Combined Notice of Filings #1, 33744-33745 [2014-13668]

Download as PDF 33744 Federal Register / Vol. 79, No. 113 / Thursday, June 12, 2014 / Notices Comments Due: 5 p.m. ET 7/7/14. Docket Numbers: ER14–7–000. Federal Energy Regulatory Applicants: American Electric Power Commission Service Corporation. Description: Refund Report to be Combined Notice of Filings #1 effective N/A. Filed Date: 6/4/14. Take notice that the Commission Accession Number: 20140604–5121. received the following electric corporate Comments Due: 5 p.m. ET 6/25/14. filings: Docket Numbers: ER14–1455–001. Docket Numbers: EC14–99–000. Applicants: San Diego Gas & Electric Applicants: Catalina Solar Lessee, Company. LLC. Description: SDGE Generator Description: Application for Interconnection Procedures Compliance Authorization under Section 203 of the Filing to be effective 5/6/2014. Federal Power Act and Requests for Filed Date: 6/4/14. Waivers, Confidential Treatment and Accession Number: 20140604–5126. Expedited Consideration of Catalina Comments Due: 5 p.m. ET 6/25/14. Solar Lessee, LLC. Docket Numbers: ER14–1735–001. Filed Date: 6/3/14. Applicants: New York Independent Accession Number: 20140603–5170. System Operator, Inc. Comments Due: 5 p.m. ET 6/24/14. Description: NYISO compliance filing Take notice that the Commission re: 2 week notification of effective date received the following exempt to be effective 6/18/2014. wholesale generator filings: Filed Date: 6/4/14. Docket Numbers: EG14–60–000. Accession Number: 20140604–5118. Applicants: Beebe 1B Renewable Comments Due: 5 p.m. ET 6/25/14. Energy, LLC. Docket Numbers: ER14–1781–001. Description: Notice of SelfApplicants: PJM Interconnection, Certification of Exempt Wholesale L.L.C. Generator Status of Beebe 1B Renewable Description: Non-Queue No. NQ89; Energy, LLC. Substitute Original Service Agreement Filed Date: 6/3/14. No. 3808 to be effective 5/6/2017. Accession Number: 20140603–5166. Filed Date: 6/4/14. Comments Due: 5 p.m. ET 6/24/14. Accession Number: 20140604–5061. Take notice that the Commission Comments Due: 5 p.m. ET 6/25/14. received the following electric rate Docket Numbers: ER14–1850–000; filings: ER14–1852–000; ER14–1853–000; Docket Numbers: ER10–2564–003; ER14–1854–000; ER14–1855–000; ER10–2600–003; ER10–2289–003. ER14–1856–000; ER14–1867–000; Applicants: UNS Electric, Inc., ER14–1869–000; ER14–1870–000; Tucson Electric Power Company, ER14–1871–000; ER14–1902–000; UniSource Energy Development ER14–1909–000; ER14–1910–000; Company. ER14–1915–000; ER14–1916–000; Description: Errata to January 21, 2014 ER14–1917–000; ER14–1918–000; and February 7, 2014 Notice of Change ER14–1919–000; ER14–1929–000; in Status of Tucson Electric Power ER14–1930–000; ER14–1932–000. Company, et al. Applicants: NRG Sterlington Power Filed Date: 6/3/14. LLC, Louisiana Generating LLC, Accession Number: 20140603–5096. Cottonwood Energy Company LP, Big Comments Due: 5 p.m. ET 6/24/14. Cajun I Peaking Power LLC, North Docket Numbers: ER13–187–005. Community Turbines LLC, North Wind Applicants: Midcontinent Turbines LLC, Larswind, LLC, Lookout Independent System Operator, Inc. WindPower LLC, Pinnacle Wind, LLC, Description: 2014–06–04_Order 1000 Sierra Wind, LLC, Bendwind, LLC, Regional Compliance Part 1 to be Storm Lake Power Partners I LLC, TAIR effective 6/1/2013. Windfarm, LLC, Bayou Cove Peaking Filed Date: 6/4/14. Power, LLC, Forward WindPower LLC, Accession Number: 20140604–5088. Groen Wind, LLC, Hillcrest Wind, LLC, Comments Due: 5 p.m. ET 7/7/14. Jeffers Wind 20, LLC, DeGreeff DP, LLC, Docket Numbers: ER13–187–006. DeGreeffpa, LLC, GenOn Mid-Atlantic, Applicants: Midcontinent LLC. Independent System Operator, Inc. Description: Amendment to May 1, Description: 2014–06–04_Order 1000 2014 through May 9, 2014 NRG Regional Compliance Filing Part 1(2) to Sterlington Power LLC, et al. tariff be effective 6/1/2013. filing(s). Filed Date: 