Approval and Promulgation of State Implementation Plans; Hawaii; Infrastructure Requirements for the 2008 8-Hour Ozone and the 2010 Nitrogen Dioxide National Ambient Air Quality Standards, 28659-28663 [2014-11432]

Download as PDF Federal Register / Vol. 79, No. 96 / Monday, May 19, 2014 / Proposed Rules ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA–R09–OAR–2014–0317; FRL–9911–02– Region–9] Approval and Promulgation of State Implementation Plans; Hawaii; Infrastructure Requirements for the 2008 8-Hour Ozone and the 2010 Nitrogen Dioxide National Ambient Air Quality Standards Environmental Protection Agency (EPA). ACTION: Proposed rule. AGENCY: The Environmental Protection Agency (EPA) is proposing to approve elements of a State Implementation Plan (SIP) revision submitted by the State of Hawaii on April 04, 2014, pursuant to the requirements of the Clean Air Act (CAA or the Act) for the 2008 8-Hour Ozone and the 2010 Nitrogen Dioxide national ambient air quality standards (NAAQS). The CAA requires that each state adopt and submit a SIP for the implementation, maintenance, and enforcement of each NAAQS promulgated by EPA. We are taking comments on this proposal and plan to follow with a final action. DATES: Written comments must be received on or before June 18, 2014. ADDRESSES: Submit your comments, identified by Docket ID Number EPA– R09–OAR–2014–0317, by one of the following methods: 1. https://www.regulations.gov: Follow the on-line instructions for submitting comments. 2. Email: richmond.dawn@epa.gov. 3. Fax: 415–947–3579. 4. Mail or deliver: Dawn Richmond, Air Planning Office (AIR–2), U.S. Environmental Protection Agency, Region IX, 75 Hawthorne Street, San Francisco, CA 94105–3901. Deliveries are only accepted during the Regional Office’s normal hours of operation. Instructions: All comments will be included in the public docket without change and may be made available online at https://www.regulations.gov, including any personal information provided, unless the comment includes Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Information that you consider CBI or otherwise protected should be clearly identified as such and should not be submitted through https://www.regulations.gov or email. https://www.regulations.gov is an anonymous access system, and EPA will not know your identity or contact information unless you provide it in the mstockstill on DSK4VPTVN1PROD with PROPOSALS SUMMARY: VerDate Mar<15>2010 16:41 May 16, 2014 Jkt 232001 body of your comment. If you send email directly to EPA, your email address will be automatically captured and included as part of the public comment. If EPA cannot read your comment due to technical difficulties and cannot contact you for clarification, EPA may not be able to consider your comment. Docket: The index to the docket for this action is available electronically at https://www.regulations.gov and in hard copy at EPA Region IX, 75 Hawthorne Street, San Francisco, California. While all documents in the docket are listed in the index, some information may be publicly available only at the hard copy location (e.g., copyrighted material), and some may not be publicly available in either location (e.g., CBI). To inspect the hard copy materials, please schedule an appointment during normal business hours with the contact listed directly below. FOR FURTHER INFORMATION CONTACT: Dawn Richmond, Air Planning Office (AIR–2), U.S. Environmental Protection Agency, Region IX, (415) 972–3207, richmond.dawn@epa.gov. SUPPLEMENTARY INFORMATION: Throughout this document, the terms ‘‘we,’’ ‘‘us,’’ and ‘‘our’’ refer to EPA. Table of Contents I. Background A. Statutory Framework B. Regulatory History II. EPA’s Approach to the Review of Infrastructure SIP Submissions III. State Submittal and EPA Action IV. EPA’s Evaluation and Proposed Action V. Statutory and Executive Order Reviews I. Background A. Statutory Framework Section 110(a)(1) of the CAA requires states to make a SIP submission within 3 years after the promulgation of a new or revised primary NAAQS. Section 110(a)(2) includes a list of specific elements that ‘‘[e]ach such plan’’ submission must include. Many of the section 110(a)(2) SIP elements relate to the general information and authorities that constitute the ‘‘infrastructure’’ of a state’s air quality management program and SIP submittals that address these requirements are referred to as ‘‘infrastructure SIPs.’’ These infrastructure SIP elements are as follows: • Section 110(a)(2)(A): Emission limits and other control measures. • Section 110(a)(2)(B): Ambient air quality monitoring/data system. • Section 110(a)(2)(C): Program for enforcement of control measures and regulation of new stationary sources. PO 00000 Frm 00029 Fmt 4702 Sfmt 4702 28659 • Section 110(a)(2)(D)(i): Interstate pollution transport. • Section 110(a)(2)(D)(ii): Interstate and international pollution abatement. • Section 110(a)(2)(E): Adequate resources and authority, conflict of interest, and oversight of local governments and regional agencies. • Section 110(a)(2)(F): Stationary source monitoring and reporting. • Section 110(a)(2)(G): Emergency episodes. • Section 110(a)(2)(H): SIP revisions. • Section 110(a)(2)(J): Consultation with government officials, public notification, and prevention of significant deterioration (PSD) and visibility protection. • Section 110(a)(2)(K): Air quality modeling and submission of modeling data. • Section 110(a)(2)(L): Permitting fees. • Section 110(a)(2)(M): Consultation/ participation by affected local entities. Two elements identified in section 110(a)(2) are not governed by the threeyear submission deadline of section 110(a)(1) and are therefore not addressed in this action. These elements relate to part D of title I of the CAA, and submissions to satisfy them are not due within three years after promulgation of a new or revised NAAQS, but rather are due at the same time nonattainment area plan requirements are due under section 172. The two elements are: (1) Section 110(a)(2)(C) to the extent it refers to permit programs required under part D (nonattainment New Source Review (NSR)), and (2) section 110(a)(2)(I), pertaining to the nonattainment planning requirements of part D. As a result, this action does not address infrastructure elements related to the nonattainment NSR portion of section 110(a)(2)(C) or related to section 110(a)(2)(I). B. Regulatory Background On March 12, 2008, EPA issued a revised NAAQS for ozone.1 On January 22, 2010, EPA issued a revised NAAQS for nitrogen dioxide.2 These revisions to 1 73 FR 16436 (March 27, 2008). EPA revised the previous 8-hour primary ozone standard of 0.08 parts per million (ppm) to 0.075 ppm. EPA also revised the secondary 8-hour standard to the level of 0.075 ppm making it identical to the revised primary standard. In September 2009, EPA announced it would reconsider the 2008 8-hour ozone NAAQS. However, in September 2011, EPA announced its decision to merge the reconsideration of the 2008 NAAQS with the next scheduled 5-year review of the ozone NAAQS, and advised the states that the 2008 NAAQS would be implemented. 2 75 FR 6474 (February 9, 2010). EPA established a 1-hour standard of 100 parts per billion (ppb), based on the 3-year average of the 98th percentile E:\FR\FM\19MYP1.SGM Continued 19MYP1 28660 Federal Register / Vol. 79, No. 96 / Monday, May 19, 2014 / Proposed Rules mstockstill on DSK4VPTVN1PROD with PROPOSALS the ozone and nitrogen dioxide NAAQS, triggered requirements for states to submit infrastructure SIPs to address the applicable requirements of section 110(a)(2) within three years of issuance of each of these revised NAAQS. On January 15, 2013, EPA found that Hawaii had failed to make a submittal for the 2008 ozone NAAQS to satisfy the requirements of section 110(a)(2)(A), (B), (C) to the extent it refers to enforcement, to permitting programs for minor sources and to PSD permitting programs required by part C of title I of the CAA, 110(a)(2)(D)(i)(II), 110(a)(2)(D)(ii), 110(a)(2)(E) through (H) and 110(a)(2)(J) through (M).3 We explained that ‘‘sections 110(a)(2)(C), (D)(i)(II), (D)(ii) and (J) (in all four subsections for the PSD-related and notification-related requirements only) are already addressed for Hawaii through an existing PSD FIP that remains in place. Therefore, this action will not trigger any additional FIP obligations with respect to the PSDrelated and notification-related requirements in these four subsections.’’ 4 We also explained that we were not issuing findings of failure to submit a SIP addressing section 110(a)(2)(D)(i)(I) of the CAA, due to the D.C. Circuit’s recent opinion in EME Homer City Generation v. EPA, 696 F.3d 7, 31 (D.C. Cir. 2012). II. EPA’s Approach to the Review of Infrastructure SIP Submissions EPA is acting upon the SIP submission from Hawaii that addresses the infrastructure requirements of CAA sections 110(a)(1) and 110(a)(2) for the 2008 8-Hour Ozone and the 2010 Nitrogen Dioxide NAAQS. The requirement for states to make a SIP submission of this type arises out of CAA section 110(a)(1). Pursuant to section 110(a)(1), states must make SIP submissions ‘‘within 3 years (or such shorter period as the Administrator may prescribe) after the promulgation of a national primary ambient air quality standard (or any revision thereof),’’ and these SIP submissions are to provide for the ‘‘implementation, maintenance, and enforcement’’ of such NAAQS. The statute directly imposes on states the duty to make these SIP submissions, and the requirement to make the submissions is not conditioned upon EPA’s taking any action other than promulgating a new or revised NAAQS. of the yearly distribution of 1-hour daily maximum concentrations, to supplement the existing annual standard. EPA set the annual NO2 standard to 0.053 ppm. 3 78 FR 2882. 