Federal Register / Vol. 79, No. 110 / Monday, June 9, 2014 / Notices
which are the subject of the amendment
application. Agencies may obtain copies
of the application directly from the
applicant. A copy of any motion to
intervene or protest must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: June 3, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014–13364 Filed 6–6–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14276–001; Docket No. AD13–
9–000]
ehiers on DSK2VPTVN1PROD with NOTICES
Free Flow Power Project 92, LLC;
Notice of Intent To File License
Application; Filing of Pre-Application
Document (PAD), and Request To Test
a Two-Year Licensing Process
a. Type of Filing: Notice of Intent to
File License Application for an Original
License and a request to be selected as
a pilot project to test a two-year
licensing process.
b. Project No.: 14276–001.
c. Dated Filed: May 5, 2014.
d. Submitted By: Free Flow Power
Project 92, LLC (FFP).
e. Name of Project: Kentucky River
Lock & Dam No. 11 Hydroelectric
Project.
f. Location: On the Kentucky River in
Estill and Madison Counties, Kentucky.
No federal land would be occupied by
project features or located within the
project boundary.
g. Filed Pursuant to: 18 CFR Part 5 of
the Commission’s Regulations and
Hydropower Regulatory Efficiency Act
of 2013.
h. Potential Applicant Contact: Dan
Lissner, Free Flow Power Corporation,
239 Causeway Street, Suite 300, Boston,
MA 02114; (978) 252–7111; email—
dlissner@free-flow-power.com.
VerDate Mar<15>2010
15:08 Jun 06, 2014
Jkt 232001
i. FERC Contact: Sarah Salazar at
(202) 502–6863, or email at
sarah.salazar@ferc.gov.
j. FFP has filed with the Commission:
(1) A notice of intent (NOI) to file an
application for an original license; (2) a
Pre-Application Document (PAD) with a
proposed process plan and schedule; (3)
a list of environmental issues associated
with the project proposal; (4) proposed
studies to acquire information to
include in a license application; and (5)
a request to be selected as a pilot project
to test a two-year licensing process,
pursuant to the requirements identified
in the Commission’s January 6, 2014
notice soliciting pilot projects.
k. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
This notice is being distributed to
both the applicant’s distribution list and
the Commission’s official mailing list. If
you wish to be added to or removed
from the Commission’s official mailing
list, please send your request by email
to efiling@ferc.gov or by mail to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Room 1A, Washington,
DC 20426. All written or emailed
requests must specify your wish to be
removed from or added to the mailing
list and must clearly identify the
following on the first page: Lock & Dam
No. 11 Hydroelectric Project No. 14276–
001.
l. The proposed project would use the
Kentucky River Authority’s (KRA)
existing Kentucky River Lock & Dam
No. 11, and be operated as a run-of-river
facility using existing flows while
maintaining current water surface
elevations in the upstream pool. The
proposed project would include: (1) The
existing 579-acre reservoir, with a
normal pool elevation of 585.60 feet
North American Vertical Datum of 1988;
(2) a new 3.5-foot-high adjustable crest
gate attached to the top of the existing
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
32929
208-foot-long, 35-foot-high fixed crest
dam; (3) a new 275-foot-long, 75-footwide reinforced concrete intake channel
equipped with 3-inch bar spacing
trashracks; (4) a new 140-foot-long, 64.5foot-wide powerhouse built within the
existing lock structure, with two
horizontal Kaplan turbine generator
units each rated at 2.5 megawatts (MW)
for a total installed capacity of 5 MW;
(5) a new 190-foot-long, 78-foot-wide
tailrace; (6) a new substation; (7) a new,
approximately 4.5-mile-long, 69-kilovolt
transmission line extending from the
powerhouse to an existing substation
located near Waco, Kentucky; and (8)
appurtenant facilities. The proposed
project would generate about 18.5
gigawatt-hours annually, which would
be sold to a local utility.
m. With this notice, we are soliciting
comments on the use of the two-year
license process for this project. We are
also soliciting comments on the PAD,
the list of environmental issues, the
proposed studies, and study requests.
Any request for additional studies or
modifications to the proposed studies
must conform to the requirements in 18
CFR 5.9(b) of the Commission’s
regulations.
