Download as PDF Federal Register / Vol. 79, No. 102 / Wednesday, May 28, 2014 / Notices Docket Numbers: ER14–1992–000. Applicants: Dynegy Danskammer, L.L.C. Description: Notice of Cancellation to be effective 5/21/2014. Filed Date: 5/20/14. Accession Number: 20140520–5074. Comments Due: 5 p.m. e.t. 6/10/14. Docket Numbers: ER14–1993–000. Applicants: Southwest Power Pool, Inc. Description: Loss Compensation Clarification to be effective 7/19/2014. Filed Date: 5/20/14. Accession Number: 20140520–5130. Comments Due: 5 p.m. e.t. 6/10/14. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 20, 2014. Nathaniel J. Davis, Sr., Deputy Secretary. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP14–70–000] National Fuel Gas Supply Corporation; Notice of Onsite Environmental Review emcdonald on DSK67QTVN1PROD with NOTICES [FR Doc. 2014–12193 Filed 5–27–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission WBI Energy Transmission, Inc.; Notice of Request Under Blanket Authorization BILLING CODE 6717–01–P On May 28, 2014, the Office of Energy Projects staff will be in Washington, Allegheny and Beaver Counties, Pennsylvania, to gather data related to the environmental analysis of the proposed West Side Expansion and Modernization Project (Project). Staff will examine Project areas by car, which includes segments of the proposed pipeline route. This will assist staff in completing its evaluation of environmental impacts of the proposed project. Viewing of this area is anticipated to be from public access 16:58 May 27, 2014 Dated: May 20, 2014. Kimberly D. Bose, Secretary. [Docket No. CP14–484–000] [FR Doc. 2014–12322 Filed 5–27–14; 8:45 am] VerDate Mar<15>2010 points and National Fuel Gas Supply Corporation’s right-of-way. All interested parties planning to attend must provide their own transportation. Those attending should meet at the following location: Wednesday, May 28, 2014 at 9:00 a.m., Janoski’s Farm and Greenhouse, 1714 U.S. 30, Clinton, PA 15026, (Parking lot). Please use the FERC’s free eSubscription service to keep track of all formal issuances and submittals in this docket. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. To register for this service, go to www.ferc.gov/docs-filing/ esubscription.asp. Information about specific onsite environmental reviews is posted on the Commission’s calendar at https:// www.ferc.gov/EventCalendar/ EventsList.aspx. For additional information, contact the Office of External Affairs at (866) 208–FERC. Jkt 232001 Take notice that on May 9, 2014 WBI Energy Transmission, Inc. (WBI Energy), 1250 West Century Avenue, Bismarck, North Dakota 58503, filed in the above Docket, a prior notice request pursuant to sections 157.205 and 157.210 of the Commission’s regulations under the Natural Gas Act (NGA) and WBI Energy’s blanket authorization in CP82– 487–000 et al., for authorization to construct and operate approximately 16.8 miles of 12-inch diameter steel pipeline located in Butte and Lawrence Counties, South Dakota, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online PO 00000 Frm 00063 Fmt 4703 Sfmt 4703 30601 Support at FERCOnlineSupport@ ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to Keith A. Tiggelaar, Director of Regulatory Affairs, WBI Energy Transmission, Inc., 1250 West Century Avenue, Bismarck, North Dakota 58503, (701) 530–1560 (email: keith.tiggelaar@wbienergy.com). Specifically, WBI Energy proposes to construct pipeline from approximately 1 mile northeast of the town of Belle Fourche to approximately 1.5 miles northwest of the town of Whitewood. Proposed pipeline will run parallel to WBI Energy’s existing line. The pipeline maximum allowable operating pressure will be 470 psi. WBI Energy states that proposed pipeline is required to provide 12,500 dekatherms per day of additional incremental firm service to MontanaDakota Unilities Co. (Montana-Dakota). This capacity is under a precedent agreement between WBI Energy and Montana-Dakota. Target construction start date is June, 2014. Target service date is November 1, 2014. WBI Energy states that the project will cost approximately $10.5 million. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the E:\FR\FM\28MYN1.SGM 28MYN1

Agencies

[Federal Register Volume 79, Number 102 (Wednesday, May 28, 2014)]
[Notices]
[Page 30601]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-12193]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP14-70-000]


National Fuel Gas Supply Corporation; Notice of Onsite 
Environmental Review

    On May 28, 2014, the Office of Energy Projects staff will be in 
Washington, Allegheny and Beaver Counties, Pennsylvania, to gather data 
related to the environmental analysis of the proposed West Side 
Expansion and Modernization Project (Project). Staff will examine 
Project areas by car, which includes segments of the proposed pipeline 
route. This will assist staff in completing its evaluation of 
environmental impacts of the proposed project. Viewing of this area is 
anticipated to be from public access points and National Fuel Gas 
Supply Corporation's right-of-way.
    All interested parties planning to attend must provide their own 
transportation. Those attending should meet at the following location:

Wednesday, May 28, 2014 at 9:00 a.m., Janoski's Farm and Greenhouse, 
1714 U.S. 30, Clinton, PA 15026, (Parking lot).

    Please use the FERC's free eSubscription service to keep track of 
all formal issuances and submittals in this docket. This can reduce the 
amount of time you spend researching proceedings by automatically 
providing you with notification of these filings, document summaries, 
and direct links to the documents. To register for this service, go to 
www.ferc.gov/docs-filing/esubscription.asp.
    Information about specific onsite environmental reviews is posted 
on the Commission's calendar at https://www.ferc.gov/EventCalendar/EventsList.aspx. For additional information, contact the Office of 
External Affairs at (866) 208-FERC.

    Dated: May 20, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-12193 Filed 5-27-14; 8:45 am]
BILLING CODE 6717-01-P