4 Id. at 2889. VerDate Mar<15>2010 16:41 May 16, 2014 Jkt 232001 Section 110(a)(2) includes a list of specific elements that ‘‘[e]ach such plan’’ submission must address. EPA has historically referred to these SIP submissions made for the purpose of satisfying the requirements of CAA sections 110(a)(1) and 110(a)(2) as ‘‘infrastructure SIP’’ submissions. Although the term ‘‘infrastructure SIP’’ does not appear in the CAA, EPA uses the term to distinguish this particular type of SIP submission from submissions that are intended to satisfy other SIP requirements under the CAA, such as ‘‘nonattainment SIP’’ or ‘‘attainment plan SIP’’ submissions to address the nonattainment planning requirements of part D of title I of the CAA, ‘‘regional haze SIP’’ submissions required by EPA rule to address the visibility protection requirements of CAA section 169A, and nonattainment new source review permit program submissions to address the permit requirements of CAA, title I, part D. Section 110(a)(1) addresses the timing and general requirements for infrastructure SIP submissions, and section 110(a)(2) provides more details concerning the required contents of these submissions. The list of required elements provided in section 110(a)(2) contains a wide variety of disparate provisions, some of which pertain to required legal authority, some of which pertain to required substantive program provisions, and some of which pertain to requirements for both authority and substantive program provisions.5 EPA therefore believes that while the timing requirement in section 110(a)(1) is unambiguous, some of the other statutory provisions are ambiguous. In particular, EPA believes that the list of required elements for infrastructure SIP submissions provided in section 110(a)(2) contains ambiguities concerning what is required for inclusion in an infrastructure SIP submission. The following examples of ambiguities illustrate the need for EPA to interpret some section 110(a)(1) and section 110(a)(2) requirements with respect to infrastructure SIP submissions for a given new or revised NAAQS. One example of ambiguity is that section 110(a)(2) requires that ‘‘each’’ SIP submission must meet the list of requirements therein, while EPA 5 For example: Section 110(a)(2)(E)(i) provides that states must provide assurances that they have adequate legal authority under state and local law to carry out the SIP; section 110(a)(2)(C) provides that states must have a SIP-approved program to address certain sources as required by part C of title I of the CAA; and section 110(a)(2)(G) provides that states must have legal authority to address emergencies as well as contingency plans that are triggered in the event of such emergencies. PO 00000 Frm 00030 Fmt 4702 Sfmt 4702 has long noted that this literal reading of the statute is internally inconsistent and would create a conflict with the nonattainment provisions in part D of title I of the Act, which specifically address nonattainment SIP requirements.6 Section 110(a)(2)(I) pertains to nonattainment SIP requirements and part D addresses when attainment plan SIP submissions to address nonattainment area requirements are due. For example, section 172(b) requires EPA to establish a schedule for submission of such plans for certain pollutants when the Administrator promulgates the designation of an area as nonattainment, and section 107(d)(1)(B) allows up to two years, or in some cases three years, for such designations to be promulgated.7 This ambiguity illustrates that rather than apply all the stated requirements of section 110(a)(2) in a strict literal sense, EPA must determine which provisions of section 110(a)(2) are applicable for a particular infrastructure SIP submission. Another example of ambiguity within sections 110(a)(1) and 110(a)(2) with respect to infrastructure SIPs pertains to whether states must meet all of the infrastructure SIP requirements in a single SIP submission, and whether EPA must act upon such SIP submission in a single action. Although section 110(a)(1) directs states to submit ‘‘a plan’’ to meet these requirements, EPA interprets the CAA to allow states to make multiple SIP submissions separately addressing infrastructure SIP elements for the same NAAQS. If states elect to make such multiple SIP submissions to meet the infrastructure SIP requirements, EPA can elect to act on such submissions either individually or in a larger combined action.8 6 See, e.g., ‘‘Rule To Reduce Interstate Transport of Fine Particulate Matter and Ozone (Clean Air Interstate Rule); Revisions to Acid Rain Program; Revisions to the NOX SIP Call; Final Rule,’’ 70 FR 25162, at 25163–65 (May 12, 2005) (explaining relationship between timing requirement of section 110(a)(2)(D) versus section 110(a)(2)(I)). 7 EPA notes that this ambiguity within section 110(a)(2) is heightened by the fact that various subparts of part D set specific dates for submission of certain types of SIP submissions in designated nonattainment areas for various pollutants. Note, e.g., that section 182(a)(1) provides specific dates for submission of emissions inventories for the ozone NAAQS. Some of these specific dates are necessarily later than three years after promulgation of the new or revised NAAQS. 8 See, e.g., ‘‘Approval and Promulgation of Implementation Plans; New Mexico; Revisions to the New Source Review (NSR) State Implementation Plan (SIP); Prevention of Significant Deterioration (PSD) and Nonattainment New Source Review (NNSR) Permitting,’’ 78 FR 4339 (January 22, 2013) (EPA’s final action approving the structural PSD elements of the New Mexico SIP submitted by the State separately to meet the requirements of EPA’s 2008 PM2.5 NSR E:\FR\FM\19MYP1.SGM 19MYP1 Federal Register / Vol. 79, No. 96 / Monday, May 19, 2014 / Proposed Rules mstockstill on DSK4VPTVN1PROD with PROPOSALS Similarly, EPA interprets the CAA to allow EPA to take action on the individual parts of one larger, comprehensive infrastructure SIP submission for a given NAAQS without concurrent action on the entire submission. For example, EPA has sometimes elected to act at different times on various elements and subelements of the same infrastructure SIP submission.9 Ambiguities within sections 110(a)(1) and 110(a)(2) may also arise with respect to infrastructure SIP submission requirements for different NAAQS. Thus, EPA notes that not every element of section 110(a)(2) would be relevant, or as relevant, or relevant in the same way, for each new or revised NAAQS. The states’ attendant infrastructure SIP submissions for each NAAQS therefore could be different. For example, the monitoring requirements that a state might need to meet in its infrastructure SIP submission for purposes of section 110(a)(2)(B) could be very different for different pollutants, for example because the content and scope of a state’s infrastructure SIP submission to meet this element might be very different for an entirely new NAAQS than for a minor revision to an existing NAAQS.10 EPA notes that interpretation of section 110(a)(2) is also necessary when EPA reviews other types of SIP submissions required under the CAA. Therefore, as with infrastructure SIP submissions, EPA also has to identify and interpret the relevant elements of section 110(a)(2) that logically apply to these other types of SIP submissions. For example, section 172(c)(7) requires that attainment plan SIP submissions required by part D have to meet the ‘‘applicable requirements’’ of section 110(a)(2). Thus, for example, attainment plan SIP submissions must meet the requirements of section 110(a)(2)(A) rule), and ‘‘Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Infrastructure and Interstate Transport Requirements for the 2006 PM2.5 NAAQS,’’ (78 FR 4337, January 22, 2013) (EPA’s final action on the infrastructure SIP for the 2006 PM2.5 NAAQS). 9 On December 14, 2007, the State of Tennessee, through the Tennessee Department of Environment and Conservation, made a SIP revision to EPA demonstrating that the State meets the requirements of sections 110(a)(1) and (2). EPA proposed action for infrastructure SIP elements (C) and (J) on January 23, 2012 (77 FR 3213) and took final action on March 14, 2012 (77 FR 14976). On April 16, 2012 (77 FR 22533) and July 23, 2012 (77 FR 42997), EPA took separate proposed and final actions on all other section 110(a)(2) infrastructure SIP elements of Tennessee’s December 14, 2007 submittal. 