National Fuel Gas Supply Corporation; Notice of Request Under Blanket Authorization, 32938-32939 [2014-13350]

Download as PDF 32938 Federal Register / Vol. 79, No. 110 / Monday, June 9, 2014 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP14–492–000] ehiers on DSK2VPTVN1PROD with NOTICES Equitrans, L.P.; Notice of Request Under Blanket Authorization Take notice that on May 23, 2014, Equitrans, L.P. (Equitrans), 625 Liberty Avenue, Suite 1700, Pittsburgh, Pennsylvania 15222, filed in the above Docket, a prior notice request pursuant to sections 157.205, 157.208 and 157.210 of the Commission’s regulations under the Natural Gas Act (NGA) for authorization to uprate approximately 74 miles of existing pipeline in West Virginia and Pennsylvania, and to install additional compression at the existing Blacksville Compressor Station to add approximately 100 million cubic feet per day (MMcf/d) of new capacity on its Mainline System under authorization issued to Equitrans in Docket No. CP96–532–000, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to Paul W. Diehl, Senior Counsel, Midstream EQT Corporation, 625 Liberty Avenue, Suite 1700, Pittsburgh, PA 15222, at (412) 395–5540. Specifically, Equitrans proposes to increase the maximum allowable operating pressure (MAOP) of several of its pipeline segments, from 605 psig to 655 psig and add 9,470 horsepower of compression at its Blacksville Compressor Station in Monongalia County, West Virginia. The estimated cost of the project is $26,579,260. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the VerDate Mar<15>2010 15:08 Jun 06, 2014 Jkt 232001 EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (www.ferc.gov) under the ‘‘e-Filing’’ link. Dated: May 30, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–13349 Filed 6–6–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP14–494–000] National Fuel Gas Supply Corporation; Notice of Request Under Blanket Authorization Take notice that on May 30, 2014, National Fuel Gas Supply Corporation (National Fuel), 6363 Main Street, Williamsville, New York 14221, filed in Docket No. CP14–494–000, a prior notice request pursuant to sections 157.205, 157.208 and 157.216 of the Commission’s Regulations under the Natural Gas Act (NGA). National Fuel seeks authorization to (1) construct and operate approximately 350 feet of 6-inch diameter pipeline, (2) abandon, in place, approximately 3,430 feet of 12-inch PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 diameter pipeline, (3) remove approximately 420 feet of 4-inch diameter bare steel pipeline, and (4) install various auxiliary facilities in connection with the pipeline abandonment, all located in National Fuel’s existing Summit Storage field in Erie County, Pennsylvania, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to Kenneth E. Webster, Attorney, National Fuel Gas Supply Corporation, 6363 Main Street, Williamsville, NY 14221 or by calling (716) 857–7067, fax (716) 857–7206 or at websterk@natfuel.com. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to Section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to Section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules (18 CFR 157.9), within 90 days of this Notice, the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all E:\FR\FM\09JNN1.SGM 09JNN1 Federal Register / Vol. 79, No. 110 / Monday, June 9, 2014 / Notices federal authorizations within 90 days of the date of issuance of the Commission staff’s EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenter’s will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commentary, will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Dated: June 3, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–13350 Filed 6–6–14; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPPT–2014–0381; FRL–9910–70] Certain New Chemicals; Receipt and Status Information ehiers on DSK2VPTVN1PROD with NOTICES I. General Information A. Does this action apply to me? EPA is required under the Toxic Substances Control Act (TSCA) to publish in the Federal Register a notice of receipt of a premanufacture notice (PMN); an application for a test marketing exemption (TME), both pending and/or expired; and a periodic status report on any new chemicals under EPA review and the receipt of notices of commencement (NOC) to manufacture those chemicals. This document covers the period from April 18, 2013 to May 22, 2013. VerDate Mar<15>2010 15:08 Jun 06, 2014 Jkt 232001 Submit your comments, identified by docket identification (ID) number EPA–HQ–OPPT–2014–0381, and the specific PMN number or TME number for the chemical related to your comment, by one of the following methods: • Federal eRulemaking Portal: https:// www.regulations.gov. Follow the online instructions for submitting comments. Do not submit electronically any information you consider to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. • Mail: Document Control Office (7407M), Office of Pollution Prevention and Toxics (OPPT), Environmental Protection Agency, 1200 Pennsylvania Ave. NW., Washington, DC 20460–0001. • Hand Delivery: To make special arrangements for hand delivery or delivery of boxed information, please follow the instructions at https:// www.epa.gov/dockets/contacts.html. Additional instructions on commenting or visiting the docket, along with more information about dockets generally, is available at https://www.epa.gov/dockets. FOR FURTHER INFORMATION CONTACT: For technical information contact: Bernice Mudd, Information Management Division (7407M), Office of Pollution Prevention and Toxics, Environmental Protection Agency, 1200 Pennsylvania Ave. NW., Washington, DC 20460–0001; telephone number: (202) 564–8951; email address: mudd.bernice@epa.gov. For general information contact: The TSCA-Hotline, ABVI-Goodwill, 422 South Clinton Ave., Rochester, NY 14620; telephone number: (202) 554– 1404; email address: TSCA-Hotline@ epa.gov. ADDRESSES: SUPPLEMENTARY INFORMATION: Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: SUMMARY: Comments identified by the specific PMN number or TME number, must be received on or before July 9, 2014. DATES: This action is directed to the public in general. As such, the Agency has not attempted to describe the specific entities that this action may apply to. Although others may be affected, this action applies directly to the submitter of the PMNs addressed in this action. B. What should I consider as I prepare my comments for EPA? 1. Submitting CBI. Do not submit this information to EPA through regulations.gov or email. Clearly mark PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 32939 the part or all of the information that you claim to be CBI. For CBI information in a disk or CD–ROM that you mail to EPA, mark the outside of the disk or CD–ROM as CBI and then identify electronically within the disk or CD–ROM the specific information that is claimed as CBI. In addition to one complete version of the comment that includes information claimed as CBI, a copy of the comment that does not contain the information claimed as CBI must be submitted for inclusion in the public docket. Information so marked will not be disclosed except in accordance with procedures set forth in 40 CFR part 2. 2. Tips for preparing your comments. When submitting comments, remember to: i. Identify the document by docket ID number and other identifying information (subject heading, Federal Register date and page number). ii. Follow directions. The Agency may ask you to respond to specific questions or organize comments by referencing a Code of Federal Regulations (CFR) part or section number. iii. Explain why you agree or disagree; suggest alternatives and substitute language for your requested changes. iv. Describe any assumptions and provide any technical information and/ or data that you used. v. If you estimate potential costs or burdens, explain how you arrived at your estimate in sufficient detail to allow for it to be reproduced. vi. Provide specific examples to illustrate your concerns and suggest alternatives. vii. Explain your views as clearly as possible, avoiding the use of profanity or personal threats. viii. Make sure to submit your comments by the comment period deadline identified. II. What action is the Agency taking? This document provides receipt and status reports, which cover the period from April 18, 2013 to May 22, 2013, and consists of the PMNs and TMEs both pending and/or expired, and the NOCs to manufacture a new chemical that the Agency has received under TSCA section 5 during this time period. III. What is the Agency’s authority for taking this action? Section 5 of TSCA requires that EPA periodical publish in the Federal Register receipt and status reports, which cover the following EPA activities required by provisions of TSCA section 5. EPA classifies a chemical substance as either an ‘‘existing’’ chemical or a E:\FR\FM\09JNN1.SGM 09JNN1