All comments and study requests
should be sent to the address above in
paragraph h and must be filed with the
Commission. The Commission strongly
encourages electronic filing. Please file
all documents using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov. In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
All filings with the Commission must
include on the first page, the project
name (Kentucky River Lock & Dam No.
11 Hydroelectric Project) and number
(P–14276–001), as well as docket
number AD13–9–000, and bear the
appropriate heading: ‘‘Comments on
Pre-Application Document,’’
‘‘Comments on the Use of the Two-Year
Process,’’ ‘‘Comments on List of
Potential Environmental Effects for
Environmental Analysis,’’ or
‘‘Comments on Proposed Study Plan.’’
Comments and study requests must be
filed by July 3, 2014.
n. Commission staff will hold a
technical meeting via teleconference to
E:\FR\FM\09JNN1.SGM
09JNN1
32930
Federal Register / Vol. 79, No. 110 / Monday, June 9, 2014 / Notices
discuss the identified issues and study
needs, as well as discuss the process
plan and schedule. The technical
meeting will focus on the information
gaps that need to be filled to ensure that
sufficient information exists for the
Commission to make a determination on
whether the proposed project meets the
criteria for a pilot project and for
processing a license application once it
is filed with the Commission. All
interested individuals, organizations,
and agencies are invited to participate
in the technical meeting. A summary of
the meeting will be placed in the public
records of the project. The time of the
meeting will be Thursday, June 19,
2014, at 1:30 p.m. Anyone wanting to
participate in the meeting should
contact Sarah Salazar, using the contact
information provided above in
paragraph i, for teleconference call-in
instructions by June 13, 2014.
Dated: June 3, 2014.
Kimberly D. Bose,
Secretary.
i. FERC Contact: Adam Beeco, 202–
502–8655 or adam.beeco@ferc.gov.
Environmental Site Review
The applicants and FERC staff will
conduct an Environmental Site Review
of the recreational facilities associated
with the project beginning at 10:00 a.m.
on June 17, 2014. The review will
consist of visiting Fleming Meadows
Recreation Area, Blue Oaks Recreation
Area, Moccasin Point Recreation Area,
and Ward’s Ferry Whitewater Boating
Take-Out Facility. All interested
individuals, organizations, and agencies
are invited to attend. All participants
should meet at the Don Pedro
Recreation Agency Visitor Center
located at 10201 Bonds Flat Road in La
Grange, California.
All participants are responsible for
their own transportation to and around
the site. Anyone with questions about
the Environmental Site Review should
contact Adam Beeco at 202–502–8655.
Dated: June 2, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–13354 Filed 6–6–14; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2014–13353 Filed 6–6–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2299–082]
ehiers on DSK2VPTVN1PROD with NOTICES
Turlock Irrigation District; Modesto
Irrigation District; Notice of
Environmental Site Review
Combined Notice of Filings #1
Take notice that the following
hydroelectric applications have been
filed with Commission and are available
for public inspection:
a. Type of Application: New License.
b. Project No.: 2299–082.
c. Date filed: April 28, 2014.
d. Applicant: Turlock Irrigation
District and Modesto Irrigation District.
e. Name of Project: Don Pedro
Hydroelectric Project.
f. Location: The existing project is
located on the Tuolumne River in
Tuolumne County, California. The
project would occupy federal land
managed by the Bureau of Land
Management Sierra Resource
Management Unit.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Steven Boyd,
Director of Water Resources, Turlock
Irrigation District, P.O. Box 949,
Turlock, California 95381, 209–883–
8364 and Greg Dias, Project Manager,
Modesto Irrigation District, P.O. Box
4060, Modesto, California 95352, 209–
526–7566
VerDate Mar<15>2010
17:28 Jun 06, 2014
Jkt 232001
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–3297–004.
Applicants: Powerex Corp.
Description: Notice of Non-Material
Change in Status of Powerex Corp.
Filed Date: 5/29/14.
Accession Number: 20140529–5099.
Comments Due: 5 p.m. ET 6/19/14.
Docket Numbers: ER14–1651–001.
Applicants: Public Service Company
of New Hampshire.
Description: Errata Rate Schedule No.