10 For example, implementation of the 1997 PM 2.5 NAAQS required the deployment of a system of new monitors to measure ambient levels of that new indicator species for the new NAAQS. VerDate Mar<15>2010 16:41 May 16, 2014 Jkt 232001 regarding enforceable emission limits and control measures and section 110(a)(2)(E)(i) regarding air agency resources and authority. By contrast, it is clear that attainment plan SIP submissions required by part D would not need to meet the portion of section 110(a)(2)(C) that pertains to the PSD program required in part C of title I of the CAA, because PSD does not apply to a pollutant for which an area is designated nonattainment and thus subject to part D planning requirements. As this example illustrates, each type of SIP submission may implicate some elements of section 110(a)(2) but not others. Given the potential for ambiguity in some of the statutory language of sections 110(a)(1) and 110(a)(2), EPA believes that it is appropriate to interpret the ambiguous portions of sections 110(a)(1) and 110(a)(2) in the context of acting on a particular SIP submission. In other words, EPA assumes that Congress could not have intended that each and every SIP submission, regardless of the NAAQS in question or the history of SIP development for the relevant pollutant, would meet each of the requirements, or meet each of them in the same way. Therefore, EPA has adopted an approach under which it reviews infrastructure SIP submissions against the list of elements in section 110(a)(2), but only to the extent each element applies for that particular NAAQS. Historically, EPA has elected to use guidance documents to make recommendations to states for infrastructure SIPs, in some cases conveying needed interpretations on newly arising issues and in some cases conveying interpretations that have already been developed and applied to individual SIP submissions for particular elements.11 EPA most recently issued guidance for infrastructure SIPs on September 13, 2013 (2013 Guidance).12 EPA developed this document to provide states with upto-date guidance for infrastructure SIPs for any new or revised NAAQS. Within this guidance, EPA describes the duty of states to make infrastructure SIP 11 EPA notes, however, that nothing in the CAA requires EPA to provide guidance or to promulgate regulations for infrastructure SIP submissions. The CAA directly applies to states and requires the submission of infrastructure SIP submissions, regardless of whether or not EPA provides guidance or regulations pertaining to such submissions. EPA elects to issue such guidance in order to assist states, as appropriate. 12 ‘‘Guidance on Infrastructure State Implementation Plan (SIP) Elements under Clean Air Act Sections 110(a)(1) and 110(a)(2),’’ Memorandum from Stephen D. Page, September 13, 2013. PO 00000 Frm 00031 Fmt 4702 Sfmt 4702 28661 submissions to meet basic structural SIP requirements within three years of promulgation of a new or revised NAAQS. EPA also made recommendations about many specific subsections of section 110(a)(2) that are relevant in the context of infrastructure SIP submissions.13 The guidance also discusses the substantively important issues that are germane to certain subsections of section 110(a)(2). Significantly, EPA interprets sections 110(a)(1) and 110(a)(2) such that infrastructure SIP submissions need to address certain issues and need not address others. Accordingly, EPA reviews each infrastructure SIP submission for compliance with the applicable statutory provisions of section 110(a)(2), as appropriate. As an example, section 110(a)(2)(E)(ii) is a required element of section 110(a)(2) for infrastructure SIP submissions. Under this element, a state must meet the substantive requirements of section 128, which pertain to state boards that approve permits or enforcement orders and heads of executive agencies with similar powers. Thus, EPA reviews infrastructure SIP submissions to ensure that the state’s SIP appropriately addresses the requirements of section 110(a)(2)(E)(ii) and section 128. The 2013 Guidance explains EPA’s interpretation that there may be a variety of ways by which states can appropriately address these substantive statutory requirements, depending on the structure of an individual state’s permitting or enforcement program (e.g., whether permits and enforcement orders are approved by a multi-member board or by a head of an executive agency). However they are addressed by the state, the substantive requirements of section 128 are necessarily included in EPA’s evaluation of infrastructure SIP submissions because section 110(a)(2)(E)(ii) explicitly requires that the state satisfy the provisions of section 128. As another example, EPA’s review of infrastructure SIP submissions with respect to the PSD program requirements in sections 110(a)(2)(C), 13 EPA’s September 13, 2013, guidance did not make recommendations with respect to infrastructure SIP submissions to address section 110(a)(2)(D)(i)(I). EPA issued the guidance shortly after the U.S. Supreme Court agreed to review the D.C. Circuit decision in EME Homer City, 696 F.3d7 (D.C. Cir. 2012) which had interpreted the requirements of section 110(a)(2)(D)(i)(I). In light of the uncertainty created by ongoing litigation, EPA elected not to provide additional guidance on the requirements of section 110(a)(2)(D)(i)(I) at that time. As the guidance is neither binding nor required by statute, whether EPA elects to provide guidance on a particular section has no impact on a state’s CAA obligations. E:\FR\FM\19MYP1.SGM 19MYP1 mstockstill on DSK4VPTVN1PROD with PROPOSALS 28662 Federal Register / Vol. 79, No. 96 / Monday, May 19, 2014 / Proposed Rules 110(a)(2)(D)(i)(II), and 110(a)(2)(J) focuses upon the structural PSD program requirements contained in part C and EPA’s PSD regulations. Structural PSD program requirements include provisions necessary for the PSD program to address all regulated sources and NSR pollutants, including GHGs. By contrast, structural PSD program requirements do not include provisions that are not required under EPA’s regulations at 40 CFR 51.166 but are merely available as an option for the state, such as the option to provide grandfathering of complete permit applications with respect to the 2012 PM2.5 NAAQS. Accordingly, the latter optional provisions are types of provisions EPA considers irrelevant in the context of an infrastructure SIP action. For other section 110(a)(2) elements, however, EPA’s review of a state’s infrastructure SIP submission focuses on assuring that the state’s SIP meets basic structural requirements. For example, section 110(a)(2)(C) includes, inter alia, the requirement that states have a program to regulate minor new sources. Thus, EPA evaluates whether the state has an EPA-approved minor new source review program and whether the program addresses the pollutants relevant to that NAAQS. In the context of acting on an infrastructure SIP submission, however, EPA does not think it is necessary to conduct a review of each and every provision of a state’s existing minor source program (i.e., already in the existing SIP) for compliance with the requirements of the CAA and EPA’s regulations that pertain to such programs. With respect to certain other issues, EPA does not believe that an action on a state’s infrastructure SIP submission is necessarily the appropriate type of action in which to address possible deficiencies in a state’s existing SIP. These issues include: (1) Existing provisions related to excess emissions from sources during periods of startup, shutdown, or malfunction that may be contrary to the CAA and EPA’s policies addressing such excess emissions (‘‘SSM’’); (2) existing provisions related to ‘‘director’s variance’’ or ‘‘director’s discretion’’ that may be contrary to the CAA because they purport to allow revisions to SIP-approved emissions limits while limiting public process or not requiring further approval by EPA; and (3) existing provisions for PSD programs that may be inconsistent with current requirements of EPA’s ‘‘Final NSR Improvement Rule,’’ 67 FR 80186 (December 31, 2002), as amended by 72 FR 32526 (June 13, 2007) (‘‘NSR VerDate Mar<15>2010 16:41 May 16, 2014 Jkt 232001 Reform’’). Thus, EPA believes it may approve an infrastructure SIP submission without scrutinizing the totality of the existing SIP for such potentially deficient provisions and may approve the submission even if it is aware of such existing provisions.14 It is important to note that EPA’s approval of a state’s infrastructure SIP submission should not be construed as explicit or implicit re-approval of any existing potentially deficient provisions that relate to the three specific issues just described. EPA’s approach to review of infrastructure SIP submissions is to identify the CAA requirements that are logically applicable to that submission. EPA believes that this approach to the review of a particular infrastructure SIP submission is appropriate, because it would not be reasonable to read the general requirements of section 110(a)(1) and the list of elements in 110(a)(2) as requiring review of each and every provision of a state’s existing SIP against all requirements in the CAA and EPA regulations merely for purposes of assuring that the state in question has the basic structural elements for a functioning SIP for a new or revised NAAQS. Because SIPs have grown by accretion over the decades as statutory and regulatory requirements under the CAA have evolved, they may include some outmoded provisions and historical artifacts. These provisions, while not fully up to date, nevertheless may not pose a significant problem for the purposes of ‘‘implementation, maintenance, and enforcement’’ of a new or revised NAAQS when EPA evaluates adequacy of the infrastructure SIP submission. EPA believes that a better approach is for states and EPA to focus attention on those elements of section 110(a)(2) of the CAA most likely to warrant a specific SIP revision due to the promulgation of a new or revised NAAQS or other factors. For example, EPA’s 2013 Guidance gives simpler recommendations with respect to carbon monoxide than other NAAQS pollutants to meet the visibility requirements of section 110(a)(2)(D)(i)(II), because carbon monoxide does not affect visibility. As a result, an infrastructure SIP submission for any future new or revised NAAQS for carbon monoxide need only state this fact in order to 14 By contrast, EPA notes that if a state were to include a new provision in an infrastructure SIP submission that contained a legal deficiency, such