Erie Boulevard Hydropower, L.P.; Notice of Application Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions, 29433-29434 [2014-11864]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 79, No. 99 / Thursday, May 22, 2014 / Notices
Committee will also receive briefings
from the Services and the Joint Staff on
career progression with joint
assignments. The Committee will also
receive a briefing on the recruitment of
women. The meeting will conclude with
a public comment period and wrap-up.
Pursuant to 41 CFR 102–3.105(j) and
102–3.140, and section 10(a)(3) of the
Federal Advisory Committee Act of
1972, interested persons may submit a
written statement for consideration by
the Defense Advisory Committee on
Women in the Services. Individuals
submitting a written statement must
submit their statement to the point of
contact listed at the address in FOR
FURTHER INFORMATION CONTACT no later
than 5:00 p.m., Tuesday, June 10, 2014.
If a written statement is not received by
Tuesday, June 10, 2014, prior to the
meeting, which is the subject of this
notice, then it may not be provided to
or considered by the Defense Advisory
Committee on Women in the Services
until its next open meeting. The
Designated Federal Officer will review
all timely submissions with the Defense
Advisory Committee on Women in the
Services Chair and ensure they are
provided to the members of the Defense
Advisory Committee on Women in the
Services. If members of the public are
interested in making an oral statement,
a written statement should be
submitted. After reviewing the written
comments, the Chair and the Designated
Federal Officer will determine who of
the requesting persons will be able to
make an oral presentation of their issue
during an open portion of this meeting
or at a future meeting. Pursuant to 41
CFR 102–3.140(d), determination of
who will be making an oral presentation
is at the sole discretion of the
Committee Chair and the Designated
Federal Officer and will depend on time
available and if the topics are relevant
to the Committee’s activities. Two
minutes will be allotted to persons
desiring to make an oral presentation.
Oral presentations by members of the
public will be permitted only on Friday
June 13, 2014 from 10:45 a.m. to 11:15
a.m. in front of the full Committee. The
number of oral presentations to be made
will depend on the number of requests
received from members of the public.
Pursuant to 5 U.S.C. 552b and 41 CFR
102–3.140 through 102–3.165, this
meeting is open to the public, subject to
the availability of space.
Meeting agenda:
Thursday, June 12, 2014, from 8:30 a.m.
to 3:00 p.m.
—Welcome, Introductions,
Announcements
—Briefing—Request for Information
Update
VerDate Mar<15>2010
19:36 May 21, 2014
Jkt 232001
— Briefing— SAPRO Briefing
—Briefing— JAMRS Briefing on
Accession of Women
—Briefing— Installation Visit Summary
Friday, June 13, 2014, from 8:30 a.m. to
11:30 a.m.
—Welcome and Announcements
—Briefing— Services and Joint Staff
Briefing on Career Progression with
Joint Assignments
—Briefing— Briefing on the
Recruitment of Women
—Public Comment Period
29433
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 7320–042]
Erie Boulevard Hydropower, L.P.;
Notice of Application Ready for
Environmental Analysis, and Soliciting
Comments, Recommendations, Terms
and Conditions, and Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
Dated: May 19, 2014.
a. Type of Application: New Major
Aaron Siegel,
License
b. Project No.: 7320–042
Alternate OSD Federal Register Liaison
c. Date Filed: July 1, 2013
Officer, Department of Defense.
d. Applicant: Erie Boulevard
[FR Doc. 2014–11845 Filed 5–21–14; 8:45 am]
Hydropower, L.P.
BILLING CODE 5001–06–P
e. Name of Project: Chasm
Hydroelectric Project
f. Location: On the Salmon River in
Franklin County, New York. The project
DEPARTMENT OF DEFENSE
does not occupy any federal lands.
g. Filed Pursuant to: Federal Power
Department of the Army
Act, 16 U.S.C. 791 (a)-825(r)
Certification That Transformation of
h. Applicant Contact: Steven Murphy,
the Army to a Brigade-Oriented
Licensing Manager, Erie Boulevard
Structure Is Completed and Statutory
Hydropower, L.P., 33 West 1st Street
Requirement To Submit an Annual
South, Fulton, New York, 13069, (315)
Report Under Subsection c, Section
598–6130 or email at steven.murphy@
595 of the Ronald W. Reagan National
brookfieldpower.com.
Defense Authorization Act of 2005 Has
i. FERC Contact: John Mudre at (202)
Terminated
502–8902 or email at john.mudre@
ferc.gov.
