National Fuel Gas Supply Corporation; Notice of Request Under Blanket Authorization, 32938-32939 [2014-13350]
Download as PDF
32938
Federal Register / Vol. 79, No. 110 / Monday, June 9, 2014 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–492–000]
ehiers on DSK2VPTVN1PROD with NOTICES
Equitrans, L.P.; Notice of Request
Under Blanket Authorization
Take notice that on May 23, 2014,
Equitrans, L.P. (Equitrans), 625 Liberty
Avenue, Suite 1700, Pittsburgh,
Pennsylvania 15222, filed in the above
Docket, a prior notice request pursuant
to sections 157.205, 157.208 and
157.210 of the Commission’s regulations
under the Natural Gas Act (NGA) for
authorization to uprate approximately
74 miles of existing pipeline in West
Virginia and Pennsylvania, and to
install additional compression at the
existing Blacksville Compressor Station
to add approximately 100 million cubic
feet per day (MMcf/d) of new capacity
on its Mainline System under
authorization issued to Equitrans in
Docket No. CP96–532–000, all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions concerning this
application may be directed to Paul W.
Diehl, Senior Counsel, Midstream EQT
Corporation, 625 Liberty Avenue, Suite
1700, Pittsburgh, PA 15222, at (412)
395–5540.
Specifically, Equitrans proposes to
increase the maximum allowable
operating pressure (MAOP) of several of
its pipeline segments, from 605 psig to
655 psig and add 9,470 horsepower of
compression at its Blacksville
Compressor Station in Monongalia
County, West Virginia. The estimated
cost of the project is $26,579,260.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
VerDate Mar<15>2010
15:08 Jun 06, 2014
Jkt 232001
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
Natural Gas Act (NGA) (18 CFR 157.205)
file a protest to the request. If no protest
is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
day after the time allowed for protest. If
a protest is filed and not withdrawn
within 30 days after the time allowed
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link.
Dated: May 30, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–13349 Filed 6–6–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–494–000]
National Fuel Gas Supply Corporation;
Notice of Request Under Blanket
Authorization
Take notice that on May 30, 2014,
National Fuel Gas Supply Corporation
(National Fuel), 6363 Main Street,
Williamsville, New York 14221, filed in
Docket No. CP14–494–000, a prior
notice request pursuant to sections
157.205, 157.208 and 157.216 of the
Commission’s Regulations under the
Natural Gas Act (NGA). National Fuel
seeks authorization to (1) construct and
operate approximately 350 feet of 6-inch
diameter pipeline, (2) abandon, in place,
approximately 3,430 feet of 12-inch
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
diameter pipeline, (3) remove
approximately 420 feet of 4-inch
diameter bare steel pipeline, and (4)
install various auxiliary facilities in
connection with the pipeline
abandonment, all located in National
Fuel’s existing Summit Storage field in
Erie County, Pennsylvania, all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection.
The filing may also be viewed on the
Web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, please contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or TTY, contact
(202) 502–8659.
Any questions concerning this
application may be directed to Kenneth
E. Webster, Attorney, National Fuel Gas
Supply Corporation, 6363 Main Street,
Williamsville, NY 14221 or by calling
(716) 857–7067, fax (716) 857–7206 or at
websterk@natfuel.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to Section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules (18 CFR 157.9),
within 90 days of this Notice, the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
E:\FR\FM\09JNN1.SGM
09JNN1
Federal Register / Vol. 79, No. 110 / Monday, June 9, 2014 / Notices
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Dated: June 3, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–13350 Filed 6–6–14; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPPT–2014–0381; FRL–9910–70]
Certain New Chemicals; Receipt and
Status Information
ehiers on DSK2VPTVN1PROD with NOTICES
I. General Information
A. Does this action apply to me?
EPA is required under the
Toxic Substances Control Act (TSCA) to
publish in the Federal Register a notice
of receipt of a premanufacture notice
(PMN); an application for a test
marketing exemption (TME), both
pending and/or expired; and a periodic
status report on any new chemicals
under EPA review and the receipt of
notices of commencement (NOC) to
manufacture those chemicals. This
document covers the period from April
18, 2013 to May 22, 2013.
VerDate Mar<15>2010
15:08 Jun 06, 2014
Jkt 232001
Submit your comments,
identified by docket identification (ID)
number EPA–HQ–OPPT–2014–0381,
and the specific PMN number or TME
number for the chemical related to your
comment, by one of the following
methods:
• Federal eRulemaking Portal: https://
www.regulations.gov. Follow the online
instructions for submitting comments.
Do not submit electronically any
information you consider to be
Confidential Business Information (CBI)
or other information whose disclosure is
restricted by statute.
• Mail: Document Control Office
(7407M), Office of Pollution Prevention
and Toxics (OPPT), Environmental
Protection Agency, 1200 Pennsylvania
Ave. NW., Washington, DC 20460–0001.
• Hand Delivery: To make special
arrangements for hand delivery or
delivery of boxed information, please
follow the instructions at https://
www.epa.gov/dockets/contacts.html.
Additional instructions on
commenting or visiting the docket,
along with more information about
dockets generally, is available at
https://www.epa.gov/dockets.