6/4/14. Filed Date: 6/4/14. Accession Number: 20140604–5115. Accession Number: 20140604–5125. rmajette on DSK7SPTVN1PROD with NOTICES DEPARTMENT OF ENERGY VerDate Mar<15>2010 21:18 Jun 11, 2014 Jkt 232001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 Comments Due: 5 p.m. ET 6/25/14. Docket Numbers: ER14–1912–000. Applicants: Midcontinent Independent System Operator, Inc. Description: Amendment to May 7, 2014 Request for limited, one-time waiver of certain provisions of its Open Access Transmission, Energy and Operating Reserve Markets Tariff of Midcontinent Independent System Operator, Inc. Filed Date: 6/4/14. Accession Number: 20140604–5116. Comments Due: 5 p.m. ET 6/18/14. Docket Numbers: ER14–2057–000. Applicants: San Diego Gas & Electric Company. Description: Informational Filing of Third Annual Transmission Rate of San Diego Gas & Electric Company. Filed Date: 5/28/14. Accession Number: 20140528–5218. Comments Due: 5 p.m. ET 6/18/14. Docket Numbers: ER14–2113–000. Applicants: Midcontinent Independent System Operator, Inc. Description: 2014–06–03 Docket No. ER14–2113–000 Interzonal Resource Replacement Filing to be effective 8/2/ 2014. Filed Date: 6/3/14. Accession Number: 20140603–5082. Comments Due: 5 p.m. ET 6/24/14. Docket Numbers: ER14–2114–000. Applicants: PJM Interconnection, L.L.C. Description: Second Revised Service Agreement No. 2922; Queue No. W2– 090 to be effective 5/8/2014. Filed Date: 6/3/14. Accession Number: 20140603–5083. Comments Due: 5 p.m. ET 6/24/14. Docket Numbers: ER14–2115–000. Applicants: PJM Interconnection, L.L.C. Description: PJM Interconnection, L.L.C. submits tariff filing per 35.13(a)(2)(iii: Original Service Agreement No. 3837; Queue No. X4–048 to be effective 5/6/2014. Filed Date: 6/3/14. Accession Number: 20140603–5110. Comments Due: 5 p.m. ET 6/24/14. Docket Numbers: ER14–2116–000. Applicants: PJM Interconnection, L.L.C. Description: Original Service Agreement No. 3872; Queue No. X4–039 to be effective 5/8/2014. Filed Date: 6/3/14. Accession Number: 20140603–5128. Comments Due: 5 p.m. ET 6/24/14. Docket Numbers: ER14–2117–000. Applicants: Spindle Hill Energy LLC. Description: Revised Market-Based Rate Tariff Filing to be effective 8/3/ 2014. E:\FR\FM\12JNN1.SGM 12JNN1 Federal Register / Vol. 79, No. 113 / Thursday, June 12, 2014 / Notices rmajette on DSK7SPTVN1PROD with NOTICES Filed Date: 6/3/14. Accession Number: 20140603–5129. Comments Due: 5 p.m. ET 6/24/14. Docket Numbers: ER14–2118–000. Applicants: Pheasant Run Wind II, LLC. Description: Notice of Cancellation of MBR Tariff to be effective 6/5/2014. Filed Date: 6/4/14. Accession Number: 20140604–5087. Comments Due: 5 p.m. ET 6/25/14. Docket Numbers: ER14–2119–000. Applicants: Calpine Energy Services, L.P. Description: Revised Market-Based Rate Tariff to be effective 6/5/2014. Filed Date: 6/4/14. Accession Number: 20140604–5123. Comments Due: 5 p.m. ET 6/25/14. Take notice that the Commission received the following foreign utility company status filings: Docket Numbers: FC14–14–000. Applicants: Enbridge Inc. Description: Self-Certification of Enbridge Inc. Filed Date: 6/3/14. Accession Number: 20140603–5069. Comments Due: 5 p.m. ET 6/24/14. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Copper Mountain Solar 3, LLC ................................... Campo Verde Solar, LLC ..... Lone Valley Solar Park I LLC ................................... Lone Valley Solar Park II LLC ................................... EG14–32–000 EG14–33–000 EG14–34–000 EG14–35–000 Take notice that during the month of May 2014, the status of the abovecaptioned entities as Exempt Wholesale Generators Companies became effective by operation of the Commission’s regulations. 