104 Wholesale Distribution Service
Central Maine Power to be effective 6/
1/2014.
Filed Date: 5/28/14.
Accession Number: 20140528–5177.
Comments Due: 5 p.m. ET 6/18/14.
Docket Numbers: ER14–2053–000.
Applicants: Interstate Power and
Light Company.
Description: IPL Changes in
Depreciation Rates for Wholesale
Production Service to be effective 7/1/
2014.
Filed Date: 5/28/14.
Accession Number: 20140528–5184.
Comments Due: 5 p.m. ET 6/18/14.
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
Docket Numbers: ER14–2054–000.
Applicants: Southern California
Edison Company.
Description: GIA & Distribution
Service Agmt with Adelanto Solar II,
LLC to be effective 5/30/2014.
Filed Date: 5/29/14.
Accession Number: 20140529–5000.
Comments Due: 5 p.m. ET 6/19/14.
Docket Numbers: ER14–2055–000.
Applicants: Southern California
Edison Company.
Description: GIA & Distribution
Service Agmt with SunEdison Utility
Solutions, LLC to be effective 5/30/
2014.
Filed Date: 5/29/14.
Accession Number: 20140529–5002.
Comments Due: 5 p.m. ET 6/19/14.
Docket Numbers: ER14–2056–000.
Applicants: Erie Power, LLC.
Description: Request of Erie Power,
LLC for Limited Tariff Waiver,
Expedited Consideration and
Commission Action.
Filed Date: 5/28/14.
Accession Number: 20140528–5210.
Comments Due: 5 p.m. ET 6/18/14.
Docket Numbers: ER14–2058–000.
Applicants: PacifiCorp.
Description: OATT Revised Schedules
3 & 3A Order 784–A Clarification to be
effective 8/1/2014.
Filed Date: 5/29/14.
Accession Number: 20140529–5158.
Comments Due: 5 p.m. ET 6/19/14.
Docket Numbers: ER14–2059–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: 2014–05–29_MISO–SPP
JOA Sec 3.3 Att 3 Amendment to be
effective 5/30/2014.
Filed Date: 5/29/14.
Accession Number: 20140529–5175.
Comments Due: 5 p.m. ET 6/19/14.
Docket Numbers: ER14–2060–000.
Applicants: Broken Bow Wind, LLC.
Description: Common Facilities
Agreement to be effective 7/28/2014.
Filed Date: 5/29/14.
Accession Number: 20140529–5176.
Comments Due: 5 p.m. ET 6/19/14.
Docket Numbers: ER14–2061–000.
Applicants: Ameren Illinois
Company.
Description: Sectionalizing Switch
Replacement Letter Agreement with
NEC to be effective 5/20/2014.
Filed Date: 5/29/14.
Accession Number: 20140529–5211.
Comments Due: 5 p.m. ET 6/19/14.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
E:\FR\FM\09JNN1.SGM
09JNN1
Agencies
[Federal Register Volume 79, Number 110 (Monday, June 9, 2014)]
[Notices]
[Pages 32929-32930]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-13354]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14276-001; Docket No. AD13-9-000]
Free Flow Power Project 92, LLC; Notice of Intent To File License
Application; Filing of Pre-Application Document (PAD), and Request To
Test a Two-Year Licensing Process
a. Type of Filing: Notice of Intent to File License Application for
an Original License and a request to be selected as a pilot project to
test a two-year licensing process.
b. Project No.: 14276-001.
c. Dated Filed: May 5, 2014.
d. Submitted By: Free Flow Power Project 92, LLC (FFP).
e. Name of Project: Kentucky River Lock & Dam No. 11 Hydroelectric
Project.
f. Location: On the Kentucky River in Estill and Madison Counties,
Kentucky. No federal land would be occupied by project features or
located within the project boundary.
g. Filed Pursuant to: 18 CFR Part 5 of the Commission's Regulations
and Hydropower Regulatory Efficiency Act of 2013.
h. Potential Applicant Contact: Dan Lissner, Free Flow Power
Corporation, 239 Causeway Street, Suite 300, Boston, MA 02114; (978)
252-7111; email_dlissner@free-flow-power.com.
i. FERC Contact: Sarah Salazar at (202) 502-6863, or email at
sarah.salazar@ferc.gov.
j. FFP has filed with the Commission: (1) A notice of intent (NOI)
to file an application for an original license; (2) a Pre-Application
Document (PAD) with a proposed process plan and schedule; (3) a list of
environmental issues associated with the project proposal; (4) proposed
studies to acquire information to include in a license application; and
(5) a request to be selected as a pilot project to test a two-year
licensing process, pursuant to the requirements identified in the
Commission's January 6, 2014 notice soliciting pilot projects.
k. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's Web site
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCONlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in paragraph h.
Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
This notice is being distributed to both the applicant's
distribution list and the Commission's official mailing list. If you
wish to be added to or removed from the Commission's official mailing
list, please send your request by email to efiling@ferc.gov or by mail
to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
888 First Street NE., Room 1A, Washington, DC 20426. All written or
emailed requests must specify your wish to be removed from or added to
the mailing list and must clearly identify the following on the first
page: Lock & Dam No. 11 Hydroelectric Project No. 14276-001.
l. The proposed project would use the Kentucky River Authority's
(KRA) existing Kentucky River Lock & Dam No. 11, and be operated as a
run-of-river facility using existing flows while maintaining current
water surface elevations in the upstream pool. The proposed project
would include: (1) The existing 579-acre reservoir, with a normal pool
elevation of 585.60 feet North American Vertical Datum of 1988; (2) a
new 3.5-foot-high adjustable crest gate attached to the top of the
existing 208-foot-long, 35-foot-high fixed crest dam; (3) a new 275-
foot-long, 75-foot-wide reinforced concrete intake channel equipped
with 3-inch bar spacing trashracks; (4) a new 140-foot-long, 64.5-foot-
wide powerhouse built within the existing lock structure, with two
horizontal Kaplan turbine generator units each rated at 2.5 megawatts
(MW) for a total installed capacity of 5 MW; (5) a new 190-foot-long,
78-foot-wide tailrace; (6) a new substation; (7) a new, approximately
4.5-mile-long, 69-kilovolt transmission line extending from the
powerhouse to an existing substation located near Waco, Kentucky; and
(8) appurtenant facilities. The proposed project would generate about
18.5 gigawatt-hours annually, which would be sold to a local utility.
m. With this notice, we are soliciting comments on the use of the
two-year license process for this project. We are also soliciting
comments on the PAD, the list of environmental issues, the proposed
studies, and study requests. Any request for additional studies or
modifications to the proposed studies must conform to the requirements
in 18 CFR 5.9(b) of the Commission's regulations.
All comments and study requests should be sent to the address above
in paragraph h and must be filed with the Commission. The Commission
strongly encourages electronic filing. Please file all documents using
the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov. In lieu of electronic filing, please send a
paper copy to: Secretary, Federal Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
All filings with the Commission must include on the first page, the
project name (Kentucky River Lock & Dam No. 11 Hydroelectric Project)
and number (P-14276-001), as well as docket number AD13-9-000, and bear
the appropriate heading: ``Comments on Pre-Application Document,''
``Comments on the Use of the Two-Year Process,'' ``Comments on List of
Potential Environmental Effects for Environmental Analysis,'' or
``Comments on Proposed Study Plan.'' Comments and study requests must
be filed by July 3, 2014.
n. Commission staff will hold a technical meeting via
teleconference to
[[Page 32930]]
discuss the identified issues and study needs, as well as discuss the
process plan and schedule. The technical meeting will focus on the
information gaps that need to be filled to ensure that sufficient
information exists for the Commission to make a determination on
whether the proposed project meets the criteria for a pilot project and
for processing a license application once it is filed with the
Commission. All interested individuals, organizations, and agencies are
invited to participate in the technical meeting. A summary of the
meeting will be placed in the public records of the project. The time
of the meeting will be Thursday, June 19, 2014, at 1:30 p.m. Anyone
wanting to participate in the meeting should contact Sarah Salazar,
using the contact information provided above in paragraph i, for
teleconference call-in instructions by June 13, 2014.
Dated: June 3, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-13354 Filed 6-6-14; 8:45 am]