Federal Register / Vol. 79, No. 99 / Thursday, May 22, 2014 / Notices
agencies provided input to the
conclusions and recommendations
presented in the EIS, the agencies will
present their own conclusions and
recommendations in their respective
Records of Decision or other
determinations for the project.
The final EIS addresses the potential
environmental effects of the
construction and operation of the
following project facilities:
• A new marine terminal that would
include a 3,862-foot-long pier with a
single berth and vessel mooring system,
intended to handle LNG vessels ranging
from 70,000 to 165,000 cubic meters in
capacity, with future expansion
capabilities to handle vessels with
220,000 cubic meters of cargo capacity;
• two full-containment LNG storage
tanks, each with a nominal usable
storage capacity of 160,000 cubic
meters;
• LNG vaporization and processing
equipment;
• piping, ancillary buildings, safety
systems, and other support facilities;
• three vapor fences around the LNG
terminal;
• a 29.8-mile-long, 30-inch-diameter
underground natural gas pipeline;
• natural gas metering facilities
located at the LNG terminal site; and
• various ancillary facilities including
pigging 1 facilities and three mainline
block valves.
The FERC staff mailed copies of the
EIS to Federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
newspapers and libraries in the project
area; and parties to this proceeding.
Everyone on our environmental
mailing list will receive a CD version of
the final EIS. Paper copy versions of the
EIS were mailed to those specifically
requesting them. Only volume 1 of the
final EIS, containing text of the analysis,
was printed in hard copy. Volume 2,
containing additional appendices, was
produced as .pdf files on a CD.
Responses to comments received on the
draft EIS and Supplemental draft EIS are
included in Appendix S and T,
respectively. In addition, the EIS is
available for public viewing on the
FERC’s Web site (www.ferc.gov) using
the eLibrary link. A limited number of
copies are available for distribution and
public inspection at: Federal Energy
Regulatory Commission, Public
Reference Room, 888 First Street NE.,
1A
‘‘pig’’ is a tool for cleaning and inspecting the
inside of a pipeline.
VerDate Mar<15>2010
19:36 May 21, 2014
Jkt 232001
Room 2A, Washington, DC 20426, (202)
502–8371.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site (www.ferc.gov) using the eLibrary
link. Click on the eLibrary link, click on
‘‘General Search,’’ and enter the docket
number excluding the last three digits in
the Docket Number field (i.e., CP07–52
or CP07–53). Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676; for TTY,
contact (202) 502–8659. The eLibrary
link also provides access to the texts of
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
29437
3525. All correspondence should be
forwarded to: Mr. Steve West, Desert
Power Company, P.O. Box 609, Rock
Springs, WY 82902.
Dated: May 15, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–11872 Filed 5–21–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM13–5–000]
Version 5 Critical Infrastructure
Protection Reliability Standards;
Notice of Filing
1. By letter filed November 27, 2013,
Bolthouse Properties, LLC informed the
Commission that the exemption from
licensing for the Cottonwood Canyon
Ranch Hydroelectric Project, FERC No.
3525, originally issued March 5, 1982,1
has been transferred to Desert Power
Company. The project is located on the
existing Cottonwood Canyon and Lone
Tree Canyon aqueducts in Mono
County, California. The transfer of an
exemption does not require Commission
approval.
2. Desert Power Company is now the
exemptee of the Cottonwood Canyon
Ranch Hydroelectric Project, FERC No.
Take notice that on May15, 2014, the
North American Electric Reliability
Corporation (NERC) filed proposed
revisions to certain Violation Risk
Factors and Violations Severity Levels
assigned to certain Critical
Infrastructure Protection Reliability
Standards for Federal Energy Regulatory
Commission approval, pursuant to
Order No. 791.1
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC
There is an ‘‘eSubscription’’ link on the
1 18 FERC ¶ 62,392, Order Granting Exemption
from Licensing for a Conduit Hydroelectric Project
(1982).
1 Version 5 Critical Infrastructure Protection
Reliability Standards, Order No. 791, 145 FERC
¶ 61,160 (2013).
Dated: May 15, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–11861 Filed 5–21–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3525–002]
Bolthouse Properties, LLC, Desert
Power Company; Notice of Transfer of
Exemption
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
E:\FR\FM\22MYN1.SGM
22MYN1
Agencies
[Federal Register Volume 79, Number 99 (Thursday, May 22, 2014)]
[Notices]
[Page 29437]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-11872]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 3525-002]
Bolthouse Properties, LLC, Desert Power Company; Notice of
Transfer of Exemption
1. By letter filed November 27, 2013, Bolthouse Properties, LLC
informed the Commission that the exemption from licensing for the
Cottonwood Canyon Ranch Hydroelectric Project, FERC No. 3525,
originally issued March 5, 1982,\1\ has been transferred to Desert
Power Company. The project is located on the existing Cottonwood Canyon
and Lone Tree Canyon aqueducts in Mono County, California. The transfer
of an exemption does not require Commission approval.
---------------------------------------------------------------------------
\1\ 18 FERC ] 62,392, Order Granting Exemption from Licensing
for a Conduit Hydroelectric Project (1982).
---------------------------------------------------------------------------
2. Desert Power Company is now the exemptee of the Cottonwood
Canyon Ranch Hydroelectric Project, FERC No. 3525. All correspondence
should be forwarded to: Mr. Steve West, Desert Power Company, P.O. Box
609, Rock Springs, WY 82902.
Dated: May 15, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-11872 Filed 5-21-14; 8:45 am]