Agencies

[Federal Register Volume 79, Number 110 (Monday, June 9, 2014)]
[Notices]
[Pages 32938-32939]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-13350]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP14-494-000]


National Fuel Gas Supply Corporation; Notice of Request Under 
Blanket Authorization

    Take notice that on May 30, 2014, National Fuel Gas Supply 
Corporation (National Fuel), 6363 Main Street, Williamsville, New York 
14221, filed in Docket No. CP14-494-000, a prior notice request 
pursuant to sections 157.205, 157.208 and 157.216 of the Commission's 
Regulations under the Natural Gas Act (NGA). National Fuel seeks 
authorization to (1) construct and operate approximately 350 feet of 6-
inch diameter pipeline, (2) abandon, in place, approximately 3,430 feet 
of 12-inch diameter pipeline, (3) remove approximately 420 feet of 4-
inch diameter bare steel pipeline, and (4) install various auxiliary 
facilities in connection with the pipeline abandonment, all located in 
National Fuel's existing Summit Storage field in Erie County, 
Pennsylvania, all as more fully set forth in the application which is 
on file with the Commission and open to public inspection.
    The filing may also be viewed on the Web at https://www.ferc.gov 
using the ``eLibrary'' link. Enter the docket number excluding the last 
three digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY, 
contact (202) 502-8659.
    Any questions concerning this application may be directed to 
Kenneth E. Webster, Attorney, National Fuel Gas Supply Corporation, 
6363 Main Street, Williamsville, NY 14221 or by calling (716) 857-7067, 
fax (716) 857-7206 or at websterk@natfuel.com.
    Any person or the Commission's staff may, within 60 days after 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and pursuant to Section 157.205 of 
the regulations under the NGA (18 CFR 157.205), a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for filing a protest. If a protest is filed and 
not withdrawn within 30 days after the allowed time for filing a 
protest, the instant request shall be treated as an application for 
authorization pursuant to Section 7 of the NGA.
    Pursuant to section 157.9 of the Commission's rules (18 CFR 157.9), 
within 90 days of this Notice, the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the EA for this proposal. The filing of the EA in the Commission's 
public record for this proceeding or the issuance of a Notice of 
Schedule for Environmental Review will serve to notify federal and 
state agencies of the timing for the completion of all necessary 
reviews, and the subsequent need to complete all

[[Page 32939]]

federal authorizations within 90 days of the date of issuance of the 
Commission staff's EA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenter's will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentary, will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and 5 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.

    Dated: June 3, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-13350 Filed 6-6-14; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.