Loup River Public Power District; Notice of Availability of Draft Environmental Assessment, 32271 [2014-12874]
Download as PDF
Federal Register / Vol. 79, No. 107 / Wednesday, June 4, 2014 / Notices
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on June 12, 2014.
Dated: May 28, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–12875 Filed 6–3–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL14–57–000]
tkelley on DSK3SPTVN1PROD with NOTICES
City of Hastings, Nebraska, City of
Grand Island, Nebraska v. Southwest
Power Pool, Inc.; Notice of Complaint
Take notice that on May 23, 2014,
pursuant to section 206 and 306 of the
Federal Power Act (FPA), 16 USC 824e
and 825e and Rule 206 of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.206, the City of
Hastings, Nebraska and the City of
Grand Island, Nebraska (collectively,
Complainants) filed a formal complaint
against Southwest Power Pool, Inc.
(Respondent or SPP) alleging that, the
Respondent may have misinterpreted its
Tariff and is in violation of the FPA by
demanding that the Complainants
purchase transmission service that is
not required by the Tariff and
demanding that Complainants pay
unreserved use penalties that are not
permitted under the Tariff. In the
alternative, if the Commission finds that
SPP’s interpretation is correct, the
Complainants requests that the
Commission determine that the affected
provisions of the Tariff are unjust and
unreasonable, as more fully explained
in the Complaint.
The Complainants certify that copies
of the Complaint were served on the
contacts for the Respondent as listed in
the Commission’s list of Corporate
Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
VerDate Mar<15>2010
16:05 Jun 03, 2014
Jkt 232001
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on June 12, 2014
Dated: May 28, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–12873 Filed 6–3–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1256–031]
Loup River Public Power District;
Notice of Availability of Draft
Environmental Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission (Commission) regulations,
18 CFR Part 380 (Order No. 486, 52 Fed.
Reg. 47897), the Office of Energy
Projects has reviewed the application
for a new license for the Loup River
Hydroelectric Project (FERC Project No.
1256), located on the Loup River in
PO 00000
Frm 00059
Fmt 4703
Sfmt 9990
32271
Nance and Platte counties, Nebraska,
and prepared a draft environmental
assessment (EA).
In the draft EA, Commission staff
analyzes the potential environmental
effects of licensing the project, and
concludes that issuing a new license for
the project, with appropriate
environmental measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
A copy of the draft EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number, excluding the
last three digits, in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll-free at 1–866–208–3676,
or for TTY, 202–502–8659.
You may also register online at
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
30 days from the date of this notice. The
Commission strongly encourages
electronic filing. Please file the
requested information using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include docket
number P–1256–031.
For further information, please
contact Lee Emery by telephone at (202)
502–8379, or by email at lee.emery@
ferc.gov.
Dated: May 22, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–12874 Filed 6–3–14; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\04JNN1.SGM
04JNN1
Agencies
[Federal Register Volume 79, Number 107 (Wednesday, June 4, 2014)]
[Notices]
[Page 32271]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-12874]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1256-031]
Loup River Public Power District; Notice of Availability of Draft
Environmental Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission (Commission) regulations,
18 CFR Part 380 (Order No. 486, 52 Fed. Reg. 47897), the Office of
Energy Projects has reviewed the application for a new license for the
Loup River Hydroelectric Project (FERC Project No. 1256), located on
the Loup River in Nance and Platte counties, Nebraska, and prepared a
draft environmental assessment (EA).
In the draft EA, Commission staff analyzes the potential
environmental effects of licensing the project, and concludes that
issuing a new license for the project, with appropriate environmental
measures, would not constitute a major federal action significantly
affecting the quality of the human environment.
A copy of the draft EA is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's Web site
at www.ferc.gov using the ``eLibrary'' link. Enter the docket number,
excluding the last three digits, in the docket number field to access
the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY,
202-502-8659.
You may also register online at www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Any comments should be filed within 30 days from the date of this
notice. The Commission strongly encourages electronic filing. Please
file the requested information using the Commission's eFiling system at
https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please
contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-
3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic
filing, please send a paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426. The
first page of any filing should include docket number P-1256-031.
For further information, please contact Lee Emery by telephone at
(202) 502-8379, or by email at lee.emery@ferc.gov.
Dated: May 22, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-12874 Filed 6-3-14; 8:45 am]
BILLING CODE 6717-01-P