125.
rmajette on DSK7SPTVN1PROD with NOTICES
DEPARTMENT OF ENERGY
VerDate Mar<15>2010
21:18 Jun 11, 2014
Jkt 232001
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
Comments Due: 5 p.m. ET 6/25/14.
Docket Numbers: ER14–1912–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Amendment to May 7,
2014 Request for limited, one-time
waiver of certain provisions of its Open
Access Transmission, Energy and
Operating Reserve Markets Tariff of
Midcontinent Independent System
Operator, Inc.
Filed Date: 6/4/14.
Accession Number: 20140604–5116.
Comments Due: 5 p.m. ET 6/18/14.
Docket Numbers: ER14–2057–000.
Applicants: San Diego Gas & Electric
Company.
Description: Informational Filing of
Third Annual Transmission Rate of San
Diego Gas & Electric Company.
Filed Date: 5/28/14.
Accession Number: 20140528–5218.
Comments Due: 5 p.m. ET 6/18/14.
Docket Numbers: ER14–2113–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: 2014–06–03 Docket No.
ER14–2113–000 Interzonal Resource
Replacement Filing to be effective 8/2/
2014.
Filed Date: 6/3/14.
Accession Number: 20140603–5082.
Comments Due: 5 p.m. ET 6/24/14.
Docket Numbers: ER14–2114–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Second Revised Service
Agreement No. 2922; Queue No. W2–
090 to be effective 5/8/2014.
Filed Date: 6/3/14.
Accession Number: 20140603–5083.
Comments Due: 5 p.m. ET 6/24/14.
Docket Numbers: ER14–2115–000.
Applicants: PJM Interconnection,
L.L.C.
Description: PJM Interconnection,
L.L.C. submits tariff filing per
35.13(a)(2)(iii: Original Service
Agreement No. 3837; Queue No. X4–048
to be effective 5/6/2014.
Filed Date: 6/3/14.
Accession Number: 20140603–5110.
Comments Due: 5 p.m. ET 6/24/14.
Docket Numbers: ER14–2116–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Original Service
Agreement No. 3872; Queue No. X4–039
to be effective 5/8/2014.
Filed Date: 6/3/14.
Accession Number: 20140603–5128.
Comments Due: 5 p.m. ET 6/24/14.
Docket Numbers: ER14–2117–000.
Applicants: Spindle Hill Energy LLC.
Description: Revised Market-Based
Rate Tariff Filing to be effective 8/3/
2014.
E:\FR\FM\12JNN1.SGM
12JNN1
Federal Register / Vol. 79, No. 113 / Thursday, June 12, 2014 / Notices
rmajette on DSK7SPTVN1PROD with NOTICES
Filed Date: 6/3/14.
Accession Number: 20140603–5129.
Comments Due: 5 p.m. ET 6/24/14.
Docket Numbers: ER14–2118–000.
Applicants: Pheasant Run Wind II,
LLC.
Description: Notice of Cancellation of
MBR Tariff to be effective 6/5/2014.
Filed Date: 6/4/14.
Accession Number: 20140604–5087.
Comments Due: 5 p.m. ET 6/25/14.
Docket Numbers: ER14–2119–000.
Applicants: Calpine Energy Services,
L.P.
Description: Revised Market-Based
Rate Tariff to be effective 6/5/2014.
Filed Date: 6/4/14.
Accession Number: 20140604–5123.
Comments Due: 5 p.m. ET 6/25/14.
Take notice that the Commission
received the following foreign utility
company status filings:
Docket Numbers: FC14–14–000.
Applicants: Enbridge Inc.
Description: Self-Certification of
Enbridge Inc.
Filed Date: 6/3/14.
Accession Number: 20140603–5069.
Comments Due: 5 p.m. ET 6/24/14.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Copper Mountain Solar 3,
LLC ...................................
Campo Verde Solar, LLC .....
Lone Valley Solar Park I
LLC ...................................
Lone Valley Solar Park II
LLC ...................................
EG14–32–000
EG14–33–000
EG14–34–000
EG14–35–000
Take notice that during the month of
May 2014, the status of the abovecaptioned entities as Exempt Wholesale
Generators Companies became effective
by operation of the Commission’s
regulations. 18 CFR 366.7(a).
