Notice of Cancellation of Environmental Impact Statement for the Proposed Hermosa West Wind Energy Project, Albany County, Wyoming, 29759 [2014-12003]
Download as PDF
Federal Register / Vol. 79, No. 100 / Friday, May 23, 2014 / Notices
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: May 16, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014–11938 Filed 5–22–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Western Area Power Administration
[DOE/EIS–0438]
Notice of Cancellation of
Environmental Impact Statement for
the Proposed Hermosa West Wind
Energy Project, Albany County,
Wyoming
Western Area Power
Administration, DOE.
ACTION: Notice of Cancellation of
Environmental Impact Statement.
AGENCY:
The U.S. Department of
Energy (DOE), Western Area Power
Administration (Western) is issuing this
notice to advise the public that it is
cancelling the preparation of an
environmental impact statement (EIS)
under the National Environmental
Policy Act (NEPA) on an
interconnection request by Shell
WindEnergy, Inc. (SWE).
DATES: This cancellation is effective on
May 23, 2014.
FOR FURTHER INFORMATION CONTACT: For
additional information on the
cancellation of this EIS process, contact
Mark Wieringa, NEPA Document
Manager, Western Area Power
Administration, P.O. Box 281213,
Lakewood, CO 80228–8213, email
mstockstill on DSK4VPTVN1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
18:44 May 22, 2014
Jkt 232001
wieringa@wapa.gov, telephone (720)
962–7448. For general information on
DOE’s NEPA review process, contact
Carol M. Borgstrom, Director of NEPA
Policy and Compliance, GC–54,
Department of Energy, 1000
Independence Avenue SW.,
Washington, DC 20585–0119, telephone
(202) 586–4600 or (800) 472–2756,
facsimile (202) 586–7031.
SWE
proposed to design, construct, operate,
and maintain an up to 300-megawatt
Hermosa West Wind Energy Project
(Project) in Albany County, Wyoming,
and interconnect that Project with
Western’s transmission system. SWE’s
interconnection request caused Western
to initiate a NEPA review of its Federal
action to allow the interconnection.
Western published a Notice of Intent for
the EIS in the Federal Register on
January 14, 2010 (75 FR 2138), and
started the EIS process. Public scoping
meetings were held subsequent to the
Notice of Intent, and a Draft EIS was
approved by Western’s acting
Administrator for public review and
comment on September 24, 2012. The
Environmental Protection Agency’s
Notice of Availability for the Draft EIS
was published on October 5, 2012 (77
FR 60986). Public hearings on the Draft
EIS were held on October 29 and 30,
2012, in Laramie and Cheyenne,
Wyoming, respectively. SWE has since
decided to suspend further action on its
proposed Project. SWE notified Western
of their decision to withdraw their
interconnection request and Western is
now terminating the NEPA review
process on its interconnection decision
and SWE’s proposed Project. No Final
EIS or Record of Decision will be issued
for the Hermosa West Wind Energy
Project. SWE could decide to reinitiate
the proposed Project at some future
date. In that event Western would issue
a new Notice of Intent, and would
initiate an entirely new NEPA process.
On November 16, 2011, the DOE
General Counsel re-delegated all EIS
authorities to Western’s Administrator.
Under the authority granted by that
memorandum, I have terminated the
NEPA process for SWE’s proposed
Hermosa West Wind Energy Project
with the publication of this notice.
SUPPLEMENTARY INFORMATION:
Dated: May 5, 2014.
Mark A. Gabriel,
Administrator.
[FR Doc. 2014–12003 Filed 5–22–14; 8:45 am]
BILLING CODE 6450–01–P
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
29759
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9015–1]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7146 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 05/12/2014 Through 05/16/2014
Pursuant to 40 CFR 1506.9.
Notice: Section 309(a) of the Clean Air
Act requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html.
EIS No. 20140150, Final EIS, NMFS,
AK, Steller Sea Lion Protection
Measures for Groundfish Fisheries in
the Bering Sea and Aleutian Islands
Management Area, Review Period
Ends: 06/23/2014, Contact: Gretchen
Harrington, 907–586–7228.
EIS No. 20140151, Draft EIS, USFWS,
VA, Chincoteague and Wallops Island
National Wildlife Refuges Draft
Comprehensive Conservation Plan,
Comment Period Ends: 07/15/2014,
Contact: Thomas Bonetti 413–253–
8307.
