Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals, 31390-31391 [2014-12678]

Download as PDF 31390 Federal Register / Vol. 79, No. 105 / Monday, June 2, 2014 / Notices Class of Air Carriers Not Required to Collect PFC’S: Part 135 on-demand air taxi/commercial operators filing FAA Form 1800–31. Determination: Approved. Based on information submitted in the public agency’s application, the FAA has determined that the proposed class accounts for less than 1 percent of the total annual enplanements at MOB. Brief Description of Projects Approved for Collection And Use: Reconstruction and realignment of taxiway M. East side roadway and utilities project. Professional services PFC preparation and administration. Brief Description of Projects Approved for Collection: Construct snow removal equipment building. Construct cargo apron improvements. Construct general aviation apron improvements. Reconstruction of taxiway E and portions of taxiway L. Decision Date: April 16, 2014. FOR FURTHER INFORMATION CONTACT: Jeffrey Breeden, Washington Airports District Office, (703) 661–1363. Public Agency: County of Sonoma, Santa Rosa, California. Application Number: 14–06–C–00– STS. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved In This Decision: $8,039,573. Earliest Charge Effective Date: June 1, 2014. Estimated Charge Expiration Date: April 1, 2026. Class of Air Carriers Not Required To Collect Pfc’s: None. Brief Description of Projects Approved for Collection And Use: Terminal building renovation and expansion. Runway safety area enhancement. Decision Date: April 22, 2014. FOR FURTHER INFORMATION CONTACT: Neil Kumar, San Francisco Airports District Office, (650) 827–7627. AMENDMENTS TO PFC APPROVALS Amendment approved date Amendment No. city, state 12–04–C–01–DAL Dallas, TX .............................................. 10–02–C–02–PHF Newport News, VA ................................ 12–03–C–01–PHF Newport News, VA ................................ 08–09–C–01–BLI Bellingham, WA ...................................... 05–06–C–01–ISP Islip, NY .................................................. Issued in Washington, DC, on May 23, 2014. Joe Hebert, Manager, Financial Analysis and Passenger Facility Charge Branch. [FR Doc. 2014–12685 Filed 5–30–14; 8:45 am] BILLING CODE 4910–13–P DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals Federal Aviation Administration (FAA), DOT. AGENCY: Monthly Notice of PFC Approvals and Disapprovals. In February 2014, there were three applications approved. This notice also includes information on one application, approved in April 2012, inadvertently left off the April 2012 notice. Additionally, seven approved amendments to previously approved applications are listed. sroberts on DSK5SPTVN1PROD with NOTICES ACTION: SUMMARY: The FAA publishes a monthly notice, as appropriate, of PFC approvals and disapprovals under the provisions of the Aviation Safety and Capacity Expansion Act of 1990 (Title IX of the Omnibus Budget Reconciliation Act of 1990) (Pub. L. 101–508) and Part 158 of the Federal Aviation Regulations (14 VerDate Mar<15>2010 21:17 May 30, 2014 Jkt 232001 04/03/14 04/10/14 04/10/14 04/10/14 04/23/14 Original approved net PFC revenue Amended approved net PFC revenue $13,637,816 15,866,709 12,090,644 2,548,830 37,133,218 $13,037,816 20,114,239 18,017,555 2,250,912 36,789,972 CFR Part 158). This notice is published pursuant to paragraph d of § 158.29. PFC Applications Approved Public Agency: City of San Angelo, Texas. Application Number: 12–09–C–00– SJT. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved In This Decision: $745,385. Earliest Charge Effective Date: August 1, 2014. Estimated Charge Expiration Date: August 1, 2018. Class of Air Carriers Not Required to Collect PFC’S: None. Brief Description of Projects Approved for Collection and Use: Improve terminal building. PFC application no. 9. Wildlife hazard assessment. Airport layout plan update. Decision Date: April 12, 2012. FOR FURTHER INFORMATION CONTACT: Marcelino Sanchez, Texas Airports Development Office, (817) 222–5652. Public Agency: Dickinson Municipal Airport Authority, Dickinson, North Dakota. Application Number: 14–01–C–00– DIK. Application Type: Impose and use a PFC. PFC Level: $4.50. PO 00000 Frm 00108 Fmt 4703 Sfmt 4703 Original estimated charge exp. date 10/01/27 03/01/17 03/01/22 09/01/14 08/01/15 Amended estimated charge exp. date 10/01/27 05/01/26 12/01/37 07/01/10 07/01/15 Total PFC Revenue Approved In This Decision: $714,384. Earliest Charge Effective Date: April 1, 2014. Estimated Charge Expiration Date: June 1, 2020. Class of Air Carriers Not Required to Collect PFC’S: None. Brief Description of Projects Approved for Collection and Use: Install guidance signs (electric items and signs). Extend and mark runway 14/32 (1,200 feet by 75 feet). Light runway 14/32 (1,200 feet by 75 feet). Reconstruct and mark taxiway B (630 feet by 40 feet). Light taxiway B (630 feet by 40 feet). Construct and mark taxiway C (1,125 feet by 35 feet) and taxiway D (1,550 feet by 35 feet). Light taxiway C (1,125 feet by 35 feet) and taxiway D (1,550 feet by 35 feet). Relocate visual approach slope indicator-4 system. Relocate supplemental wind cone. Install runway end identifier lights. Install airport guidance signs. Electrical vault and electrical upgrades. Signage upgrades. Rehabilitate runway 7/25 (4,700 feet by 75 feet), phase I. Install medium intensity runway lights for runway 7/25 (4,700 feet by 75 feet), phase I. Install lighted signs for runway 7/25 (4,700 feet by 75 feet), phase I. E:\FR\FM\02JNN1.SGM 02JNN1 31391 Federal Register / Vol. 79, No. 105 / Monday, June 2, 2014 / Notices Rehabilitate taxiways B and F. Install medium taxiway lights for taxiways B and F. Rehabilitate runway 7/25 (4,700 feet by 75 feet), phase II. Install medium intensity runway lights for runway 7/25 (4,700 feet by 75 feet), phase II. Install lighted signs for runway 7/25 (4,700 feet by 75 feet), phase II. Rehabilitate runway 14/32. Rehabilitate taxiway A. Rehabilitate apron area. Install runway 14/32 lighting. Relocate runway end identifier lights on runway 14. Rehabilitate taxiway A (2,700 feet by 35 feet). Install medium intensity taxiway lighting for taxiway A. Design and construct new terminal building. Construct taxiway for new terminal building. Construct concrete apron for new terminal. Improve terminal access road. Install security fencing. Install area lighting for new terminal. Rehabilitate runway 7/25—crack seal and marking. Rehabilitate taxiways—crack sealing and marking. Rehabilitate general aviation apron. Acquire snow removal equipment (loader with broom and plow blade). Acquire friction testing equipment. Update airport master plan study. PFC application preparation cost. Decision Date: February 10, 2014. FOR FURTHER INFORMATION CONTACT: Nancy Nistler, Bismarck Airports District Office, (612) 253–4638. Public Agency: City of Sioux City, Iowa. Application Number: 14–06–C–00– SUX. