Columbia Gulf Transmission, LLC; Notice of Request Under Blanket Authorization, 29441 [2014-11863]
Download as PDF
Federal Register / Vol. 79, No. 99 / Thursday, May 22, 2014 / Notices
Dated: May 16, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–11869 Filed 5–21–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–478–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Columbia Gulf Transmission, LLC;
Notice of Request Under Blanket
Authorization
Take notice that on May 7, 2014,
Columbia Gulf Transmission, LLC
(Columbia Gulf), having its principal
office at 5151 San Felipe, Suite 2500,
Houston, TX 77056, filed in Docket No.
CP14–478–000, a prior notice request
pursuant to sections 157.205, 157.209
and 157.210 of the Commission’s
Regulations under the Natural Gas Act
(NGA). Columbia Gulf seeks
authorization to (1) convert a temporary
compressor unit located at the site of the
Hartsville Compressor Station, located
in Macon County, Tennessee, to
permanent standby service, (2) remove
temporary facilities no longer required
for service, and (3) abandon/reduce the
certificated horsepower (hp) of the
Hartsville Compressor Station by 6,000
hp, to a total of 45,400 hp. Columbia
Gulf proposes to perform these activities
under its blanket certificate issued in
Docket No. CP83–496–000, all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection.
The filing may also be viewed on the
web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, please contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or TTY, contact
(202) 502–8659.
Any questions concerning this
application may be directed to Fredric
J. George, Senior Counsel, Columbia Gas
Transmission Corporation, P.O. Box
1273, Charleston, West Virginia 25325–
1273 or by calling (304) 357–2359 or fax
(304)357–3206.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
VerDate Mar<15>2010
19:36 May 21, 2014
Jkt 232001
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to Section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules (18 CFR 157.9),
within 90 days of this Notice, the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
29441
Dated: May 15, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–11863 Filed 5–21–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–483–000]
Tennessee Gas Pipeline Company,
L.L.C.; Notice of Request Under
Blanket Authorization
Take notice that on May 9, 2014,
Tennessee Gas Pipeline Company,
L.L.C. (Tennessee), 1001 Louisiana
Street, Houston, Texas 77002, filed in
Docket No. CP14–483–000, a prior
notice request pursuant to sections
157.205 and 157.211of the
Commission’s regulations under the
Natural Gas Act (NGA) as amended,
requesting authorization to construct
and operate a new delivery point to
serve the Hanscom Air Force Base in
Middlesex County, Massachusetts.
Tennessee proposes to install a threeinch diameter hot tap assembly and
appurtenances located on its Line No.
200–1. Tennessee avers that proposed
facilities will have the capability of
delivering up to 5.76 million cubic feet
per day of natural gas. Tennessee
estimates the costs of the project to be
$561,400, all as more fully set forth in
the application which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions concerning this
application may be directed to Thomas
G. Joyce, Manager, Certificates,
Tennessee Gas Pipeline Company,
L.L.C., 1001 Louisiana Street, Houston,
Texas 77002, by telephone at (713) 420–
3299, or by email tom_joyce@
kindermorgan.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
E:\FR\FM\22MYN1.SGM
22MYN1
Agencies
[Federal Register Volume 79, Number 99 (Thursday, May 22, 2014)]
[Notices]
[Page 29441]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-11863]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP14-478-000]
Columbia Gulf Transmission, LLC; Notice of Request Under Blanket
Authorization
Take notice that on May 7, 2014, Columbia Gulf Transmission, LLC
(Columbia Gulf), having its principal office at 5151 San Felipe, Suite
2500, Houston, TX 77056, filed in Docket No. CP14-478-000, a prior
notice request pursuant to sections 157.205, 157.209 and 157.210 of the
Commission's Regulations under the Natural Gas Act (NGA). Columbia Gulf
seeks authorization to (1) convert a temporary compressor unit located
at the site of the Hartsville Compressor Station, located in Macon
County, Tennessee, to permanent standby service, (2) remove temporary
facilities no longer required for service, and (3) abandon/reduce the
certificated horsepower (hp) of the Hartsville Compressor Station by
6,000 hp, to a total of 45,400 hp. Columbia Gulf proposes to perform
these activities under its blanket certificate issued in Docket No.
CP83-496-000, all as more fully set forth in the application which is
on file with the Commission and open to public inspection.
The filing may also be viewed on the web at https://www.ferc.gov
using the ``eLibrary'' link. Enter the docket number excluding the last
three digits in the docket number field to access the document. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY,
contact (202) 502-8659.
Any questions concerning this application may be directed to
Fredric J. George, Senior Counsel, Columbia Gas Transmission
Corporation, P.O. Box 1273, Charleston, West Virginia 25325-1273 or by
calling (304) 357-2359 or fax (304)357-3206.
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules (18 CFR 157.9),
within 90 days of this Notice, the Commission staff will either:
complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the EA for this proposal. The filing of the EA in the Commission's
public record for this proceeding or the issuance of a Notice of
Schedule for Environmental Review will serve to notify federal and
state agencies of the timing for the completion of all necessary
reviews, and the subsequent need to complete all federal authorizations
within 90 days of the date of issuance of the Commission staff's EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenter's will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenter's will not be required to serve copies of filed
documents on all other parties. However, the non-party commentary, will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 5 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
Dated: May 15, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-11863 Filed 5-21-14; 8:45 am]
BILLING CODE 6717-01-P