18 CFR 366.7(a). Dated: June 6, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–13730 Filed 6–11–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14616–000] Oregon State University; Notice of Scoping Meeting and Soliciting Scoping Comments for an Applicant Prepared Environmental Assessment Using the Alternative Licensing Process a. Type of Filing: Notice of Intent to File License Application and PreApplication Document for an Original License. b. Project No.: 14616–000. c. Applicant: Oregon State University. d. Name of Project: Pacific Marine Energy Test Center South Energy Test Site. e. Location: Pacific Ocean approximately six nautical miles off the coast of Newport, Oregon on the Outer Continental Shelf. f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). g. Applicant Contact: Belinda Batten, Oregon State University, 350 Batcheller Hall, Corvallis, OR 97331; (541) 737– 9492; email at Belinda.Batten@ Dated: June 4, 2014. oregonstate.edu. Nathaniel J. Davis, Sr., h. FERC Contact: Jim Hastreiter at Deputy Secretary. (503) 552–2760; or email at [FR Doc. 2014–13668 Filed 6–11–14; 8:45 am] james.hastreiter@ferc.gov. BILLING CODE 6717–01–P i. Deadline for filing scoping comments: August 4, 2014. The Commission strongly encourages DEPARTMENT OF ENERGY electronic filing. Please file comments using the Commission’s eFiling system Federal Energy Regulatory at https://www.ferc.gov/docs-filing/ Commission efiling.asp. Commenters can submit brief comments up to 6,000 characters, Notice of Effectiveness of Exempt without prior registration, using the Wholesale Generator Status RE Camelot LLC ................... EG14–29–000 eComment system at https:// Windthorst-2, LLC ............... EG14–30–000 www.ferc.gov/docs-filing/ ecomment.asp. You must include your Spinning Spur Wind Two, LLC ................................... EG14–31–000 name and contact information at the end VerDate Mar<15>2010 21:18 Jun 11, 2014 Jkt 232001 PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 33745 of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–14616–000. j. The proposed project would consist of: (1) Four offshore test berths; (2) a maximum of 20 wave energy conversion (WEC) devices with a maximum total installed capacity of 20 megawatts; (2) various WEC devices including point absorbers, oscillating water column, overtopping, attenuator, and ‘‘other’’ types that utilize a combination of technology designs; (3) various anchoring systems including gravity based anchors, drag anchors, and embedment anchors, consisting of steel, concrete, or a mixture of steel and concrete; (4) single- or 3-point mooring systems consisting of chain, steel cables, or synthetic materials; (5) mooring infrastructure including surface buoys, subsurface floats, and chain, wire or rope, as catenary, tendon or bridle lines; (6) subsea connectors; (7) buried subsea transmission cables converging in a nearshore conduit; (8) an onshore cable landing connecting to a power monitoring and conditioning facility; (9) grid-interconnection at Central Lincoln Public Utility District substation; and (10) appurtenant facilities. k. Scoping Process: Oregon State University (OSU) intends to utilize the Federal Energy Regulatory Commission’s (Commission) alternative licensing process (ALP). Under the ALP, OSU will prepare an Applicant Prepared Environmental Assessment (APEA) and license application for the Pacific Marine Energy Test Center South Energy Test Site. OSU expects to file with the Commission, the APEA and the license application for the Pacific Marine Energy Test Center South Energy Test Site Project by December 2015. Although the Commission’s intent is to prepare an EA, there is the possibility that an Environmental Impact Statement (EIS) will be required. Nevertheless, this meeting will satisfy the NEPA scoping requirements, irrespective of whether an EA or EIS is issued by the Commission. The purpose of this notice is to inform you of the opportunity to participate in the upcoming scoping meetings and environmental site review identified below, and to solicit your scoping comments. E:\FR\FM\12JNN1.SGM 12JNN1

