Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Beryllium Rocket Motor Fuel Firing (Renewal), 32281 [2014-12957]

Download as PDF Federal Register / Vol. 79, No. 107 / Wednesday, June 4, 2014 / Notices Semiannual summary reports are also required. Form Numbers: None. Respondents/affected entities: Pharmaceutical manufacturing operations. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart GGG). Estimated number of respondents: 27 (total). Frequency of response: Initially, occasionally, quarterly and semiannually. Total estimated burden: 44,266 hours (per year). Burden is defined at 5 CFR 1320.3(b). Total estimated cost: $4,442,518 (per year), includes $112,266 annualized capital or operation & maintenance costs. Changes in the Estimates: There is no change in the labor hours in this ICR compared to the previous ICR. This is due to two considerations: 1) The regulations have not changed since the publication of the 2011 final rule, which was covered in the last ICR renewal; and 2) the growth rate for the industry is very low, negative or non-existent. However, there is an increase in industry cost as the burden calculations in this ICR, including affirmative defense, have been updated to use more recent labor rates. Dated: May 27, 2014. Erin Collard, Acting Director, Collection Strategies Division. [FR Doc. 2014–12911 Filed 6–3–14; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OECA–2013–0322; FRL–9909– 04–OEI] Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Beryllium Rocket Motor Fuel Firing (Renewal) Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: The Environmental Protection Agency has submitted an information collection request (ICR), ‘‘NESHAP for Beryllium Rocket Motor Fuel Firing (Renewal)’’ (EPA ICR No. 1125.07, OMB Control No. 2060–0394), to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.). This is a proposed tkelley on DSK3SPTVN1PROD with NOTICES SUMMARY: VerDate Mar<15>2010 16:05 Jun 03, 2014 Jkt 232001 extension of the ICR, which is currently approved through June 30, 2014. Public comments were previously requested via the Federal Register (78 FR 35023) on June 11, 2013 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An Agency may not conduct or sponsor and a person is not required to respond to a collection of information, unless it displays a currently valid OMB control number. DATES: Additional comments may be submitted on or before July 7, 2014. ADDRESSES: Submit your comments, referencing Docket ID Number EPA– HQ–OECA–2013–0322, to: (1) EPA online, using www.regulations.gov (our preferred method), or by email to: docket.oeca@epa.gov, or by mail to: EPA Docket Center, Environmental Protection Agency, Mail Code 28221T, 1200 Pennsylvania Ave. NW., Washington, DC 20460; and (2) OMB via email to oira_submission@omb.eop.gov. Address comments to OMB Desk Officer for EPA. EPA’s policy is that all comments received will be included in the public docket without change including any personal information provided, unless the comment includes profanity, threats, information claimed to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. FOR FURTHER INFORMATION CONTACT: Patrick Yellin, Monitoring, Assistance, and Media Programs Division, Office of Compliance, Mail Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. NW., Washington, DC 20460; telephone number: (202) 564–2970; fax number: (202) 564–0050; email address: yellin.patrick@epa.gov. SUPPLEMENTARY INFORMATION: Supporting documents which explain in detail the information that the EPA will be collecting are available in the public docket for this ICR. The docket can be viewed online at www.regulations.gov, or in person at the EPA Docket Center, WJC West, Room 3334, 1301 Constitution Ave. NW., Washington, DC. The telephone number for the Docket Center is 202–566–1744. For additional information about EPA’s public docket, visit: https:// www.epa.gov/dockets. Abstract: The affected entities are subject to the General Provisions of the NESHAP (40 CFR part 61, subpart A), and any changes or additions to the Provisions are further specified at 40 CFR part 61, subpart D. Owners or PO 00000 Frm 00069 Fmt 4703 Sfmt 4703 32281 operators of the affected facilities must submit a onetime-only report of any physical or operational changes, initial performance tests, and periodic reports and results. Owners or operators are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. Form Numbers: None. Respondents/affected entities: Owners or operators of beryllium rocket motor fuel firing facilities. Respondent’s obligation to respond: Mandatory (40 CFR part 61, subpart D). Estimated number of respondents: 1 (total). Frequency of response: Initially and occasionally. Total estimated burden: 8 hours (per year). Burden is defined at 5 CFR 1320.3(b). Total estimated cost: $817 (per year), which includes no annualized capital or operation & maintenance costs. Changes in the Estimates: There is no change in calculating the burden for either Industry or the EPA in this ICR. The change in the cost estimates is a result of using updated labor rates to facilitate the calculation of burden costs. Dated: May 27, 2014. Erin Collard, Acting Director, Collection Strategies Division. [FR Doc. 2014–12957 Filed 6–3–14; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OAR–2007–0069; FRL–9911–47– OEI] Information Collection Request Submitted to OMB for Review and Approval; Comment Request; The SunWise Program (Renewal) Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: The Environmental Protection Agency (EPA) has submitted an information collection request (ICR), ‘‘The SunWise Program (Renewal)’’ (EPA ICR No. 1904.08, OMB Control No. 2060–0439) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.). This is a proposed extension of the ICR, which is currently approved through June 30, 2014. Public comments were previously requested SUMMARY: E:\FR\FM\04JNN1.SGM 04JNN1