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved In This Decision: $831,205. Earliest Charge Effective Date: July 1, 2014. Estimated Charge Expiration Date: July 1, 2021. Class of Air Carriers Not Required to Collect PFC’s: None. Brief Description of Projects Approved for Collection and Use: Snow removal equipment building. Rehabilitate apron (design). Rehabilitate apron (construction). Acquire snow removal equipment (deicer). Rehabilitate terminal building. Rehabilitate terminal (loading bridge). Install guidance signs. Acquire snow removal equipment (broom). Update airport master plan study. Rehabilitate apron (taxiway). Security enhancements. Acquire snow removal equipment (broom). Decision Date: February 20, 2014. FOR FURTHER INFORMATION CONTACT: Sheila Bridges, Central Region Airports Division, (816) 329–2638. Public Agency: City of Valdosta, Georgia. Application Number: 14–11–C–00– VLD. Application Type: Impose and use a PFC. PFC Level: $4.50. Total PFC Revenue Approved In This Decision: $247,442. Earliest Charge Effective Date: April 1, 2014. Estimated Charge Expiration Date: April 1, 2016. Class of Air Carriers Not Required to Collect PFC’S: Air taxi/commercial operators operating at Valdosta Regional Airport (VLD). Determination: Approved. Based on information contained in the public agency’s application, the FAA has determined that the approved class accounts for less than 1 percent of the total annual enplanements at VLD. Brief Description of Projects Approved for Collection and Use: Wildlife hazard assessment. Design airfield electrical vault and backup generator. Design commercial terminal apron expansion. Design passenger boarding bridge for commercial terminal. Weight bearing capacity study. Construct airfield electrical vault and backup generator. Prepare PFC application. Wildlife hazard management plan. Construct commercial terminal apron expansion. Brief Description of Disapproved Project: Runway 17 safety area improvements. Detrmination: Disapproved. This project is not PFC eligible. Decision Date: February 26, 2014. FOR FURTHER INFORMATION CONTACT: Parks Preston, Atlanta Airports District Office, (404) 305–7149. AMENDMENTS TO PFC APPROVALS Amendment approved date Amendment No. city, state sroberts on DSK5SPTVN1PROD with NOTICES 05–01–C–01–CIU Kincheloe, MI ......................................... 04–02–C–01–LMT Klamath Falls, OR ................................. 06–10–C–01–CMX Calumet, MI .......................................... 01–06–C–02–ESC Escanaba, MI ........................................ 06–08–C–01–ESC Escanaba, MI ........................................ 07–04–C–01–GRR Grand Rapids, MI ................................. 00–02–C–02–JNU Juneau, AK ............................................ Issued in Washington, DC, on May 23, 2014. Joe Hebert, Manager, Financial Analysis and Passenger Facility Charge Branch. [FR Doc. 2014–12678 Filed 5–30–14; 8:45 am] BILLING CODE 4910–13–P Original approved net PFC revenue 2/06/14 2/06/14 2/07/14 2/21/14 2/21/14 2/21/14 2/24/14 $1,087,463 877,799 130,367 114,900 322,158 5,525,000 407,248 Jkt 232001 Amended estimated charge exp. date $1,050,115 718,606 125,592 78,073 322,158 7,403,893 386,514 07/01/23 12/01/11 11/01/07 03/01/04 04/01/14 05/01/19 02/01/01 02/01/23 12/01/11 06/01/07 03/01/04 04/01/14 12/01/19 02/01/01 Notice. ACTION: Federal Aviation Administration SUMMARY: Under the provisions of Title 49, U.S.C. Section 47151(d), notice is being given that the Federal Aviation Administration (FAA) is considering a request from the Richland-Lexington Airport District to waive the requirement that two parcels (3.51 acres and 3.68 acres) of surplus property, located at the Columbia Metropolitan Notice of Opportunity for Public Comment on Surplus Property Release at Columbia Metropolitan Airport, Columbia, South Carolina Federal Aviation Administration (FAA), DOT. 18:59 May 30, 2014 Original estimated charge exp. date DEPARTMENT OF TRANSPORTATION AGENCY: VerDate Mar<15>2010 Amended approved net PFC revenue PO 00000 Frm 00109 Fmt 4703 Sfmt 4703 E:\FR\FM\02JNN1.SGM 02JNN1