Dated: June 6, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–13730 Filed 6–11–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14616–000]
Oregon State University; Notice of
Scoping Meeting and Soliciting
Scoping Comments for an Applicant
Prepared Environmental Assessment
Using the Alternative Licensing
Process
a. Type of Filing: Notice of Intent to
File License Application and PreApplication Document for an Original
License.
b. Project No.: 14616–000.
c. Applicant: Oregon State University.
d. Name of Project: Pacific Marine
Energy Test Center South Energy Test
Site.
e. Location: Pacific Ocean
approximately six nautical miles off the
coast of Newport, Oregon on the Outer
Continental Shelf.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
g. Applicant Contact: Belinda Batten,
Oregon State University, 350 Batcheller
Hall, Corvallis, OR 97331; (541) 737–
9492; email at Belinda.Batten@
Dated: June 4, 2014.
oregonstate.edu.
Nathaniel J. Davis, Sr.,
h. FERC Contact: Jim Hastreiter at
Deputy Secretary.
(503) 552–2760; or email at
[FR Doc. 2014–13668 Filed 6–11–14; 8:45 am]
james.hastreiter@ferc.gov.
BILLING CODE 6717–01–P
i. Deadline for filing scoping
comments: August 4, 2014.
The Commission strongly encourages
DEPARTMENT OF ENERGY
electronic filing. Please file comments
using the Commission’s eFiling system
Federal Energy Regulatory
at https://www.ferc.gov/docs-filing/
Commission
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
Notice of Effectiveness of Exempt
without prior registration, using the
Wholesale Generator Status
RE Camelot LLC ................... EG14–29–000 eComment system at https://
Windthorst-2, LLC ............... EG14–30–000 www.ferc.gov/docs-filing/
ecomment.asp. You must include your
Spinning Spur Wind Two,
LLC ................................... EG14–31–000 name and contact information at the end
VerDate Mar<15>2010
21:18 Jun 11, 2014
Jkt 232001
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
33745
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14616–000.
j. The proposed project would consist
of: (1) Four offshore test berths; (2) a
maximum of 20 wave energy conversion
(WEC) devices with a maximum total
installed capacity of 20 megawatts; (2)
various WEC devices including point
absorbers, oscillating water column,
overtopping, attenuator, and ‘‘other’’
types that utilize a combination of
technology designs; (3) various
anchoring systems including gravity
based anchors, drag anchors, and
embedment anchors, consisting of steel,
concrete, or a mixture of steel and
concrete; (4) single- or 3-point mooring
systems consisting of chain, steel cables,
or synthetic materials; (5) mooring
infrastructure including surface buoys,
subsurface floats, and chain, wire or
rope, as catenary, tendon or bridle lines;
(6) subsea connectors; (7) buried subsea
transmission cables converging in a
nearshore conduit; (8) an onshore cable
landing connecting to a power
monitoring and conditioning facility; (9)
grid-interconnection at Central Lincoln
Public Utility District substation; and
(10) appurtenant facilities.
k. Scoping Process:
Oregon State University (OSU)
intends to utilize the Federal Energy
Regulatory Commission’s (Commission)
alternative licensing process (ALP).
Under the ALP, OSU will prepare an
Applicant Prepared Environmental
Assessment (APEA) and license
application for the Pacific Marine
Energy Test Center South Energy Test
Site.
OSU expects to file with the
Commission, the APEA and the license
application for the Pacific Marine
Energy Test Center South Energy Test
Site Project by December 2015.
Although the Commission’s intent is to
prepare an EA, there is the possibility
that an Environmental Impact Statement
(EIS) will be required. Nevertheless, this
meeting will satisfy the NEPA scoping
requirements, irrespective of whether an
EA or EIS is issued by the Commission.
The purpose of this notice is to inform
you of the opportunity to participate in
the upcoming scoping meetings and
environmental site review identified
below, and to solicit your scoping
comments.