as a new exemption for excess emissions during SSM events, then EPA would need to evaluate that provision for compliance against the rubric of applicable CAA requirements in the context of the action on the infrastructure SIP. PO 00000 Frm 00032 Fmt 4702 Sfmt 4702 address the visibility prong of section 110(a)(2)(D)(i)(II). Finally, EPA believes that its approach with respect to infrastructure SIP requirements is based on a reasonable reading of sections 110(a)(1) and 110(a)(2) because the CAA provides other avenues and mechanisms to address specific substantive deficiencies in existing SIPs. These other statutory tools allow EPA to take appropriately tailored action, depending upon the nature and severity of the alleged SIP deficiency. Section 110(k)(5) authorizes EPA to issue a ‘‘SIP call’’ whenever the Agency determines that a state’s SIP is substantially inadequate to attain or maintain the NAAQS, to mitigate interstate transport, or to otherwise comply with the CAA.15 Section 110(k)(6) authorizes EPA to correct errors in past actions, such as past approvals of SIP submissions.16 Significantly, EPA’s determination that an action on a state’s infrastructure SIP submission is not the appropriate time and place to address all potential existing SIP deficiencies does not preclude EPA’s subsequent reliance on provisions in section 110(a)(2) as part of the basis for action to correct those deficiencies at a later time. For example, although it may not be appropriate to require a state to eliminate all existing inappropriate director’s discretion provisions in the course of acting on an infrastructure SIP submission, EPA believes that section 110(a)(2)(A) may be among the statutory bases that EPA relies upon in the course of addressing such deficiency in a subsequent action.17 15 For example, EPA issued a SIP call to Utah to address specific existing SIP deficiencies related to the treatment of excess emissions during SSM events. See ‘‘Finding of Substantial Inadequacy of Implementation Plan; Call for Utah State Implementation Plan Revisions,’’ 76 FR 21639 (April 18, 2011). 16 EPA has used this authority to correct errors in past actions on SIP submissions related to PSD programs. See ‘‘Limitation of Approval of Prevention of Significant Deterioration Provisions Concerning Greenhouse Gas Emitting-Sources in State Implementation Plans; Final Rule,’’ 75 FR 82536 (December 30, 2010). EPA has previously used its authority under CAA section 110(k)(6) to remove numerous other SIP provisions that the Agency determined it had approved in error. See, e.g., 61 FR 38664 (July 25, 1996) and 62 FR 34641 (June 27, 1997) (corrections to American Samoa, Arizona, California, Hawaii, and Nevada SIPs); 69 FR 67062 (November 16, 2004) (corrections to California SIP); and 74 FR 57051 (November 3, 2009) (corrections to Arizona and Nevada SIPs). 17 See, e.g., EPA’s disapproval of a SIP submission from Colorado on the grounds that it would have included a director’s discretion provision inconsistent with CAA requirements, including section 110(a)(2)(A). See, e.g., 75 FR 42342 at 42344 (July 21, 2010) (proposed disapproval of director’s discretion provisions); 76 FR 4540 (Jan. 26, 2011) (final disapproval of such provisions). E:\FR\FM\19MYP1.SGM 19MYP1 Federal Register / Vol. 79, No. 96 / Monday, May 19, 2014 / Proposed Rules mstockstill on DSK4VPTVN1PROD with PROPOSALS III. State Submittal and EPA Action On April 4, 2014, the Hawaii Department of Health (HDOH) submitted the ‘‘Hawaii State Implementation Plan Revision for 2008 Ozone and 2010 Nitrogen Dioxide National Ambient Air Quality Standard Clean Air Act section 110(a)(1) & (2)’’ (Hawaii Ozone and Nitrogen Dioxide Infrastructure SIP), which includes (1) a ‘‘Proposed Certification of Adequacy Table’’ (Attachment 1), (2) a ‘‘Proposed List of Revisions to Regulatory and Statutory Provisions in the Hawaii State Implementation Plan’’ (Attachment 2); (3) Summary of Public Participation Proceedings (Attachment 3); (4) Hawaii Revised Statutes Title 19, Health Chapter 342B, Air Pollution Control Sections 4 and 5 (Appendix A); (5) Hawaii Administrative Rules, Chapter 11–60.1, Section 31(Appendix B); and (6) other supporting materials.18 On April 21, 2014, EPA determined that the SIP revision was complete, except for the following sub-elements: 110(a)(2)(C) sub-element 3 (preconstruction PSD permitting of major sources); 110(a)(2)(D); and 110(a)(2)(J) sub-elements 1 (consultation with identified officials on certain air agency actions) and 3 (PSD). IV. EPA’s Evaluation and Proposed Action EPA has evaluated the Hawaii Ozone and Nitrogen Dioxide Infrastructure SIP in relation to the infrastructure SIP requirements of CAA section 110(a)(2) and the applicable implementing regulations in 40 CFR part 51. The Technical Support Document (TSD) for this action, which is available in the docket to this action, includes our evaluation for each element, as well as our evaluation of various statutory and regulatory provisions. In particular, we evaluated Hawaii Administrative Rules (HAR) section 11–60.1–31 Hawaii Revised Statutes (HRS) sections 342B–4 342B–5 for approval into the Hawaii SIP and HRS sections 342–14, 342–18 and 342–19 for removal from the SIP. Based upon this analysis, EPA proposes to approve HAR section 11– 60.1–31 and HRS sections 342B–4 and 342B–5 into the Hawaii SIP and to remove HRS sections 342–14, 342–18 and 342–19 from the SIP. We also propose to approve the Hawaii Ozone and Nitrogen Dioxide Infrastructure SIP with respect to the following CAA requirements: 18 A copy of the complete Hawaii ozone and nitrogen dioxide Infrastructure SIP submittal has been placed in the docket for this action and is available online at https://www.regulations.gov, docket number EPA–R09–OAR–2014–0317. VerDate Mar<15>2010 16:41 May 16, 2014 Jkt 232001 • Section 110(a)(2)(A): Emission limits and other control measures. • Section 110(a)(2)(B): Ambient air quality monitoring/data system. • Section 110(a)(2)(C) (in part): Program for enforcement of control measures and regulation of new stationary sources (minor NSR program). • Section 110(a)(2)(E): Adequate resources and authority, conflict of interest, and oversight of local governments and regional agencies. • Section 110(a)(2)(F): Stationary source monitoring and reporting. • Section 110(a)(2)(G): Emergency episodes. • Section 110(a)(2)(H): SIP revisions. • Section 110(a)(2)(J) (in part): Public notification (sub-element 2). • Section 110(a)(2)(K): Air quality modeling and submission of modeling data. • Section 110(a)(2)(L): Permitting fees. • Section 110(a)(2)(M): Consultation/ participation by affected local entities. As explained above, we previously found the Hawaii Ozone and Nitrogen Dioxide Infrastructure SIP incomplete with respect to various sub-elements. Where EPA determines that a portion of a SIP submission is incomplete, ‘‘the State shall be treated as not having made the submission (or, in the Administrator’s discretion, part thereof.)’’19 Accordingly, we are not proposing to act on the Hawaii Ozone and Nitrogen Dioxide Infrastructure SIP with respect to 110(a)(2)(C) sub-element 3 (preconstruction PSD permitting of major sources); 110(a)(2)(D) all subelements; and 110(a)(2)(J) sub-elements 1 (consultation with identified officials on certain air agency actions) and 3 (PSD). V. Statutory and Executive Order Reviews Under the CAA, the Administrator is required to approve a SIP submission that complies with the provisions of the Act and applicable Federal regulations (42 U.S.C. 7410(k), 40 CFR 52.02(a)). Thus, in reviewing SIP submissions, EPA’s role is to approve state choices, provided that they meet the criteria of the CAA. Accordingly, this proposed action merely approves some state law as meeting federal requirements; this proposed action does not impose additional requirements beyond those imposed by state law. For that reason, this proposed action: • Is not a ‘‘significant regulatory action’’ subject to review by the Office of Management and Budget under 19 CAA PO 00000 Executive Order 12866 (58 FR 51735, October 4, 1993); • Does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.); • Is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.); • Does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104–4); • Does not have Federalism implications as specified in Executive Order 13132 (64 FR 43255, August 10, 1999); is not an economically significant regulatory action based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997); • Is not a significant regulatory action subject to Executive Order 13211 (66 FR 28355, May 22, 2001); • Is not subject to requirements of section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the CAA; and, • Does not provide EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under Executive Order 12898 (59 FR 7629, February 16, 1994). In addition, this rule does not have tribal implications as specified by Executive Order 13175 (65 FR 67249, November 9, 2000), because the SIP is not approved to apply in Indian country located in the State, and EPA notes that it will not impose substantial direct costs on tribal governments or preempt tribal law. List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Incorporation by reference, Intergovernmental relations, Oxides of nitrogen, Ozone, Reporting and recordkeeping requirements, Volatile organic compounds. Dated: April 25, 2014. Jared Blumenfeld, Regional Administrator, EPA Region 9. [FR Doc. 2014–11432 Filed 5–16–14; 8:45 am] BILLING CODE 6560–50–P section 110(k)(1)(C). Frm 00033 Fmt 4702 Sfmt 9990 28663 E:\FR\FM\19MYP1.SGM 19MYP1

