National Fuel Gas Supply Corporation; Notice of Onsite Environmental Review, 30601 [2014-12193]
Download as PDF
Federal Register / Vol. 79, No. 102 / Wednesday, May 28, 2014 / Notices
Docket Numbers: ER14–1992–000.
Applicants: Dynegy Danskammer,
L.L.C.
Description: Notice of Cancellation to
be effective 5/21/2014.
Filed Date: 5/20/14.
Accession Number: 20140520–5074.
Comments Due: 5 p.m. e.t. 6/10/14.
Docket Numbers: ER14–1993–000.
Applicants: Southwest Power Pool,
Inc.
Description: Loss Compensation
Clarification to be effective 7/19/2014.
Filed Date: 5/20/14.
Accession Number: 20140520–5130.
Comments Due: 5 p.m. e.t. 6/10/14.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 20, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–70–000]
National Fuel Gas Supply Corporation;
Notice of Onsite Environmental Review
emcdonald on DSK67QTVN1PROD with NOTICES
[FR Doc. 2014–12193 Filed 5–27–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
WBI Energy Transmission, Inc.; Notice
of Request Under Blanket
Authorization
BILLING CODE 6717–01–P
On May 28, 2014, the Office of Energy
Projects staff will be in Washington,
Allegheny and Beaver Counties,
Pennsylvania, to gather data related to
the environmental analysis of the
proposed West Side Expansion and
Modernization Project (Project). Staff
will examine Project areas by car, which
includes segments of the proposed
pipeline route. This will assist staff in
completing its evaluation of
environmental impacts of the proposed
project. Viewing of this area is
anticipated to be from public access
16:58 May 27, 2014
Dated: May 20, 2014.
Kimberly D. Bose,
Secretary.
[Docket No. CP14–484–000]
[FR Doc. 2014–12322 Filed 5–27–14; 8:45 am]
VerDate Mar<15>2010
points and National Fuel Gas Supply
Corporation’s right-of-way.
All interested parties planning to
attend must provide their own
transportation. Those attending should
meet at the following location:
Wednesday, May 28, 2014 at 9:00 a.m.,
Janoski’s Farm and Greenhouse, 1714
U.S. 30, Clinton, PA 15026, (Parking
lot).
Please use the FERC’s free
eSubscription service to keep track of all
formal issuances and submittals in this
docket. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. To register for this service,
go to www.ferc.gov/docs-filing/
esubscription.asp.
Information about specific onsite
environmental reviews is posted on the
Commission’s calendar at https://
www.ferc.gov/EventCalendar/
EventsList.aspx. For additional
information, contact the Office of
External Affairs at (866) 208–FERC.
Jkt 232001
Take notice that on May 9, 2014 WBI
Energy Transmission, Inc. (WBI Energy),
1250 West Century Avenue, Bismarck,
North Dakota 58503, filed in the above
Docket, a prior notice request pursuant
to sections 157.205 and 157.210 of the
Commission’s regulations under the
Natural Gas Act (NGA) and WBI
Energy’s blanket authorization in CP82–
487–000 et al., for authorization to
construct and operate approximately
16.8 miles of 12-inch diameter steel
pipeline located in Butte and Lawrence
Counties, South Dakota, all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
PO 00000
Frm 00063
Fmt 4703
Sfmt 4703
30601
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions concerning this
application may be directed to Keith A.
Tiggelaar, Director of Regulatory Affairs,
WBI Energy Transmission, Inc., 1250
West Century Avenue, Bismarck, North
Dakota 58503, (701) 530–1560 (email:
keith.tiggelaar@wbienergy.com).
Specifically, WBI Energy proposes to
construct pipeline from approximately 1
mile northeast of the town of Belle
Fourche to approximately 1.5 miles
northwest of the town of Whitewood.
Proposed pipeline will run parallel to
WBI Energy’s existing line. The pipeline
maximum allowable operating pressure
will be 470 psi. WBI Energy states that
proposed pipeline is required to provide
12,500 dekatherms per day of additional
incremental firm service to MontanaDakota Unilities Co. (Montana-Dakota).
This capacity is under a precedent
agreement between WBI Energy and
Montana-Dakota. Target construction
start date is June, 2014. Target service
date is November 1, 2014. WBI Energy
states that the project will cost
approximately $10.5 million.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
Natural Gas Act (NGA) (18 CFR 157.205)
file a protest to the request. If no protest
is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
E:\FR\FM\28MYN1.SGM
28MYN1
Agencies
[Federal Register Volume 79, Number 102 (Wednesday, May 28, 2014)]
[Notices]
[Page 30601]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-12193]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP14-70-000]
National Fuel Gas Supply Corporation; Notice of Onsite
Environmental Review
On May 28, 2014, the Office of Energy Projects staff will be in
Washington, Allegheny and Beaver Counties, Pennsylvania, to gather data
related to the environmental analysis of the proposed West Side
Expansion and Modernization Project (Project). Staff will examine
Project areas by car, which includes segments of the proposed pipeline
route. This will assist staff in completing its evaluation of
environmental impacts of the proposed project. Viewing of this area is
anticipated to be from public access points and National Fuel Gas
Supply Corporation's right-of-way.
All interested parties planning to attend must provide their own
transportation. Those attending should meet at the following location:
Wednesday, May 28, 2014 at 9:00 a.m., Janoski's Farm and Greenhouse,
1714 U.S. 30, Clinton, PA 15026, (Parking lot).
Please use the FERC's free eSubscription service to keep track of
all formal issuances and submittals in this docket. This can reduce the
amount of time you spend researching proceedings by automatically
providing you with notification of these filings, document summaries,
and direct links to the documents. To register for this service, go to
www.ferc.gov/docs-filing/esubscription.asp.
Information about specific onsite environmental reviews is posted
on the Commission's calendar at https://www.ferc.gov/EventCalendar/EventsList.aspx. For additional information, contact the Office of
External Affairs at (866) 208-FERC.
Dated: May 20, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-12193 Filed 5-27-14; 8:45 am]