E:\FR\FM\12JNN1.SGM
12JNN1
Agencies
[Federal Register Volume 79, Number 113 (Thursday, June 12, 2014)]
[Notices]
[Pages 33744-33745]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-13668]
[[Page 33744]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC14-99-000.
Applicants: Catalina Solar Lessee, LLC.
Description: Application for Authorization under Section 203 of the
Federal Power Act and Requests for Waivers, Confidential Treatment and
Expedited Consideration of Catalina Solar Lessee, LLC.
Filed Date: 6/3/14.
Accession Number: 20140603-5170.
Comments Due: 5 p.m. ET 6/24/14.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG14-60-000.
Applicants: Beebe 1B Renewable Energy, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Beebe 1B Renewable Energy, LLC.
Filed Date: 6/3/14.
Accession Number: 20140603-5166.
Comments Due: 5 p.m. ET 6/24/14.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2564-003; ER10-2600-003; ER10-2289-003.
Applicants: UNS Electric, Inc., Tucson Electric Power Company,
UniSource Energy Development Company.
Description: Errata to January 21, 2014 and February 7, 2014 Notice
of Change in Status of Tucson Electric Power Company, et al.
Filed Date: 6/3/14.
Accession Number: 20140603-5096.
Comments Due: 5 p.m. ET 6/24/14.
Docket Numbers: ER13-187-005.
Applicants: Midcontinent Independent System Operator, Inc.
Description: 2014-06-04--Order 1000 Regional Compliance Part 1 to
be effective 6/1/2013.
Filed Date: 6/4/14.
Accession Number: 20140604-5088.
Comments Due: 5 p.m. ET 7/7/14.
Docket Numbers: ER13-187-006.
Applicants: Midcontinent Independent System Operator, Inc.
Description: 2014-06-04--Order 1000 Regional Compliance Filing Part
1(2) to be effective 6/1/2013.
Filed Date: 6/4/14.
Accession Number: 20140604-5125.
Comments Due: 5 p.m. ET 7/7/14.
Docket Numbers: ER14-7-000.
Applicants: American Electric Power Service Corporation.
Description: Refund Report to be effective N/A.
Filed Date: 6/4/14.
Accession Number: 20140604-5121.
Comments Due: 5 p.m. ET 6/25/14.
Docket Numbers: ER14-1455-001.
Applicants: San Diego Gas & Electric Company.
Description: SDGE Generator Interconnection Procedures Compliance
Filing to be effective 5/6/2014.
Filed Date: 6/4/14.
Accession Number: 20140604-5126.
Comments Due: 5 p.m. ET 6/25/14.
Docket Numbers: ER14-1735-001.
Applicants: New York Independent System Operator, Inc.
Description: NYISO compliance filing re: 2 week notification of
effective date to be effective 6/18/2014.
Filed Date: 6/4/14.
Accession Number: 20140604-5118.
Comments Due: 5 p.m. ET 6/25/14.
Docket Numbers: ER14-1781-001.
Applicants: PJM Interconnection, L.L.C.
Description: Non-Queue No. NQ89; Substitute Original Service
Agreement No. 3808 to be effective 5/6/2017.
Filed Date: 6/4/14.
Accession Number: 20140604-5061.
Comments Due: 5 p.m. ET 6/25/14.
Docket Numbers: ER14-1850-000; ER14-1852-000; ER14-1853-000; ER14-
1854-000; ER14-1855-000; ER14-1856-000; ER14-1867-000; ER14-1869-000;
ER14-1870-000; ER14-1871-000; ER14-1902-000; ER14-1909-000; ER14-1910-
000; ER14-1915-000; ER14-1916-000; ER14-1917-000; ER14-1918-000; ER14-
1919-000; ER14-1929-000; ER14-1930-000; ER14-1932-000.
Applicants: NRG Sterlington Power LLC, Louisiana Generating LLC,
Cottonwood Energy Company LP, Big Cajun I Peaking Power LLC, North
Community Turbines LLC, North Wind Turbines LLC, Larswind, LLC, Lookout
WindPower LLC, Pinnacle Wind, LLC, Sierra Wind, LLC, Bendwind, LLC,
Storm Lake Power Partners I LLC, TAIR Windfarm, LLC, Bayou Cove Peaking
Power, LLC, Forward WindPower LLC, Groen Wind, LLC, Hillcrest Wind,
LLC, Jeffers Wind 20, LLC, DeGreeff DP, LLC, DeGreeffpa, LLC, GenOn
Mid-Atlantic, LLC.