Agencies

[Federal Register Volume 79, Number 96 (Monday, May 19, 2014)]
[Proposed Rules]
[Pages 28659-28663]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-11432]



[[Page 28659]]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[EPA-R09-OAR-2014-0317; FRL-9911-02-Region-9]


Approval and Promulgation of State Implementation Plans; Hawaii; 
Infrastructure Requirements for the 2008 8-Hour Ozone and the 2010 
Nitrogen Dioxide National Ambient Air Quality Standards

AGENCY: Environmental Protection Agency (EPA).

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA) is proposing to 
approve elements of a State Implementation Plan (SIP) revision 
submitted by the State of Hawaii on April 04, 2014, pursuant to the 
requirements of the Clean Air Act (CAA or the Act) for the 2008 8-Hour 
Ozone and the 2010 Nitrogen Dioxide national ambient air quality 
standards (NAAQS). The CAA requires that each state adopt and submit a 
SIP for the implementation, maintenance, and enforcement of each NAAQS 
promulgated by EPA. We are taking comments on this proposal and plan to 
follow with a final action.

DATES: Written comments must be received on or before June 18, 2014.

ADDRESSES: Submit your comments, identified by Docket ID Number EPA-
R09-OAR-2014-0317, by one of the following methods:
    1. https://www.regulations.gov: Follow the on-line instructions for 
submitting comments.
    2. Email: richmond.dawn@epa.gov.
    3. Fax: 415-947-3579.
    4. Mail or deliver: Dawn Richmond, Air Planning Office (AIR-2), 
U.S. Environmental Protection Agency, Region IX, 75 Hawthorne Street, 
San Francisco, CA 94105-3901. Deliveries are only accepted during the 
Regional Office's normal hours of operation.
    Instructions: All comments will be included in the public docket 
without change and may be made available online at https://www.regulations.gov, including any personal information provided, 
unless the comment includes Confidential Business Information (CBI) or 
other information whose disclosure is restricted by statute. 
Information that you consider CBI or otherwise protected should be 
clearly identified as such and should not be submitted through https://www.regulations.gov or email. https://www.regulations.gov is an 
anonymous access system, and EPA will not know your identity or contact 
information unless you provide it in the body of your comment. If you 
send email directly to EPA, your email address will be automatically 
captured and included as part of the public comment. If EPA cannot read 
your comment due to technical difficulties and cannot contact you for 
clarification, EPA may not be able to consider your comment.
    Docket: The index to the docket for this action is available 
electronically at https://www.regulations.gov and in hard copy at EPA 
Region IX, 75 Hawthorne Street, San Francisco, California. While all 
documents in the docket are listed in the index, some information may 
be publicly available only at the hard copy location (e.g., copyrighted 
material), and some may not be publicly available in either location 
(e.g., CBI). To inspect the hard copy materials, please schedule an 
appointment during normal business hours with the contact listed 
directly below.

FOR FURTHER INFORMATION CONTACT: Dawn Richmond, Air Planning Office 
(AIR-2), U.S. Environmental Protection Agency, Region IX, (415) 972-
3207, richmond.dawn@epa.gov.

SUPPLEMENTARY INFORMATION: Throughout this document, the terms ``we,'' 
``us,'' and ``our'' refer to EPA.

Table of Contents

I. Background
    A. Statutory Framework
    B. Regulatory History
II. EPA's Approach to the Review of Infrastructure SIP Submissions
III. State Submittal and EPA Action
IV. EPA's Evaluation and Proposed Action
V. Statutory and Executive Order Reviews

I. Background

A. Statutory Framework

    Section 110(a)(1) of the CAA requires states to make a SIP 
submission within 3 years after the promulgation of a new or revised 
primary NAAQS. Section 110(a)(2) includes a list of specific elements 
that ``[e]ach such plan'' submission must include. Many of the section 
110(a)(2) SIP elements relate to the general information and 
authorities that constitute the ``infrastructure'' of a state's air 
quality management program and SIP submittals that address these 
requirements are referred to as ``infrastructure SIPs.'' These 
infrastructure SIP elements are as follows:
     Section 110(a)(2)(A): Emission limits and other control 
measures.
     Section 110(a)(2)(B): Ambient air quality monitoring/data 
system.
     Section 110(a)(2)(C): Program for enforcement of control 
measures and regulation of new stationary sources.
     Section 110(a)(2)(D)(i): Interstate pollution transport.
     Section 110(a)(2)(D)(ii): Interstate and international 
pollution abatement.
     Section 110(a)(2)(E): Adequate resources and authority, 
conflict of interest, and oversight of local governments and regional 
agencies.
     Section 110(a)(2)(F): Stationary source monitoring and 
reporting.
     Section 110(a)(2)(G): Emergency episodes.
     Section 110(a)(2)(H): SIP revisions.
     Section 110(a)(2)(J): Consultation with government 
officials, public notification, and prevention of significant 
deterioration (PSD) and visibility protection.
     Section 110(a)(2)(K): Air quality modeling and submission 
of modeling data.
     Section 110(a)(2)(L): Permitting fees.
     Section 110(a)(2)(M): Consultation/participation by 
affected local entities.
    Two elements identified in section 110(a)(2) are not governed by 
the three-year submission deadline of section 110(a)(1) and are 
therefore not addressed in this action. These elements relate to part D 
of title I of the CAA, and submissions to satisfy them are not due 
within three years after promulgation of a new or revised NAAQS, but 
rather are due at the same time nonattainment area plan requirements 
are due under section 172. The two elements are: (1) Section 
110(a)(2)(C) to the extent it refers to permit programs required under 
part D (nonattainment New Source Review (NSR)), and (2) section 
110(a)(2)(I), pertaining to the nonattainment planning requirements of 
part D. As a result, this action does not address infrastructure 
elements related to the nonattainment NSR portion of section 
110(a)(2)(C) or related to section 110(a)(2)(I).

B. Regulatory Background

    On March 12, 2008, EPA issued a revised NAAQS for ozone.\1\ On 
January 22, 2010, EPA issued a revised NAAQS for nitrogen dioxide.\2\ 
These revisions to

[[Page 28660]]

the ozone and nitrogen dioxide NAAQS, triggered requirements for states 
to submit infrastructure SIPs to address the applicable requirements of 
section 110(a)(2) within three years of issuance of each of these 
revised NAAQS.
---------------------------------------------------------------------------

    \1\ 73 FR 16436 (March 27, 2008). EPA revised the previous 8-
hour primary ozone standard of 0.08 parts per million (ppm) to 0.075 
ppm. EPA also revised the secondary 8-hour standard to the level of 
0.075 ppm making it identical to the revised primary standard. In 
September 2009, EPA announced it would reconsider the 2008 8-hour 
ozone NAAQS. However, in September 2011, EPA announced its decision 
to merge the reconsideration of the 2008 NAAQS with the next 
scheduled 5-year review of the ozone NAAQS, and advised the states 
that the 2008 NAAQS would be implemented.
    \2\ 75 FR 6474 (February 9, 2010). EPA established a 1-hour 
standard of 100 parts per billion (ppb), based on the 3-year average 
of the 98th percentile of the yearly distribution of 1-hour daily 
maximum concentrations, to supplement the existing annual standard. 
EPA set the annual NO2 standard to 0.053 ppm.
---------------------------------------------------------------------------

    On January 15, 2013, EPA found that Hawaii had failed to make a 
submittal for the 2008 ozone NAAQS to satisfy the requirements of 
section 110(a)(2)(A), (B), (C) to the extent it refers to enforcement, 
to permitting programs for minor sources and to PSD permitting programs 
required by part C of title I of the CAA, 110(a)(2)(D)(i)(II), 
110(a)(2)(D)(ii), 110(a)(2)(E) through (H) and 110(a)(2)(J) through 
(M).\3\ We explained that ``sections 110(a)(2)(C), (D)(i)(II), (D)(ii) 
and (J) (in all four subsections for the PSD-related and notification-
related requirements only) are already addressed for Hawaii through an 
existing PSD FIP that remains in place. Therefore, this action will not 
trigger any additional FIP obligations with respect to the PSD-related 
and notification-related requirements in these four subsections.'' \4\
---------------------------------------------------------------------------

    \3\ 78 FR 2882.
    \4\ Id. at 2889.
---------------------------------------------------------------------------

    We also explained that we were not issuing findings of failure to 
submit a SIP addressing section 110(a)(2)(D)(i)(I) of the CAA, due to 
the D.C. Circuit's recent opinion in EME Homer City Generation v. EPA, 
696 F.3d 7, 31 (D.C. Cir. 2012).