Agencies

[Federal Register Volume 79, Number 105 (Monday, June 2, 2014)]
[Notices]
[Pages 31390-31391]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-12678]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration


Notice of Passenger Facility Charge (PFC) Approvals and 
Disapprovals

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Monthly Notice of PFC Approvals and Disapprovals. In February 
2014, there were three applications approved. This notice also includes 
information on one application, approved in April 2012, inadvertently 
left off the April 2012 notice. Additionally, seven approved amendments 
to previously approved applications are listed.

-----------------------------------------------------------------------

SUMMARY: The FAA publishes a monthly notice, as appropriate, of PFC 
approvals and disapprovals under the provisions of the Aviation Safety 
and Capacity Expansion Act of 1990 (Title IX of the Omnibus Budget 
Reconciliation Act of 1990) (Pub. L. 101-508) and Part 158 of the 
Federal Aviation Regulations (14 CFR Part 158). This notice is 
published pursuant to paragraph d of Sec.  158.29.

PFC Applications Approved

    Public Agency: City of San Angelo, Texas.
    Application Number: 12-09-C-00-SJT.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved In This Decision: $745,385.
    Earliest Charge Effective Date: August 1, 2014.
    Estimated Charge Expiration Date: August 1, 2018.
    Class of Air Carriers Not Required to Collect PFC'S: None.
    Brief Description of Projects Approved for Collection and Use: 
Improve terminal building.
    PFC application no. 9.
    Wildlife hazard assessment.
    Airport layout plan update.
    Decision Date: April 12, 2012.

FOR FURTHER INFORMATION CONTACT: Marcelino Sanchez, Texas Airports 
Development Office, (817) 222-5652.

    Public Agency: Dickinson Municipal Airport Authority, Dickinson, 
North Dakota.
    Application Number: 14-01-C-00-DIK.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved In This Decision: $714,384.
    Earliest Charge Effective Date: April 1, 2014.
    Estimated Charge Expiration Date: June 1, 2020.
    Class of Air Carriers Not Required to Collect PFC'S: None.
    Brief Description of Projects Approved for Collection and Use: 
Install guidance signs (electric items and signs).
    Extend and mark runway 14/32 (1,200 feet by 75 feet).
    Light runway 14/32 (1,200 feet by 75 feet).
    Reconstruct and mark taxiway B (630 feet by 40 feet).
    Light taxiway B (630 feet by 40 feet).
    Construct and mark taxiway C (1,125 feet by 35 feet) and taxiway D 
(1,550 feet by 35 feet).
    Light taxiway C (1,125 feet by 35 feet) and taxiway D (1,550 feet 
by 35 feet).
    Relocate visual approach slope indicator-4 system.
    Relocate supplemental wind cone.
    Install runway end identifier lights.
    Install airport guidance signs.
    Electrical vault and electrical upgrades.
    Signage upgrades.
    Rehabilitate runway 7/25 (4,700 feet by 75 feet), phase I.
    Install medium intensity runway lights for runway 7/25 (4,700 feet 
by 75 feet), phase I.
    Install lighted signs for runway 7/25 (4,700 feet by 75 feet), 
phase I.

[[Page 31391]]

    Rehabilitate taxiways B and F.
    Install medium taxiway lights for taxiways B and F.
    Rehabilitate runway 7/25 (4,700 feet by 75 feet), phase II.
    Install medium intensity runway lights for runway 7/25 (4,700 feet 
by 75 feet), phase II.
    Install lighted signs for runway 7/25 (4,700 feet by 75 feet), 
phase II.
    Rehabilitate runway 14/32.
    Rehabilitate taxiway A.
    Rehabilitate apron area.
    Install runway 14/32 lighting.
    Relocate runway end identifier lights on runway 14.
    Rehabilitate taxiway A (2,700 feet by 35 feet).
    Install medium intensity taxiway lighting for taxiway A.
    Design and construct new terminal building.
    Construct taxiway for new terminal building.
    Construct concrete apron for new terminal.
    Improve terminal access road.
    Install security fencing.
    Install area lighting for new terminal.
    Rehabilitate runway 7/25--crack seal and marking.
    Rehabilitate taxiways--crack sealing and marking.
    Rehabilitate general aviation apron.
    Acquire snow removal equipment (loader with broom and plow blade).
    Acquire friction testing equipment.
    Update airport master plan study.
    PFC application preparation cost.
    Decision Date: February 10, 2014.