Description: Amendment to May 1, 2014 through May 9, 2014 NRG
Sterlington Power LLC, et al. tariff filing(s).
Filed Date: 6/4/14.
Accession Number: 20140604-5115.
Comments Due: 5 p.m. ET 6/25/14.
Docket Numbers: ER14-1912-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Amendment to May 7, 2014 Request for limited, one-time
waiver of certain provisions of its Open Access Transmission, Energy
and Operating Reserve Markets Tariff of Midcontinent Independent System
Operator, Inc.
Filed Date: 6/4/14.
Accession Number: 20140604-5116.
Comments Due: 5 p.m. ET 6/18/14.
Docket Numbers: ER14-2057-000.
Applicants: San Diego Gas & Electric Company.
Description: Informational Filing of Third Annual Transmission Rate
of San Diego Gas & Electric Company.
Filed Date: 5/28/14.
Accession Number: 20140528-5218.
Comments Due: 5 p.m. ET 6/18/14.
Docket Numbers: ER14-2113-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: 2014-06-03 Docket No. ER14-2113-000 Interzonal
Resource Replacement Filing to be effective 8/2/2014.
Filed Date: 6/3/14.
Accession Number: 20140603-5082.
Comments Due: 5 p.m. ET 6/24/14.
Docket Numbers: ER14-2114-000.
Applicants: PJM Interconnection, L.L.C.
Description: Second Revised Service Agreement No. 2922; Queue No.
W2-090 to be effective 5/8/2014.
Filed Date: 6/3/14.
Accession Number: 20140603-5083.
Comments Due: 5 p.m. ET 6/24/14.
Docket Numbers: ER14-2115-000.
Applicants: PJM Interconnection, L.L.C.
Description: PJM Interconnection, L.L.C. submits tariff filing per
35.13(a)(2)(iii: Original Service Agreement No. 3837; Queue No. X4-048
to be effective 5/6/2014.
Filed Date: 6/3/14.
Accession Number: 20140603-5110.
Comments Due: 5 p.m. ET 6/24/14.
Docket Numbers: ER14-2116-000.
Applicants: PJM Interconnection, L.L.C.
Description: Original Service Agreement No. 3872; Queue No. X4-039
to be effective 5/8/2014.
Filed Date: 6/3/14.
Accession Number: 20140603-5128.
Comments Due: 5 p.m. ET 6/24/14.
Docket Numbers: ER14-2117-000.
Applicants: Spindle Hill Energy LLC.
Description: Revised Market-Based Rate Tariff Filing to be
effective 8/3/2014.
[[Page 33745]]
Filed Date: 6/3/14.
Accession Number: 20140603-5129.
Comments Due: 5 p.m. ET 6/24/14.
Docket Numbers: ER14-2118-000.
Applicants: Pheasant Run Wind II, LLC.
Description: Notice of Cancellation of MBR Tariff to be effective
6/5/2014.
Filed Date: 6/4/14.
Accession Number: 20140604-5087.
Comments Due: 5 p.m. ET 6/25/14.
Docket Numbers: ER14-2119-000.
Applicants: Calpine Energy Services, L.P.
Description: Revised Market-Based Rate Tariff to be effective 6/5/
2014.
Filed Date: 6/4/14.
Accession Number: 20140604-5123.
Comments Due: 5 p.m. ET 6/25/14.
Take notice that the Commission received the following foreign
utility company status filings:
Docket Numbers: FC14-14-000.
Applicants: Enbridge Inc.
Description: Self-Certification of Enbridge Inc.
Filed Date: 6/3/14.
Accession Number: 20140603-5069.
Comments Due: 5 p.m. ET 6/24/14.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: June 4, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014-13668 Filed 6-11-14; 8:45 am]
BILLING CODE 6717-01-P