EIS No. 20140152, Final EIS, FERC, ME,
Downeast Liquefied Natural Gas
(LNG) Project, Review Period Ends:
06/23/2014, Contact: Shannon Crosley
202–502–8853.
EIS No. 20140153, Draft EIS, NPS, NC,
Cape Lookout National Seashore OffRoad Vehicle Management Plan,
Comment Period Ends: 07/21/2014,
Contact: Michael B. Edwards 303–
969–2694.
AMENDED NOTICES
EIS No. 20140147, Draft EIS, USFS, CA,
Rim Fire Recovery, Comment Period
Ends: 06/16/2014, Contact: Maria
Benech 209–532–3671, Revision to FR
Notice Published 05/16/2014;
Correction to reduce comment period
from 06/30/2014 to 06/16/2014
reflecting the President’s Council on
Environmental Quality (CEQ)
alternative arrangement granted in
accordance with 40 CFR 1506.11 on
December 9, 2013. Among these
alternative arrangements, CEQ
specifically approved shortening the
public comment for this DEIS from 45
to 30 days.
E:\FR\FM\23MYN1.SGM
23MYN1
Agencies
[Federal Register Volume 79, Number 100 (Friday, May 23, 2014)]
[Notices]
[Page 29759]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-12003]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Western Area Power Administration
[DOE/EIS-0438]
Notice of Cancellation of Environmental Impact Statement for the
Proposed Hermosa West Wind Energy Project, Albany County, Wyoming
AGENCY: Western Area Power Administration, DOE.
ACTION: Notice of Cancellation of Environmental Impact Statement.
-----------------------------------------------------------------------
SUMMARY: The U.S. Department of Energy (DOE), Western Area Power
Administration (Western) is issuing this notice to advise the public
that it is cancelling the preparation of an environmental impact
statement (EIS) under the National Environmental Policy Act (NEPA) on
an interconnection request by Shell WindEnergy, Inc. (SWE).
DATES: This cancellation is effective on May 23, 2014.
FOR FURTHER INFORMATION CONTACT: For additional information on the
cancellation of this EIS process, contact Mark Wieringa, NEPA Document
Manager, Western Area Power Administration, P.O. Box 281213, Lakewood,
CO 80228-8213, email wieringa@wapa.gov, telephone (720) 962-7448. For
general information on DOE's NEPA review process, contact Carol M.
Borgstrom, Director of NEPA Policy and Compliance, GC-54, Department of
Energy, 1000 Independence Avenue SW., Washington, DC 20585-0119,
telephone (202) 586-4600 or (800) 472-2756, facsimile (202) 586-7031.
SUPPLEMENTARY INFORMATION: SWE proposed to design, construct, operate,
and maintain an up to 300-megawatt Hermosa West Wind Energy Project
(Project) in Albany County, Wyoming, and interconnect that Project with
Western's transmission system. SWE's interconnection request caused
Western to initiate a NEPA review of its Federal action to allow the
interconnection. Western published a Notice of Intent for the EIS in
the Federal Register on January 14, 2010 (75 FR 2138), and started the
EIS process. Public scoping meetings were held subsequent to the Notice
of Intent, and a Draft EIS was approved by Western's acting
Administrator for public review and comment on September 24, 2012. The
Environmental Protection Agency's Notice of Availability for the Draft
EIS was published on October 5, 2012 (77 FR 60986). Public hearings on
the Draft EIS were held on October 29 and 30, 2012, in Laramie and
Cheyenne, Wyoming, respectively. SWE has since decided to suspend
further action on its proposed Project. SWE notified Western of their
decision to withdraw their interconnection request and Western is now
terminating the NEPA review process on its interconnection decision and
SWE's proposed Project. No Final EIS or Record of Decision will be
issued for the Hermosa West Wind Energy Project. SWE could decide to
reinitiate the proposed Project at some future date. In that event
Western would issue a new Notice of Intent, and would initiate an
entirely new NEPA process.
On November 16, 2011, the DOE General Counsel re-delegated all EIS
authorities to Western's Administrator. Under the authority granted by
that memorandum, I have terminated the NEPA process for SWE's proposed
Hermosa West Wind Energy Project with the publication of this notice.
Dated: May 5, 2014.
Mark A. Gabriel,
Administrator.
[FR Doc. 2014-12003 Filed 5-22-14; 8:45 am]
BILLING CODE 6450-01-P