FOR FURTHER INFORMATION CONTACT:
For technical information contact:
Bernice Mudd, Information
Management Division (7407M), Office of
Pollution Prevention and Toxics,
Environmental Protection Agency, 1200
Pennsylvania Ave. NW., Washington,
DC 20460–0001; telephone number:
(202) 564–8951; email address:
mudd.bernice@epa.gov.
For general information contact: The
TSCA-Hotline, ABVI-Goodwill, 422
South Clinton Ave., Rochester, NY
14620; telephone number: (202) 554–
1404; email address: TSCA-Hotline@
epa.gov.
ADDRESSES:
SUPPLEMENTARY INFORMATION:
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY:
Comments identified by the
specific PMN number or TME number,
must be received on or before July 9,
2014.
DATES:
This action is directed to the public
in general. As such, the Agency has not
attempted to describe the specific
entities that this action may apply to.
Although others may be affected, this
action applies directly to the submitter
of the PMNs addressed in this action.
B. What should I consider as I prepare
my comments for EPA?
1. Submitting CBI. Do not submit this
information to EPA through
regulations.gov or email. Clearly mark
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
32939
the part or all of the information that
you claim to be CBI. For CBI
information in a disk or CD–ROM that
you mail to EPA, mark the outside of the
disk or CD–ROM as CBI and then
identify electronically within the disk or
CD–ROM the specific information that
is claimed as CBI. In addition to one
complete version of the comment that
includes information claimed as CBI, a
copy of the comment that does not
contain the information claimed as CBI
must be submitted for inclusion in the
public docket. Information so marked
will not be disclosed except in
accordance with procedures set forth in
40 CFR part 2.
2. Tips for preparing your comments.
When submitting comments, remember
to:
i. Identify the document by docket ID
number and other identifying
information (subject heading, Federal
Register date and page number).
ii. Follow directions. The Agency may
ask you to respond to specific questions
or organize comments by referencing a
Code of Federal Regulations (CFR) part
or section number.
iii. Explain why you agree or disagree;
suggest alternatives and substitute
language for your requested changes.
iv. Describe any assumptions and
provide any technical information and/
or data that you used.
v. If you estimate potential costs or
burdens, explain how you arrived at
your estimate in sufficient detail to
allow for it to be reproduced.
vi. Provide specific examples to
illustrate your concerns and suggest
alternatives.
vii. Explain your views as clearly as
possible, avoiding the use of profanity
or personal threats.
viii. Make sure to submit your
comments by the comment period
deadline identified.
II. What action is the Agency taking?
This document provides receipt and
status reports, which cover the period
from April 18, 2013 to May 22, 2013,
and consists of the PMNs and TMEs
both pending and/or expired, and the
NOCs to manufacture a new chemical
that the Agency has received under
TSCA section 5 during this time period.
III. What is the Agency’s authority for
taking this action?
Section 5 of TSCA requires that EPA
periodical publish in the Federal
Register receipt and status reports,
which cover the following EPA
activities required by provisions of
TSCA section 5.
EPA classifies a chemical substance as
either an ‘‘existing’’ chemical or a
E:\FR\FM\09JNN1.SGM
09JNN1
Agencies
[Federal Register Volume 79, Number 110 (Monday, June 9, 2014)]
[Notices]
[Pages 32938-32939]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-13350]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP14-494-000]
National Fuel Gas Supply Corporation; Notice of Request Under
Blanket Authorization
Take notice that on May 30, 2014, National Fuel Gas Supply
Corporation (National Fuel), 6363 Main Street, Williamsville, New York
14221, filed in Docket No. CP14-494-000, a prior notice request
pursuant to sections 157.205, 157.208 and 157.216 of the Commission's
Regulations under the Natural Gas Act (NGA). National Fuel seeks
authorization to (1) construct and operate approximately 350 feet of 6-
inch diameter pipeline, (2) abandon, in place, approximately 3,430 feet
of 12-inch diameter pipeline, (3) remove approximately 420 feet of 4-
inch diameter bare steel pipeline, and (4) install various auxiliary
facilities in connection with the pipeline abandonment, all located in
National Fuel's existing Summit Storage field in Erie County,
Pennsylvania, all as more fully set forth in the application which is
on file with the Commission and open to public inspection.
The filing may also be viewed on the Web at https://www.ferc.gov
using the ``eLibrary'' link. Enter the docket number excluding the last
three digits in the docket number field to access the document. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY,
contact (202) 502-8659.
Any questions concerning this application may be directed to
Kenneth E. Webster, Attorney, National Fuel Gas Supply Corporation,
6363 Main Street, Williamsville, NY 14221 or by calling (716) 857-7067,
fax (716) 857-7206 or at websterk@natfuel.com.
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules (18 CFR 157.9),
within 90 days of this Notice, the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the EA for this proposal. The filing of the EA in the Commission's
public record for this proceeding or the issuance of a Notice of
Schedule for Environmental Review will serve to notify federal and
state agencies of the timing for the completion of all necessary
reviews, and the subsequent need to complete all
[[Page 32939]]
federal authorizations within 90 days of the date of issuance of the
Commission staff's EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenter's will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenters will not be required to serve copies of filed
documents on all other parties. However, the non-party commentary, will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 5 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
Dated: June 3, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-13350 Filed 6-6-14; 8:45 am]
BILLING CODE 6717-01-P