Agencies

[Federal Register Volume 79, Number 113 (Thursday, June 12, 2014)]
[Notices]
[Pages 33744-33745]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-13668]



[[Page 33744]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings 1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC14-99-000.
    Applicants: Catalina Solar Lessee, LLC.
    Description: Application for Authorization under Section 203 of the 
Federal Power Act and Requests for Waivers, Confidential Treatment and 
Expedited Consideration of Catalina Solar Lessee, LLC.
    Filed Date: 6/3/14.
    Accession Number: 20140603-5170.
    Comments Due: 5 p.m. ET 6/24/14.

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG14-60-000.
    Applicants: Beebe 1B Renewable Energy, LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status of Beebe 1B Renewable Energy, LLC.
    Filed Date: 6/3/14.
    Accession Number: 20140603-5166.
    Comments Due: 5 p.m. ET 6/24/14.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-2564-003; ER10-2600-003; ER10-2289-003.
    Applicants: UNS Electric, Inc., Tucson Electric Power Company, 
UniSource Energy Development Company.
    Description: Errata to January 21, 2014 and February 7, 2014 Notice 
of Change in Status of Tucson Electric Power Company, et al.
    Filed Date: 6/3/14.
    Accession Number: 20140603-5096.
    Comments Due: 5 p.m. ET 6/24/14.

    Docket Numbers: ER13-187-005.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: 2014-06-04--Order 1000 Regional Compliance Part 1 to 
be effective 6/1/2013.
    Filed Date: 6/4/14.
    Accession Number: 20140604-5088.
    Comments Due: 5 p.m. ET 7/7/14.

    Docket Numbers: ER13-187-006.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: 2014-06-04--Order 1000 Regional Compliance Filing Part 
1(2) to be effective 6/1/2013.
    Filed Date: 6/4/14.
    Accession Number: 20140604-5125.
    Comments Due: 5 p.m. ET 7/7/14.

    Docket Numbers: ER14-7-000.
    Applicants: American Electric Power Service Corporation.
    Description: Refund Report to be effective N/A.
    Filed Date: 6/4/14.
    Accession Number: 20140604-5121.
    Comments Due: 5 p.m. ET 6/25/14.

    Docket Numbers: ER14-1455-001.
    Applicants: San Diego Gas & Electric Company.
    Description: SDGE Generator Interconnection Procedures Compliance 
Filing to be effective 5/6/2014.
    Filed Date: 6/4/14.
    Accession Number: 20140604-5126.
    Comments Due: 5 p.m. ET 6/25/14.

    Docket Numbers: ER14-1735-001.
    Applicants: New York Independent System Operator, Inc.
    Description: NYISO compliance filing re: 2 week notification of 
effective date to be effective 6/18/2014.
    Filed Date: 6/4/14.
    Accession Number: 20140604-5118.
    Comments Due: 5 p.m. ET 6/25/14.

    Docket Numbers: ER14-1781-001.
    Applicants: PJM Interconnection, L.L.C.
    Description: Non-Queue No. NQ89; Substitute Original Service 
Agreement No. 3808 to be effective 5/6/2017.
    Filed Date: 6/4/14.
    Accession Number: 20140604-5061.
    Comments Due: 5 p.m. ET 6/25/14.

