Tennessee Gas Pipeline Company, L.L.C.; Notice of Request Under Blanket Authorization, 29441-29442 [2014-11870]

Download as PDF Federal Register / Vol. 79, No. 99 / Thursday, May 22, 2014 / Notices Dated: May 16, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–11869 Filed 5–21–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP14–478–000] mstockstill on DSK4VPTVN1PROD with NOTICES Columbia Gulf Transmission, LLC; Notice of Request Under Blanket Authorization Take notice that on May 7, 2014, Columbia Gulf Transmission, LLC (Columbia Gulf), having its principal office at 5151 San Felipe, Suite 2500, Houston, TX 77056, filed in Docket No. CP14–478–000, a prior notice request pursuant to sections 157.205, 157.209 and 157.210 of the Commission’s Regulations under the Natural Gas Act (NGA). Columbia Gulf seeks authorization to (1) convert a temporary compressor unit located at the site of the Hartsville Compressor Station, located in Macon County, Tennessee, to permanent standby service, (2) remove temporary facilities no longer required for service, and (3) abandon/reduce the certificated horsepower (hp) of the Hartsville Compressor Station by 6,000 hp, to a total of 45,400 hp. Columbia Gulf proposes to perform these activities under its blanket certificate issued in Docket No. CP83–496–000, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to Fredric J. George, Senior Counsel, Columbia Gas Transmission Corporation, P.O. Box 1273, Charleston, West Virginia 25325– 1273 or by calling (304) 357–2359 or fax (304)357–3206. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to Section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the VerDate Mar<15>2010 19:36 May 21, 2014 Jkt 232001 request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to Section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules (18 CFR 157.9), within 90 days of this Notice, the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenter’s will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenter’s will not be required to serve copies of filed documents on all other parties. However, the non-party commentary, will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 29441 Dated: May 15, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–11863 Filed 5–21–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP14–483–000] Tennessee Gas Pipeline Company, L.L.C.; Notice of Request Under Blanket Authorization Take notice that on May 9, 2014, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed in Docket No. CP14–483–000, a prior notice request pursuant to sections 157.205 and 157.211of the Commission’s regulations under the Natural Gas Act (NGA) as amended, requesting authorization to construct and operate a new delivery point to serve the Hanscom Air Force Base in Middlesex County, Massachusetts. Tennessee proposes to install a threeinch diameter hot tap assembly and appurtenances located on its Line No. 200–1. Tennessee avers that proposed facilities will have the capability of delivering up to 5.76 million cubic feet per day of natural gas. Tennessee estimates the costs of the project to be $561,400, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to Thomas G. Joyce, Manager, Certificates, Tennessee Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Houston, Texas 77002, by telephone at (713) 420– 3299, or by email tom_joyce@ kindermorgan.com. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the E:\FR\FM\22MYN1.SGM 22MYN1 mstockstill on DSK4VPTVN1PROD with NOTICES 29442 Federal Register / Vol. 79, No. 99 / Thursday, May 22, 2014 / Notices time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenter’s will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenter’s will not be required to serve copies of filed documents on all other parties. However, the non-party commentary, will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE., Washington, DC 20426. VerDate Mar<15>2010 19:36 May 21, 2014 Jkt 232001 Dated: May 15, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–11870 Filed 5–21–14; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPPT–2013–0721; FRL–9908–95] Agency Information Collection Activities; Proposed Collection; Comment Request Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: In compliance with the Paperwork Reduction Act (PRA), this document announces that EPA is planning to submit an Information Collection Request (ICR) to the Office of Management and Budget (OMB). The ICR, entitled: ‘‘Partial Update of the TSCA Section 8(b) Inventory Data Base, Production and Site Reports (Chemical Data Reporting)’’ and identified by EPA ICR No. 1884.08 and OMB Control No. 2070–0162, represents the renewal of an existing ICR that is scheduled to expire on January 31, 2105. Before submitting the ICR to OMB for review and approval, EPA is soliciting comments on specific aspects of the proposed information collection that is summarized in this document. The ICR and accompanying material are available in the docket for public review and comment. DATES: Comments must be received on or before July 21, 2014. ADDRESSES: Submit your comments, identified by docket identification (ID) number EPA–HQ–OPPT–2013–0721, by one of the following methods: • Federal eRulemaking Portal: https:// www.regulations.gov. Follow the online instructions for submitting comments. • Mail: Document Control Office (7407M), Office of Pollution Prevention and Toxics (OPPT), Environmental Protection Agency, 1200 Pennsylvania Ave. NW., Washington, DC 20460–0001. • Hand Delivery: OPPT Document Control Office (DCO), EPA East Bldg., Rm. 6428, 1201 Constitution Ave. NW., Washington, DC. ATTN: Docket ID Number EPA–HQ–OPPT–2013–0721. The DCO is open from 8 a.m. to 4 p.m., Monday through Friday, excluding legal holidays. The telephone number for the DCO is (202) 564–8930. Such deliveries are only accepted during the DCO’s normal hours of operation, and special arrangements should be made for deliveries of boxed information. SUMMARY: PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 Instructions: Direct your comments to docket ID number EPA–HQ–OPPT– 2013- 0721. EPA’s policy is that all comments received will be included in the docket without change and may be made available online at https:// www.regulations.gov, including any personal information provided, unless the comment includes information claimed to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Do not submit information that you consider to be CBI or otherwise protected through regulations.gov or email. The regulations.gov Web site is an ‘‘anonymous access’’ system, which means EPA will not know your identity or contact information unless you provide it in the body of your comment. If you send an email comment directly to EPA without going through regulations.gov, your email address will be automatically captured and included as part of the comment that is placed in the docket and made available on the Internet. If you submit an electronic comment, EPA recommends that you include your name and other contact information in the body of your comment and with any disk or CD–ROM you submit. If EPA cannot read your comment due to technical difficulties and cannot contact you for clarification, EPA may not be able to consider your comment. Electronic files should avoid the use of special characters, any form of encryption, and be free of any defects or viruses. Docket: All documents in the docket are listed in the docket index available at https://www.regulations.gov. Although listed in the index, some information is not publicly available, e.g., CBI or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, will be publicly available only in hard copy. Publicly available docket materials are available electronically at https://www.regulations.gov, or, if only available in hard copy, at the OPPT Docket. The OPPT Docket is located in the EPA Docket Center (EPA/DC) at Rm. 3334, EPA West Bldg., 1301 Constitution Ave. NW., Washington, DC. The EPA/DC Public Reading Room hours of operation are 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number of the EPA/DC Public Reading Room is (202) 566–1744, and the telephone number for the OPPT Docket is (202) 566–0280. Docket visitors are required to show photographic identification, pass through a metal detector, and sign the EPA visitor log. All visitor bags are processed through an X-ray machine E:\FR\FM\22MYN1.SGM 22MYN1