II. EPA's Approach to the Review of Infrastructure SIP Submissions

    EPA is acting upon the SIP submission from Hawaii that addresses 
the infrastructure requirements of CAA sections 110(a)(1) and 110(a)(2) 
for the 2008 8-Hour Ozone and the 2010 Nitrogen Dioxide NAAQS. The 
requirement for states to make a SIP submission of this type arises out 
of CAA section 110(a)(1). Pursuant to section 110(a)(1), states must 
make SIP submissions ``within 3 years (or such shorter period as the 
Administrator may prescribe) after the promulgation of a national 
primary ambient air quality standard (or any revision thereof),'' and 
these SIP submissions are to provide for the ``implementation, 
maintenance, and enforcement'' of such NAAQS. The statute directly 
imposes on states the duty to make these SIP submissions, and the 
requirement to make the submissions is not conditioned upon EPA's 
taking any action other than promulgating a new or revised NAAQS. 
Section 110(a)(2) includes a list of specific elements that ``[e]ach 
such plan'' submission must address.
    EPA has historically referred to these SIP submissions made for the 
purpose of satisfying the requirements of CAA sections 110(a)(1) and 
110(a)(2) as ``infrastructure SIP'' submissions. Although the term 
``infrastructure SIP'' does not appear in the CAA, EPA uses the term to 
distinguish this particular type of SIP submission from submissions 
that are intended to satisfy other SIP requirements under the CAA, such 
as ``nonattainment SIP'' or ``attainment plan SIP'' submissions to 
address the nonattainment planning requirements of part D of title I of 
the CAA, ``regional haze SIP'' submissions required by EPA rule to 
address the visibility protection requirements of CAA section 169A, and 
nonattainment new source review permit program submissions to address 
the permit requirements of CAA, title I, part D.
    Section 110(a)(1) addresses the timing and general requirements for 
infrastructure SIP submissions, and section 110(a)(2) provides more 
details concerning the required contents of these submissions. The list 
of required elements provided in section 110(a)(2) contains a wide 
variety of disparate provisions, some of which pertain to required 
legal authority, some of which pertain to required substantive program 
provisions, and some of which pertain to requirements for both 
authority and substantive program provisions.\5\ EPA therefore believes 
that while the timing requirement in section 110(a)(1) is unambiguous, 
some of the other statutory provisions are ambiguous. In particular, 
EPA believes that the list of required elements for infrastructure SIP 
submissions provided in section 110(a)(2) contains ambiguities 
concerning what is required for inclusion in an infrastructure SIP 
submission.
---------------------------------------------------------------------------

    \5\ For example: Section 110(a)(2)(E)(i) provides that states 
must provide assurances that they have adequate legal authority 
under state and local law to carry out the SIP; section 110(a)(2)(C) 
provides that states must have a SIP-approved program to address 
certain sources as required by part C of title I of the CAA; and 
section 110(a)(2)(G) provides that states must have legal authority 
to address emergencies as well as contingency plans that are 
triggered in the event of such emergencies.
---------------------------------------------------------------------------

    The following examples of ambiguities illustrate the need for EPA 
to interpret some section 110(a)(1) and section 110(a)(2) requirements 
with respect to infrastructure SIP submissions for a given new or 
revised NAAQS. One example of ambiguity is that section 110(a)(2) 
requires that ``each'' SIP submission must meet the list of 
requirements therein, while EPA has long noted that this literal 
reading of the statute is internally inconsistent and would create a 
conflict with the nonattainment provisions in part D of title I of the 
Act, which specifically address nonattainment SIP requirements.\6\ 
Section 110(a)(2)(I) pertains to nonattainment SIP requirements and 
part D addresses when attainment plan SIP submissions to address 
nonattainment area requirements are due. For example, section 172(b) 
requires EPA to establish a schedule for submission of such plans for 
certain pollutants when the Administrator promulgates the designation 
of an area as nonattainment, and section 107(d)(1)(B) allows up to two 
years, or in some cases three years, for such designations to be 
promulgated.\7\ This ambiguity illustrates that rather than apply all 
the stated requirements of section 110(a)(2) in a strict literal sense, 
EPA must determine which provisions of section 110(a)(2) are applicable 
for a particular infrastructure SIP submission.
---------------------------------------------------------------------------

    \6\ See, e.g., ``Rule To Reduce Interstate Transport of Fine 
Particulate Matter and Ozone (Clean Air Interstate Rule); Revisions 
to Acid Rain Program; Revisions to the NOX SIP Call; 
Final Rule,'' 70 FR 25162, at 25163-65 (May 12, 2005) (explaining 
relationship between timing requirement of section 110(a)(2)(D) 
versus section 110(a)(2)(I)).
    \7\ EPA notes that this ambiguity within section 110(a)(2) is 
heightened by the fact that various subparts of part D set specific 
dates for submission of certain types of SIP submissions in 
designated nonattainment areas for various pollutants. Note, e.g., 
that section 182(a)(1) provides specific dates for submission of 
emissions inventories for the ozone NAAQS. Some of these specific 
dates are necessarily later than three years after promulgation of 
the new or revised NAAQS.
---------------------------------------------------------------------------

    Another example of ambiguity within sections 110(a)(1) and 
110(a)(2) with respect to infrastructure SIPs pertains to whether 
states must meet all of the infrastructure SIP requirements in a single 
SIP submission, and whether EPA must act upon such SIP submission in a 
single action. Although section 110(a)(1) directs states to submit ``a 
plan'' to meet these requirements, EPA interprets the CAA to allow 
states to make multiple SIP submissions separately addressing 
infrastructure SIP elements for the same NAAQS. If states elect to make 
such multiple SIP submissions to meet the infrastructure SIP 
requirements, EPA can elect to act on such submissions either 
individually or in a larger combined action.\8\

[[Page 28661]]

Similarly, EPA interprets the CAA to allow EPA to take action on the 
individual parts of one larger, comprehensive infrastructure SIP 
submission for a given NAAQS without concurrent action on the entire 
submission. For example, EPA has sometimes elected to act at different 
times on various elements and sub-elements of the same infrastructure 
SIP submission.\9\
---------------------------------------------------------------------------

    \8\ See, e.g., ``Approval and Promulgation of Implementation 
Plans; New Mexico; Revisions to the New Source Review (NSR) State 
Implementation Plan (SIP); Prevention of Significant Deterioration 
(PSD) and Nonattainment New Source Review (NNSR) Permitting,'' 78 FR 
4339 (January 22, 2013) (EPA's final action approving the structural 
PSD elements of the New Mexico SIP submitted by the State separately 
to meet the requirements of EPA's 2008 PM2.5 NSR rule), 
and ``Approval and Promulgation of Air Quality Implementation Plans; 
New Mexico; Infrastructure and Interstate Transport Requirements for 
the 2006 PM2.5 NAAQS,'' (78 FR 4337, January 22, 2013) 
(EPA's final action on the infrastructure SIP for the 2006 
PM2.5 NAAQS).
    \9\ On December 14, 2007, the State of Tennessee, through the 
Tennessee Department of Environment and Conservation, made a SIP 
revision to EPA demonstrating that the State meets the requirements 
of sections 110(a)(1) and (2). EPA proposed action for 
infrastructure SIP elements (C) and (J) on January 23, 2012 (77 FR 
3213) and took final action on March 14, 2012 (77 FR 14976). On 
April 16, 2012 (77 FR 22533) and July 23, 2012 (77 FR 42997), EPA 
took separate proposed and final actions on all other section 
110(a)(2) infrastructure SIP elements of Tennessee's December 14, 
2007 submittal.
---------------------------------------------------------------------------

    Ambiguities within sections 110(a)(1) and 110(a)(2) may also arise 
with respect to infrastructure SIP submission requirements for 
different NAAQS. Thus, EPA notes that not every element of section 
110(a)(2) would be relevant, or as relevant, or relevant in the same 
way, for each new or revised NAAQS. The states' attendant 
infrastructure SIP submissions for each NAAQS therefore could be 
different. For example, the monitoring requirements that a state might 
need to meet in its infrastructure SIP submission for purposes of 
section 110(a)(2)(B) could be very different for different pollutants, 
for example because the content and scope of a state's infrastructure 
SIP submission to meet this element might be very different for an 
entirely new NAAQS than for a minor revision to an existing NAAQS.\10\
---------------------------------------------------------------------------

    \10\ For example, implementation of the 1997 PM2.5 
NAAQS required the deployment of a system of new monitors to measure 
ambient levels of that new indicator species for the new NAAQS.
---------------------------------------------------------------------------

