Northern Natural Gas Company; Notice of Application, 30842-30843 [2014-12365]

Download as PDF 30842 Federal Register / Vol. 79, No. 103 / Thursday, May 29, 2014 / Notices Advisory Council on Historic Preservation at 36 CFR 800.2. l. Wells Rural Electric Company filed a Pre-Application Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. m. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCONlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in paragraph h. n. The licensee states its unequivocal intent to submit an application for a new license for Project No. 848–034. Pursuant to 18 CFR 16.8, 16.9, and 16.10 each application for a new license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by December 31, 2016. o. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: May 21, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–12367 Filed 5–28–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2203–015] tkelley on DSK3SPTVN1PROD with NOTICES Alabama Power Company; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 2203–015. c. Date filed: August 16, 2013. d. Applicant: Alabama Power Company (Alabama Power). VerDate Mar<15>2010 17:19 May 28, 2014 Jkt 232001 e. Name of Project: Holt Hydroelectric Project. f. Location: The existing project is on the Black Warrior River in Tuscaloosa County, Alabama. The project is located on 36.64 acres of federal lands administered by the U.S. Army Corps of Engineers (Corps). g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Mr. Jim Heilbron, Senior Vice President and Senior Production Officer, Alabama Power Company, 600 North 18th Street, P.O. Box 2641, Birmingham, AL 35203– 2206, (205) 257–1000. i. FERC Contact: Jeanne Edwards, Telephone (202) 502–6181, and email Jeanne.edwards@ferc.gov. j. Deadline for filing motions to intervene and protests and requests for cooperating agency status: 60 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file motions to intervene and protests and requests for cooperating agency status using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–2203–015. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted, but is not ready for environmental analysis at this time. l. The Holt Project consist of: (1) An existing 130-foot-long concrete nonoverflow dam; (2) an existing 110-foot long earth fill dam located between the non-overflow structure and the right abutment; and (3) an existing powerhouse containing 1 turbine with an installed capacity of 46,944kilowatts. The remaining dam structures and reservoir are owned and operated by the Corps. The applicant estimates that the total average annual generation would be 153,604,600 kilowatt hours. All generated power is utilized within the applicant’s electric utility system. PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission’s rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application. All filings must (1) bear in all capital letters the title ‘‘PROTEST’’ or ‘‘MOTION TO INTERVENE;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. Dated: May 21, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–12369 Filed 5–28–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP14–489–000] Northern Natural Gas Company; Notice of Application Take notice that on May 16, 2014, Northern Natural Gas Company E:\FR\FM\29MYN1.SGM 29MYN1 tkelley on DSK3SPTVN1PROD with NOTICES Federal Register / Vol. 79, No. 103 / Thursday, May 29, 2014 / Notices (Northern), 1111 South 103rd Street, Omaha, Nebraska 68124, filed in Docket No. CP14–489–000, an application pursuant to section 7(b) of the Natural Gas Act (NGA), to abandon in-place compression facilities at its Tescott compressor station located in Ottawa County, Kansas, all as more fully set forth in the application which is on file with the Commission and open for public inspection. Any questions regarding the applications should be directed to Michael T. Loeffler, Senior Director of Certificates and External Affairs, Northern Natural Gas Company, 1111 South 103rd Street, Omaha, Nebraska 68124, or call 402–398–7103. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 7 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. VerDate Mar<15>2010 17:19 May 28, 2014 Jkt 232001 However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on June 11, 2014. PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 30843 Dated: May 21, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2014–12365 Filed 5–28–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR14–31–000] Tesoro High Plains Pipeline Company LLC; Tesoro Logistics Operations, L.L.C.; Notice of Petition for Declaratory Order Take notice that on May 19, 2014, pursuant to Rule 207(a)(2) of the Federal Energy Regulatory Commission’s (Commission) Rules of Practices and Procedure, 18 CFR 385.207(a)(2)(2014), Tesoro High Plains Pipeline Company LLC and Tesoro Logistics Operations, L.L.C. filed a petition for a declaratory order requesting that the Commission issue an order approving the overall rate design and tariff structure, and priority allocation methodology for an expansion of an existing crude oil pipeline segment between Johnson’s Corner, North Dakota and Ramberg, North Dakota, as more fully explained in the petition. Any person desiring to intervene or to protest in this proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St. NE., Washington, DC 20426. E:\FR\FM\29MYN1.SGM 29MYN1

Agencies

[Federal Register Volume 79, Number 103 (Thursday, May 29, 2014)]
[Notices]
[Pages 30842-30843]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-12365]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP14-489-000]


Northern Natural Gas Company; Notice of Application

    Take notice that on May 16, 2014, Northern Natural Gas Company

[[Page 30843]]

(Northern), 1111 South 103rd Street, Omaha, Nebraska 68124, filed in 
Docket No. CP14-489-000, an application pursuant to section 7(b) of the 
Natural Gas Act (NGA), to abandon in-place compression facilities at 
its Tescott compressor station located in Ottawa County, Kansas, all as 
more fully set forth in the application which is on file with the 
Commission and open for public inspection.
    Any questions regarding the applications should be directed to 
Michael T. Loeffler, Senior Director of Certificates and External 
Affairs, Northern Natural Gas Company, 1111 South 103rd Street, Omaha, 
Nebraska 68124, or call 402-398-7103.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 7 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and 7 copies of the protest or intervention to the 
Federal Energy regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on June 11, 2014.

    Dated: May 21, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-12365 Filed 5-28-14; 8:45 am]