    Docket Numbers: ER14-1850-000; ER14-1852-000; ER14-1853-000; ER14-
1854-000; ER14-1855-000; ER14-1856-000; ER14-1867-000; ER14-1869-000; 
ER14-1870-000; ER14-1871-000; ER14-1902-000; ER14-1909-000; ER14-1910-
000; ER14-1915-000; ER14-1916-000; ER14-1917-000; ER14-1918-000; ER14-
1919-000; ER14-1929-000; ER14-1930-000; ER14-1932-000.
    Applicants: NRG Sterlington Power LLC, Louisiana Generating LLC, 
Cottonwood Energy Company LP, Big Cajun I Peaking Power LLC, North 
Community Turbines LLC, North Wind Turbines LLC, Larswind, LLC, Lookout 
WindPower LLC, Pinnacle Wind, LLC, Sierra Wind, LLC, Bendwind, LLC, 
Storm Lake Power Partners I LLC, TAIR Windfarm, LLC, Bayou Cove Peaking 
Power, LLC, Forward WindPower LLC, Groen Wind, LLC, Hillcrest Wind, 
LLC, Jeffers Wind 20, LLC, DeGreeff DP, LLC, DeGreeffpa, LLC, GenOn 
Mid-Atlantic, LLC.
    Description: Amendment to May 1, 2014 through May 9, 2014 NRG 
Sterlington Power LLC, et al. tariff filing(s).
    Filed Date: 6/4/14.
    Accession Number: 20140604-5115.
    Comments Due: 5 p.m. ET 6/25/14.

    Docket Numbers: ER14-1912-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Amendment to May 7, 2014 Request for limited, one-time 
waiver of certain provisions of its Open Access Transmission, Energy 
and Operating Reserve Markets Tariff of Midcontinent Independent System 
Operator, Inc.
    Filed Date: 6/4/14.
    Accession Number: 20140604-5116.
    Comments Due: 5 p.m. ET 6/18/14.

    Docket Numbers: ER14-2057-000.
    Applicants: San Diego Gas & Electric Company.
    Description: Informational Filing of Third Annual Transmission Rate 
of San Diego Gas & Electric Company.
    Filed Date: 5/28/14.
    Accession Number: 20140528-5218.
    Comments Due: 5 p.m. ET 6/18/14.

    Docket Numbers: ER14-2113-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: 2014-06-03 Docket No. ER14-2113-000 Interzonal 
Resource Replacement Filing to be effective 8/2/2014.
    Filed Date: 6/3/14.
    Accession Number: 20140603-5082.
    Comments Due: 5 p.m. ET 6/24/14.

    Docket Numbers: ER14-2114-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Second Revised Service Agreement No. 2922; Queue No. 
W2-090 to be effective 5/8/2014.
    Filed Date: 6/3/14.
    Accession Number: 20140603-5083.
    Comments Due: 5 p.m. ET 6/24/14.

    Docket Numbers: ER14-2115-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: PJM Interconnection, L.L.C. submits tariff filing per 
35.13(a)(2)(iii: Original Service Agreement No. 3837; Queue No. X4-048 
to be effective 5/6/2014.
    Filed Date: 6/3/14.
    Accession Number: 20140603-5110.
    Comments Due: 5 p.m. ET 6/24/14.

    Docket Numbers: ER14-2116-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Original Service Agreement No. 3872; Queue No. X4-039 
to be effective 5/8/2014.
    Filed Date: 6/3/14.
    Accession Number: 20140603-5128.
    Comments Due: 5 p.m. ET 6/24/14.

    Docket Numbers: ER14-2117-000.
    Applicants: Spindle Hill Energy LLC.
    Description: Revised Market-Based Rate Tariff Filing to be 
effective 8/3/2014.

[[Page 33745]]

    Filed Date: 6/3/14.
    Accession Number: 20140603-5129.
    Comments Due: 5 p.m. ET 6/24/14.

    Docket Numbers: ER14-2118-000.
    Applicants: Pheasant Run Wind II, LLC.
    Description: Notice of Cancellation of MBR Tariff to be effective 
6/5/2014.
    Filed Date: 6/4/14.
    Accession Number: 20140604-5087.
    Comments Due: 5 p.m. ET 6/25/14.

    Docket Numbers: ER14-2119-000.
    Applicants: Calpine Energy Services, L.P.
    Description: Revised Market-Based Rate Tariff to be effective 6/5/
2014.
    Filed Date: 6/4/14.
    Accession Number: 20140604-5123.
    Comments Due: 5 p.m. ET 6/25/14.

    Take notice that the Commission received the following foreign 
utility company status filings:

    Docket Numbers: FC14-14-000.
    Applicants: Enbridge Inc.
    Description: Self-Certification of Enbridge Inc.
    Filed Date: 6/3/14.
    Accession Number: 20140603-5069.
    Comments Due: 5 p.m. ET 6/24/14.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: June 4, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014-13668 Filed 6-11-14; 8:45 am]