    EPA notes that interpretation of section 110(a)(2) is also 
necessary when EPA reviews other types of SIP submissions required 
under the CAA. Therefore, as with infrastructure SIP submissions, EPA 
also has to identify and interpret the relevant elements of section 
110(a)(2) that logically apply to these other types of SIP submissions. 
For example, section 172(c)(7) requires that attainment plan SIP 
submissions required by part D have to meet the ``applicable 
requirements'' of section 110(a)(2). Thus, for example, attainment plan 
SIP submissions must meet the requirements of section 110(a)(2)(A) 
regarding enforceable emission limits and control measures and section 
110(a)(2)(E)(i) regarding air agency resources and authority. By 
contrast, it is clear that attainment plan SIP submissions required by 
part D would not need to meet the portion of section 110(a)(2)(C) that 
pertains to the PSD program required in part C of title I of the CAA, 
because PSD does not apply to a pollutant for which an area is 
designated nonattainment and thus subject to part D planning 
requirements. As this example illustrates, each type of SIP submission 
may implicate some elements of section 110(a)(2) but not others.
    Given the potential for ambiguity in some of the statutory language 
of sections 110(a)(1) and 110(a)(2), EPA believes that it is 
appropriate to interpret the ambiguous portions of sections 110(a)(1) 
and 110(a)(2) in the context of acting on a particular SIP submission. 
In other words, EPA assumes that Congress could not have intended that 
each and every SIP submission, regardless of the NAAQS in question or 
the history of SIP development for the relevant pollutant, would meet 
each of the requirements, or meet each of them in the same way. 
Therefore, EPA has adopted an approach under which it reviews 
infrastructure SIP submissions against the list of elements in section 
110(a)(2), but only to the extent each element applies for that 
particular NAAQS.
    Historically, EPA has elected to use guidance documents to make 
recommendations to states for infrastructure SIPs, in some cases 
conveying needed interpretations on newly arising issues and in some 
cases conveying interpretations that have already been developed and 
applied to individual SIP submissions for particular elements.\11\ EPA 
most recently issued guidance for infrastructure SIPs on September 13, 
2013 (2013 Guidance).\12\ EPA developed this document to provide states 
with up-to-date guidance for infrastructure SIPs for any new or revised 
NAAQS. Within this guidance, EPA describes the duty of states to make 
infrastructure SIP submissions to meet basic structural SIP 
requirements within three years of promulgation of a new or revised 
NAAQS. EPA also made recommendations about many specific subsections of 
section 110(a)(2) that are relevant in the context of infrastructure 
SIP submissions.\13\ The guidance also discusses the substantively 
important issues that are germane to certain subsections of section 
110(a)(2). Significantly, EPA interprets sections 110(a)(1) and 
110(a)(2) such that infrastructure SIP submissions need to address 
certain issues and need not address others. Accordingly, EPA reviews 
each infrastructure SIP submission for compliance with the applicable 
statutory provisions of section 110(a)(2), as appropriate.
---------------------------------------------------------------------------

    \11\ EPA notes, however, that nothing in the CAA requires EPA to 
provide guidance or to promulgate regulations for infrastructure SIP 
submissions. The CAA directly applies to states and requires the 
submission of infrastructure SIP submissions, regardless of whether 
or not EPA provides guidance or regulations pertaining to such 
submissions. EPA elects to issue such guidance in order to assist 
states, as appropriate.
    \12\ ``Guidance on Infrastructure State Implementation Plan 
(SIP) Elements under Clean Air Act Sections 110(a)(1) and 
110(a)(2),'' Memorandum from Stephen D. Page, September 13, 2013.
    \13\ EPA's September 13, 2013, guidance did not make 
recommendations with respect to infrastructure SIP submissions to 
address section 110(a)(2)(D)(i)(I). EPA issued the guidance shortly 
after the U.S. Supreme Court agreed to review the D.C. Circuit 
decision in EME Homer City, 696 F.3d7 (D.C. Cir. 2012) which had 
interpreted the requirements of section 110(a)(2)(D)(i)(I). In light 
of the uncertainty created by ongoing litigation, EPA elected not to 
provide additional guidance on the requirements of section 
110(a)(2)(D)(i)(I) at that time. As the guidance is neither binding 
nor required by statute, whether EPA elects to provide guidance on a 
particular section has no impact on a state's CAA obligations.
---------------------------------------------------------------------------

    As an example, section 110(a)(2)(E)(ii) is a required element of 
section 110(a)(2) for infrastructure SIP submissions. Under this 
element, a state must meet the substantive requirements of section 128, 
which pertain to state boards that approve permits or enforcement 
orders and heads of executive agencies with similar powers. Thus, EPA 
reviews infrastructure SIP submissions to ensure that the state's SIP 
appropriately addresses the requirements of section 110(a)(2)(E)(ii) 
and section 128. The 2013 Guidance explains EPA's interpretation that 
there may be a variety of ways by which states can appropriately 
address these substantive statutory requirements, depending on the 
structure of an individual state's permitting or enforcement program 
(e.g., whether permits and enforcement orders are approved by a multi-
member board or by a head of an executive agency). However they are 
addressed by the state, the substantive requirements of section 128 are 
necessarily included in EPA's evaluation of infrastructure SIP 
submissions because section 110(a)(2)(E)(ii) explicitly requires that 
the state satisfy the provisions of section 128.
    As another example, EPA's review of infrastructure SIP submissions 
with respect to the PSD program requirements in sections 110(a)(2)(C),

[[Page 28662]]

110(a)(2)(D)(i)(II), and 110(a)(2)(J) focuses upon the structural PSD 
program requirements contained in part C and EPA's PSD regulations. 
Structural PSD program requirements include provisions necessary for 
the PSD program to address all regulated sources and NSR pollutants, 
including GHGs. By contrast, structural PSD program requirements do not 
include provisions that are not required under EPA's regulations at 40 
CFR 51.166 but are merely available as an option for the state, such as 
the option to provide grandfathering of complete permit applications 
with respect to the 2012 PM2.5 NAAQS. Accordingly, the 
latter optional provisions are types of provisions EPA considers 
irrelevant in the context of an infrastructure SIP action.
    For other section 110(a)(2) elements, however, EPA's review of a 
state's infrastructure SIP submission focuses on assuring that the 
state's SIP meets basic structural requirements. For example, section 
110(a)(2)(C) includes, inter alia, the requirement that states have a 
program to regulate minor new sources. Thus, EPA evaluates whether the 
state has an EPA-approved minor new source review program and whether 
the program addresses the pollutants relevant to that NAAQS. In the 
context of acting on an infrastructure SIP submission, however, EPA 
does not think it is necessary to conduct a review of each and every 
provision of a state's existing minor source program (i.e., already in 
the existing SIP) for compliance with the requirements of the CAA and 
EPA's regulations that pertain to such programs.
    With respect to certain other issues, EPA does not believe that an 
action on a state's infrastructure SIP submission is necessarily the 
appropriate type of action in which to address possible deficiencies in 
a state's existing SIP. These issues include: (1) Existing provisions 
related to excess emissions from sources during periods of startup, 
shutdown, or malfunction that may be contrary to the CAA and EPA's 
policies addressing such excess emissions (``SSM''); (2) existing 
provisions related to ``director's variance'' or ``director's 
discretion'' that may be contrary to the CAA because they purport to 
allow revisions to SIP-approved emissions limits while limiting public 
process or not requiring further approval by EPA; and (3) existing 
provisions for PSD programs that may be inconsistent with current 
requirements of EPA's ``Final NSR Improvement Rule,'' 67 FR 80186 
(December 31, 2002), as amended by 72 FR 32526 (June 13, 2007) (``NSR 
Reform''). Thus, EPA believes it may approve an infrastructure SIP 
submission without scrutinizing the totality of the existing SIP for 
such potentially deficient provisions and may approve the submission 
even if it is aware of such existing provisions.\14\ It is important to 
note that EPA's approval of a state's infrastructure SIP submission 
should not be construed as explicit or implicit re-approval of any 
existing potentially deficient provisions that relate to the three 
specific issues just described.
---------------------------------------------------------------------------

    \14\ By contrast, EPA notes that if a state were to include a 
new provision in an infrastructure SIP submission that contained a 
legal deficiency, such as a new exemption for excess emissions 
during SSM events, then EPA would need to evaluate that provision 
for compliance against the rubric of applicable CAA requirements in 
the context of the action on the infrastructure SIP.
---------------------------------------------------------------------------

    EPA's approach to review of infrastructure SIP submissions is to 
identify the CAA requirements that are logically applicable to that 
submission. EPA believes that this approach to the review of a 
particular infrastructure SIP submission is appropriate, because it 
would not be reasonable to read the general requirements of section 
110(a)(1) and the list of elements in 110(a)(2) as requiring review of 
each and every provision of a state's existing SIP against all 
requirements in the CAA and EPA regulations merely for purposes of 
assuring that the state in question has the basic structural elements 
for a functioning SIP for a new or revised NAAQS. Because SIPs have 
grown by accretion over the decades as statutory and regulatory 
requirements under the CAA have evolved, they may include some outmoded 
provisions and historical artifacts. These provisions, while not fully 
up to date, nevertheless may not pose a significant problem for the 
purposes of ``implementation, maintenance, and enforcement'' of a new 
or revised NAAQS when EPA evaluates adequacy of the infrastructure SIP 
submission. EPA believes that a better approach is for states and EPA 
to focus attention on those elements of section 110(a)(2) of the CAA 
most likely to warrant a specific SIP revision due to the promulgation 
of a new or revised NAAQS or other factors.
    For example, EPA's 2013 Guidance gives simpler recommendations with 
respect to carbon monoxide than other NAAQS pollutants to meet the 
visibility requirements of section 110(a)(2)(D)(i)(II), because carbon 
monoxide does not affect visibility. As a result, an infrastructure SIP 
submission for any future new or revised NAAQS for carbon monoxide need 
only state this fact in order to address the visibility prong of 
section 110(a)(2)(D)(i)(II).
    Finally, EPA believes that its approach with respect to 
infrastructure SIP requirements is based on a reasonable reading of 
sections 110(a)(1) and 110(a)(2) because the CAA provides other avenues 
and mechanisms to address specific substantive deficiencies in existing 
SIPs. These other statutory tools allow EPA to take appropriately 
tailored action, depending upon the nature and severity of the alleged 
SIP deficiency. Section 110(k)(5) authorizes EPA to issue a ``SIP 
call'' whenever the Agency determines that a state's SIP is 
substantially inadequate to attain or maintain the NAAQS, to mitigate 
interstate transport, or to otherwise comply with the CAA.\15\ Section 
110(k)(6) authorizes EPA to correct errors in past actions, such as 
past approvals of SIP submissions.\16\ Significantly, EPA's 
determination that an action on a state's infrastructure SIP submission 
is not the appropriate time and place to address all potential existing 
SIP deficiencies does not preclude EPA's subsequent reliance on 
provisions in section 110(a)(2) as part of the basis for action to 
correct those deficiencies at a later time. For example, although it 
may not be appropriate to require a state to eliminate all existing 
inappropriate director's discretion provisions in the course of acting 
on an infrastructure SIP submission, EPA believes that section 
110(a)(2)(A) may be among the statutory bases that EPA relies upon in 
the course of addressing such deficiency in a subsequent action.\17\
---------------------------------------------------------------------------