Agencies

[Federal Register Volume 79, Number 99 (Thursday, May 22, 2014)]
[Notices]
[Pages 29441-29442]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-11870]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP14-483-000]


Tennessee Gas Pipeline Company, L.L.C.; Notice of Request Under 
Blanket Authorization

    Take notice that on May 9, 2014, Tennessee Gas Pipeline Company, 
L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed 
in Docket No. CP14-483-000, a prior notice request pursuant to sections 
157.205 and 157.211of the Commission's regulations under the Natural 
Gas Act (NGA) as amended, requesting authorization to construct and 
operate a new delivery point to serve the Hanscom Air Force Base in 
Middlesex County, Massachusetts. Tennessee proposes to install a three-
inch diameter hot tap assembly and appurtenances located on its Line 
No. 200-1. Tennessee avers that proposed facilities will have the 
capability of delivering up to 5.76 million cubic feet per day of 
natural gas. Tennessee estimates the costs of the project to be 
$561,400, all as more fully set forth in the application which is on 
file with the Commission and open to public inspection. The filing may 
also be viewed on the web at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, please 
contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free 
at (866) 208-3676, or TTY, contact (202) 502-8659.
    Any questions concerning this application may be directed to Thomas 
G. Joyce, Manager, Certificates, Tennessee Gas Pipeline Company, 
L.L.C., 1001 Louisiana Street, Houston, Texas 77002, by telephone at 
(713) 420-3299, or by email tom_joyce@kindermorgan.com.
    Any person or the Commission's staff may, within 60 days after 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and pursuant to section 157.205 of 
the regulations under the NGA (18 CFR 157.205), a protest to the 
request. If no protest is filed within the

[[Page 29442]]

time allowed therefore, the proposed activity shall be deemed to be 
authorized effective the day after the time allowed for filing a 
protest. If a protest is filed and not withdrawn within 30 days after 
the allowed time for filing a protest, the instant request shall be 
treated as an application for authorization pursuant to section 7 of 
the NGA.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding, or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenter's will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenter's will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentary, will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and 7 copies of the protest or intervention to the 
Federal Energy regulatory Commission, 888 First Street NE., Washington, 
DC 20426.

    Dated: May 15, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-11870 Filed 5-21-14; 8:45 am]
BILLING CODE 6717-01-P