FOR FURTHER INFORMATION CONTACT: Nancy Nistler, Bismarck Airports 
District Office, (612) 253-4638.
    Public Agency: City of Sioux City, Iowa.
    Application Number: 14-06-C-00-SUX.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved In This Decision: $831,205.
    Earliest Charge Effective Date: July 1, 2014.
    Estimated Charge Expiration Date: July 1, 2021.
    Class of Air Carriers Not Required to Collect PFC's: None.
    Brief Description of Projects Approved for Collection and Use: Snow 
removal equipment building.
    Rehabilitate apron (design).
    Rehabilitate apron (construction).
    Acquire snow removal equipment (deicer).
    Rehabilitate terminal building.
    Rehabilitate terminal (loading bridge).
    Install guidance signs.
    Acquire snow removal equipment (broom).
    Update airport master plan study.
    Rehabilitate apron (taxiway).
    Security enhancements.
    Acquire snow removal equipment (broom).
    Decision Date: February 20, 2014.

FOR FURTHER INFORMATION CONTACT: Sheila Bridges, Central Region 
Airports Division, (816) 329-2638.

    Public Agency: City of Valdosta, Georgia.
    Application Number: 14-11-C-00-VLD.
    Application Type: Impose and use a PFC.
    PFC Level: $4.50.
    Total PFC Revenue Approved In This Decision: $247,442.
    Earliest Charge Effective Date: April 1, 2014.
    Estimated Charge Expiration Date: April 1, 2016.
    Class of Air Carriers Not Required to Collect PFC'S: Air taxi/
commercial operators operating at Valdosta Regional Airport (VLD).
    Determination: Approved. Based on information contained in the 
public agency's application, the FAA has determined that the approved 
class accounts for less than 1 percent of the total annual enplanements 
at VLD.
    Brief Description of Projects Approved for Collection and Use: 
Wildlife hazard assessment.
    Design airfield electrical vault and backup generator.
    Design commercial terminal apron expansion.
    Design passenger boarding bridge for commercial terminal.
    Weight bearing capacity study.
    Construct airfield electrical vault and backup generator.
    Prepare PFC application.
    Wildlife hazard management plan.
    Construct commercial terminal apron expansion.
    Brief Description of Disapproved Project: Runway 17 safety area 
improvements.
    Detrmination: Disapproved. This project is not PFC eligible.
    Decision Date: February 26, 2014.

FOR FURTHER INFORMATION CONTACT: Parks Preston, Atlanta Airports 
District Office, (404) 305-7149.

                                           Amendments to PFC Approvals
----------------------------------------------------------------------------------------------------------------
                                                                                     Original         Amended
                                     Amendment       Original         Amended        estimated       estimated
    Amendment No. city, state      approved date   approved net    approved net     charge exp.     charge exp.
                                                    PFC revenue     PFC revenue        date            date
----------------------------------------------------------------------------------------------------------------
05-01-C-01-CIU Kincheloe, MI....         2/06/14      $1,087,463      $1,050,115        07/01/23        02/01/23
04-02-C-01-LMT Klamath Falls, OR         2/06/14         877,799         718,606        12/01/11        12/01/11
06-10-C-01-CMX Calumet, MI......         2/07/14         130,367         125,592        11/01/07        06/01/07
01-06-C-02-ESC Escanaba, MI.....         2/21/14         114,900          78,073        03/01/04        03/01/04
06-08-C-01-ESC Escanaba, MI.....         2/21/14         322,158         322,158        04/01/14        04/01/14
07-04-C-01-GRR Grand Rapids, MI.         2/21/14       5,525,000       7,403,893        05/01/19        12/01/19
00-02-C-02-JNU Juneau, AK.......         2/24/14         407,248         386,514        02/01/01        02/01/01
----------------------------------------------------------------------------------------------------------------


    Issued in Washington, DC, on May 23, 2014.
Joe Hebert,
Manager, Financial Analysis and Passenger Facility Charge Branch.
[FR Doc. 2014-12678 Filed 5-30-14; 8:45 am]
BILLING CODE 4910-13-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.