Agencies

[Federal Register Volume 79, Number 107 (Wednesday, June 4, 2014)]
[Notices]
[Page 32281]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-12957]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[EPA-HQ-OECA-2013-0322; FRL-9909-04-OEI]


Information Collection Request Submitted to OMB for Review and 
Approval; Comment Request; NESHAP for Beryllium Rocket Motor Fuel 
Firing (Renewal)

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency has submitted an 
information collection request (ICR), ``NESHAP for Beryllium Rocket 
Motor Fuel Firing (Renewal)'' (EPA ICR No. 1125.07, OMB Control No. 
2060-0394), to the Office of Management and Budget (OMB) for review and 
approval in accordance with the Paperwork Reduction Act (44 U.S.C. 3501 
et seq.). This is a proposed extension of the ICR, which is currently 
approved through June 30, 2014. Public comments were previously 
requested via the Federal Register (78 FR 35023) on June 11, 2013 
during a 60-day comment period. This notice allows for an additional 30 
days for public comments. A fuller description of the ICR is given 
below, including its estimated burden and cost to the public. An Agency 
may not conduct or sponsor and a person is not required to respond to a 
collection of information, unless it displays a currently valid OMB 
control number.

DATES: Additional comments may be submitted on or before July 7, 2014.

ADDRESSES: Submit your comments, referencing Docket ID Number EPA-HQ-
OECA-2013-0322, to: (1) EPA online, using www.regulations.gov (our 
preferred method), or by email to: docket.oeca@epa.gov, or by mail to: 
EPA Docket Center, Environmental Protection Agency, Mail Code 28221T, 
1200 Pennsylvania Ave. NW., Washington, DC 20460; and (2) OMB via email 
to oira_submission@omb.eop.gov. Address comments to OMB Desk Officer 
for EPA.
    EPA's policy is that all comments received will be included in the 
public docket without change including any personal information 
provided, unless the comment includes profanity, threats, information 
claimed to be Confidential Business Information (CBI) or other 
information whose disclosure is restricted by statute.

FOR FURTHER INFORMATION CONTACT: Patrick Yellin, Monitoring, 
Assistance, and Media Programs Division, Office of Compliance, Mail 
Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. 
NW., Washington, DC 20460; telephone number: (202) 564-2970; fax 
number: (202) 564-0050; email address: yellin.patrick@epa.gov.

SUPPLEMENTARY INFORMATION: Supporting documents which explain in detail 
the information that the EPA will be collecting are available in the 
public docket for this ICR. The docket can be viewed online at 
www.regulations.gov, or in person at the EPA Docket Center, WJC West, 
Room 3334, 1301 Constitution Ave. NW., Washington, DC. The telephone 
number for the Docket Center is 202-566-1744. For additional 
information about EPA's public docket, visit: https://www.epa.gov/dockets.
    Abstract: The affected entities are subject to the General 
Provisions of the NESHAP (40 CFR part 61, subpart A), and any changes 
or additions to the Provisions are further specified at 40 CFR part 61, 
subpart D. Owners or operators of the affected facilities must submit a 
onetime-only report of any physical or operational changes, initial 
performance tests, and periodic reports and results. Owners or 
operators are also required to maintain records of the occurrence and 
duration of any startup, shutdown, or malfunction in the operation of 
an affected facility, or any period during which the monitoring system 
is inoperative.
    Form Numbers: None.
    Respondents/affected entities: Owners or operators of beryllium 
rocket motor fuel firing facilities.
    Respondent's obligation to respond: Mandatory (40 CFR part 61, 
subpart D).
    Estimated number of respondents: 1 (total).
    Frequency of response: Initially and occasionally.
    Total estimated burden: 8 hours (per year). Burden is defined at 5 
CFR 1320.3(b).
    Total estimated cost: $817 (per year), which includes no annualized 
capital or operation & maintenance costs.
    Changes in the Estimates: There is no change in calculating the 
burden for either Industry or the EPA in this ICR. The change in the 
cost estimates is a result of using updated labor rates to facilitate 
the calculation of burden costs.

    Dated: May 27, 2014.
Erin Collard,
Acting Director, Collection Strategies Division.
[FR Doc. 2014-12957 Filed 6-3-14; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.