AGENCY: Department of the Army, DoD.
j. Deadline for filing comments,
recommendations, terms and
ACTION: Notice.
conditions, and prescriptions: 60 days
from the issuance date of this notice;
SUMMARY: In accordance with subsection
reply comments are due 105 days from
c, Section 595 of the Ronald W. Reagan
the issuance date of this notice.
National Defense Authorization Act of
The Commission strongly encourages
2005, the Secretary of the Army has
electronic filing. Please file comments,
certified that the internal transformation
recommendations, terms and
of the Army from a division-oriented
conditions, and prescriptions using the
force to a brigade-oriented force has
Commission’s eFiling system at https://
been completed. Further, in accordance
www.ferc.gov/docs-filing/efiling.asp.
with subsection c, Section 595 of the
Commenters can submit brief comments
Ronald W. Reagan National Defense
up to 6,000 characters, without prior
Authorization Act of 2005, the statutory
registration, using the eComment system
requirement to submit an annual report
at https://www.ferc.gov/docs-filing/
is therefore terminated.
ecomment.asp. You must include your
name and contact information at the end
DATES: Certification and termination of
of your comments. For assistance,
statutory requirement for an annual
please contact FERC Online Support at
report effective date is March 31, 2014.
FERCOnlineSupport@ferc.gov, (866)
FOR FURTHER INFORMATION CONTACT:
208–3676 (toll free), or (202) 502–8659
HQDA, G–3/5/7, DAMO–ZT, Mr. John
(TTY). In lieu of electronic filing, please
S. Chappell, (703) 614–8283.
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
SUPPLEMENTARY INFORMATION: None.
First Street NE., Washington, DC 20426.
Gary H. Cheek,
The first page of any filing should
Major General, U.S. Army, Assistant Deputy
include docket number P–7320–042.
Chief of Staff, G–3/5/7.
The Commission’s Rules of Practice
[FR Doc. 2014–11853 Filed 5–21–14; 8:45 am]
require all intervenors filing documents
with the Commission to serve a copy of
BILLING CODE 3710–08–P
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
E:\FR\FM\22MYN1.SGM
22MYN1
mstockstill on DSK4VPTVN1PROD with NOTICES
29434
Federal Register / Vol. 79, No. 99 / Thursday, May 22, 2014 / Notices
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted,
and is ready for environmental analysis
at this time.
l. Project Description: The existing
Chasm Project consists of: (1) a 201-footlong, 32-foot-high maximum height
concrete gravity-type dam having a
spillway section with crest elevation
1,283.8 feet mean sea level (msl) about
100 feet long, surmounted by 2-foothigh flashboards and having an intake
section with steel trash racks and
headgates; (2) a reservoir having a
surface area of about 22 acres and a
gross storage capacity of 74 acre-feet at
normal pool elevation of 1,285.8 feet
msl; (3) a 7-foot-diameter welded steel
pipeline approximately 3,355 feet in
length connecting to a 6-foot-diameter
steel manifold pipeline just upstream of
the powerhouse; (4) a powerhouse
containing three Francis-type generating
units having a total rated capacity of
3,350 kilowatts operated under a 268foot head and at a flow of 195 cubic feet
per second (cfs); (5) a 20-foot-wide, 850foot-long tailrace; (6) three 2.2-kilovolt
generator leads extending from the
powerhouse about 74 feet to an adjacent
swithchyard; (7) a 4.2-megavolt-ampere
step-up transformer located within the
switchyard, connecting to a
transmission line owned and operated
by the National Grid Corporation; and
(8) appurtenant facilities.
Erie proposes a minimum flow of 15
cfs into the bypassed reach at all times
and would forego its existing ability to
lower the minimum bypass flow to 10
cfs when inflow is less than 85 cfs. In
addition, Erie proposes to maintain the
impoundment elevation within 0.1 foot
of the spillway crest (or flashboards,
when installed) when inflow is less than
85 cfs and 0.25 foot when inflow is
greater than 85 cfs.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
All filings must (1) bear in all capital
letters the title ‘‘COMMENTS,’’ ‘‘REPLY
VerDate Mar<15>2010
19:36 May 21, 2014
Jkt 232001
COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
o. Procedural Schedule: The
application will be processed according
to the following revised Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Target date
Filing of comments, recommendations, terms and
conditions, and prescriptions.
Reply Comments Due ...........
Commission Issues Single
EA.
Comments on Single EA due
July 2014
August 2014
December
2014
January 2014
Dated: May 16, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–11864 Filed 5–21–14; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14538–001]
Go with the Flow Hydro Power, LLC;
Notice of Application Tendered for
Filing With the Commission and
Soliciting Additional Study Requests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Exemption
From Licensing
b. Project No.: P–14538
c. Date filed: May 5, 2014
d. Applicant: Go with the Flow Hydro
Power, LLC
e. Name of Project: Go with the Flow
Hydroelectric Project
f. Location: The proposed project is
located on the Umatilla River,
approximately 1.3 miles southwest of
the city of Hermiston, Umatilla County,
Oregon. The proposed project would not
occupy any federal lands.
g. Filed Pursuant to: Public Utility
Regulatory Policies Act of 1978, 16
U.S.C. 2705, 2708.
h. Applicant Contact: Mark Sigl, Go
with the Flow Hydro Power, LLC, 8021
Firestone Way, Antelope, California
95843
i. FERC Contact: Sean O’Neill at (202)
502–6462; or email at sean.oneill@
ferc.gov
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: July 7, 2014
E:\FR\FM\22MYN1.SGM
22MYN1
Agencies
[Federal Register Volume 79, Number 99 (Thursday, May 22, 2014)]
[Notices]
[Pages 29433-29434]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-11864]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 7320-042]
Erie Boulevard Hydropower, L.P.; Notice of Application Ready for
Environmental Analysis, and Soliciting Comments, Recommendations, Terms
and Conditions, and Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License
b. Project No.: 7320-042
c. Date Filed: July 1, 2013
d. Applicant: Erie Boulevard Hydropower, L.P.
e. Name of Project: Chasm Hydroelectric Project
f. Location: On the Salmon River in Franklin County, New York. The
project does not occupy any federal lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r)
h. Applicant Contact: Steven Murphy, Licensing Manager, Erie
Boulevard Hydropower, L.P., 33 West 1st Street South, Fulton, New York,
13069, (315) 598-6130 or email at steven.murphy@brookfieldpower.com.
i. FERC Contact: John Mudre at (202) 502-8902 or email at
john.mudre@ferc.gov.
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions: 60 days from the issuance date of this
notice; reply comments are due 105 days from the issuance date of this
notice.
The Commission strongly encourages electronic filing. Please file
comments, recommendations, terms and conditions, and prescriptions
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-7320-042.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of
[[Page 29434]]
that document on each person on the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. This application has been accepted, and is ready for
environmental analysis at this time.
l. Project Description: The existing Chasm Project consists of: (1)
a 201-foot-long, 32-foot-high maximum height concrete gravity-type dam
having a spillway section with crest elevation 1,283.8 feet mean sea
level (msl) about 100 feet long, surmounted by 2-foot-high flashboards
and having an intake section with steel trash racks and headgates; (2)
a reservoir having a surface area of about 22 acres and a gross storage
capacity of 74 acre-feet at normal pool elevation of 1,285.8 feet msl;
(3) a 7-foot-diameter welded steel pipeline approximately 3,355 feet in
length connecting to a 6-foot-diameter steel manifold pipeline just
upstream of the powerhouse; (4) a powerhouse containing three Francis-
type generating units having a total rated capacity of 3,350 kilowatts
operated under a 268-foot head and at a flow of 195 cubic feet per
second (cfs); (5) a 20-foot-wide, 850-foot-long tailrace; (6) three
2.2-kilovolt generator leads extending from the powerhouse about 74
feet to an adjacent swithchyard; (7) a 4.2-megavolt-ampere step-up
transformer located within the switchyard, connecting to a transmission
line owned and operated by the National Grid Corporation; and (8)
appurtenant facilities.
Erie proposes a minimum flow of 15 cfs into the bypassed reach at
all times and would forego its existing ability to lower the minimum
bypass flow to 10 cfs when inflow is less than 85 cfs. In addition,
Erie proposes to maintain the impoundment elevation within 0.1 foot of
the spillway crest (or flashboards, when installed) when inflow is less
than 85 cfs and 0.25 foot when inflow is greater than 85 cfs.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
All filings must (1) bear in all capital letters the title
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. A copy of any protest or
motion to intervene must be served upon each representative of the
applicant specified in the particular application. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. A license applicant must file no later than 60 days following
the date of issuance of this notice: (1) A copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying agency received the request;
or (3) evidence of waiver of water quality certification.
o. Procedural Schedule: The application will be processed according
to the following revised Hydro Licensing Schedule. Revisions to the
schedule may be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Filing of comments, recommendations, terms July 2014
and conditions, and prescriptions.
Reply Comments Due........................ August 2014
Commission Issues Single EA............... December 2014
Comments on Single EA due................. January 2014
------------------------------------------------------------------------
Dated: May 16, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-11864 Filed 5-21-14; 8:45 am]
BILLING CODE 6717-01-P