    \15\ For example, EPA issued a SIP call to Utah to address 
specific existing SIP deficiencies related to the treatment of 
excess emissions during SSM events. See ``Finding of Substantial 
Inadequacy of Implementation Plan; Call for Utah State 
Implementation Plan Revisions,'' 76 FR 21639 (April 18, 2011).
    \16\ EPA has used this authority to correct errors in past 
actions on SIP submissions related to PSD programs. See ``Limitation 
of Approval of Prevention of Significant Deterioration Provisions 
Concerning Greenhouse Gas Emitting-Sources in State Implementation 
Plans; Final Rule,'' 75 FR 82536 (December 30, 2010). EPA has 
previously used its authority under CAA section 110(k)(6) to remove 
numerous other SIP provisions that the Agency determined it had 
approved in error. See, e.g., 61 FR 38664 (July 25, 1996) and 62 FR 
34641 (June 27, 1997) (corrections to American Samoa, Arizona, 
California, Hawaii, and Nevada SIPs); 69 FR 67062 (November 16, 
2004) (corrections to California SIP); and 74 FR 57051 (November 3, 
2009) (corrections to Arizona and Nevada SIPs).
    \17\ See, e.g., EPA's disapproval of a SIP submission from 
Colorado on the grounds that it would have included a director's 
discretion provision inconsistent with CAA requirements, including 
section 110(a)(2)(A). See, e.g., 75 FR 42342 at 42344 (July 21, 
2010) (proposed disapproval of director's discretion provisions); 76 
FR 4540 (Jan. 26, 2011) (final disapproval of such provisions).

---------------------------------------------------------------------------

[[Page 28663]]

III. State Submittal and EPA Action

    On April 4, 2014, the Hawaii Department of Health (HDOH) submitted 
the ``Hawaii State Implementation Plan Revision for 2008 Ozone and 2010 
Nitrogen Dioxide National Ambient Air Quality Standard Clean Air Act 
section 110(a)(1) & (2)'' (Hawaii Ozone and Nitrogen Dioxide 
Infrastructure SIP), which includes (1) a ``Proposed Certification of 
Adequacy Table'' (Attachment 1), (2) a ``Proposed List of Revisions to 
Regulatory and Statutory Provisions in the Hawaii State Implementation 
Plan'' (Attachment 2); (3) Summary of Public Participation Proceedings 
(Attachment 3); (4) Hawaii Revised Statutes Title 19, Health Chapter 
342B, Air Pollution Control Sections 4 and 5 (Appendix A); (5) Hawaii 
Administrative Rules, Chapter 11-60.1, Section 31(Appendix B); and (6) 
other supporting materials.\18\
---------------------------------------------------------------------------

    \18\ A copy of the complete Hawaii ozone and nitrogen dioxide 
Infrastructure SIP submittal has been placed in the docket for this 
action and is available online at https://www.regulations.gov, docket 
number EPA-R09-OAR-2014-0317.
---------------------------------------------------------------------------

    On April 21, 2014, EPA determined that the SIP revision was 
complete, except for the following sub-elements: 110(a)(2)(C) sub-
element 3 (preconstruction PSD permitting of major sources); 
110(a)(2)(D); and 110(a)(2)(J) sub-elements 1 (consultation with 
identified officials on certain air agency actions) and 3 (PSD).

IV. EPA's Evaluation and Proposed Action

    EPA has evaluated the Hawaii Ozone and Nitrogen Dioxide 
Infrastructure SIP in relation to the infrastructure SIP requirements 
of CAA section 110(a)(2) and the applicable implementing regulations in 
40 CFR part 51. The Technical Support Document (TSD) for this action, 
which is available in the docket to this action, includes our 
evaluation for each element, as well as our evaluation of various 
statutory and regulatory provisions. In particular, we evaluated Hawaii 
Administrative Rules (HAR) section 11-60.1-31 Hawaii Revised Statutes 
(HRS) sections 342B-4 342B-5 for approval into the Hawaii SIP and HRS 
sections 342-14, 342-18 and 342-19 for removal from the SIP.
    Based upon this analysis, EPA proposes to approve HAR section 11-
60.1-31 and HRS sections 342B-4 and 342B-5 into the Hawaii SIP and to 
remove HRS sections 342-14, 342-18 and 342-19 from the SIP. We also 
propose to approve the Hawaii Ozone and Nitrogen Dioxide Infrastructure 
SIP with respect to the following CAA requirements:
     Section 110(a)(2)(A): Emission limits and other control 
measures.
     Section 110(a)(2)(B): Ambient air quality monitoring/data 
system.
     Section 110(a)(2)(C) (in part): Program for enforcement of 
control measures and regulation of new stationary sources (minor NSR 
program).
     Section 110(a)(2)(E): Adequate resources and authority, 
conflict of interest, and oversight of local governments and regional 
agencies.
     Section 110(a)(2)(F): Stationary source monitoring and 
reporting.
     Section 110(a)(2)(G): Emergency episodes.
     Section 110(a)(2)(H): SIP revisions.
     Section 110(a)(2)(J) (in part): Public notification (sub-
element 2).
     Section 110(a)(2)(K): Air quality modeling and submission 
of modeling data.
     Section 110(a)(2)(L): Permitting fees.
     Section 110(a)(2)(M): Consultation/participation by 
affected local entities.
    As explained above, we previously found the Hawaii Ozone and 
Nitrogen Dioxide Infrastructure SIP incomplete with respect to various 
sub-elements. Where EPA determines that a portion of a SIP submission 
is incomplete, ``the State shall be treated as not having made the 
submission (or, in the Administrator's discretion, part thereof.)''\19\ 
Accordingly, we are not proposing to act on the Hawaii Ozone and 
Nitrogen Dioxide Infrastructure SIP with respect to 110(a)(2)(C) sub-
element 3 (preconstruction PSD permitting of major sources); 
110(a)(2)(D) all sub-elements; and 110(a)(2)(J) sub-elements 1 
(consultation with identified officials on certain air agency actions) 
and 3 (PSD).
---------------------------------------------------------------------------

    \19\ CAA section 110(k)(1)(C).
---------------------------------------------------------------------------

V. Statutory and Executive Order Reviews

    Under the CAA, the Administrator is required to approve a SIP 
submission that complies with the provisions of the Act and applicable 
Federal regulations (42 U.S.C. 7410(k), 40 CFR 52.02(a)). Thus, in 
reviewing SIP submissions, EPA's role is to approve state choices, 
provided that they meet the criteria of the CAA. Accordingly, this 
proposed action merely approves some state law as meeting federal 
requirements; this proposed action does not impose additional 
requirements beyond those imposed by state law. For that reason, this 
proposed action:
     Is not a ``significant regulatory action'' subject to 
review by the Office of Management and Budget under Executive Order 
12866 (58 FR 51735, October 4, 1993);
     Does not impose an information collection burden under the 
provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
     Is certified as not having a significant economic impact 
on a substantial number of small entities under the Regulatory 
Flexibility Act (5 U.S.C. 601 et seq.);
     Does not contain any unfunded mandate or significantly or 
uniquely affect small governments, as described in the Unfunded 
Mandates Reform Act of 1995 (Pub. L. 104-4);
     Does not have Federalism implications as specified in 
Executive Order 13132 (64 FR 43255, August 10, 1999); is not an 
economically significant regulatory action based on health or safety 
risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997);
     Is not a significant regulatory action subject to 
Executive Order 13211 (66 FR 28355, May 22, 2001);
     Is not subject to requirements of section 12(d) of the 
National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 
note) because application of those requirements would be inconsistent 
with the CAA; and,
     Does not provide EPA with the discretionary authority to 
address, as appropriate, disproportionate human health or environmental 
effects, using practicable and legally permissible methods, under 
Executive Order 12898 (59 FR 7629, February 16, 1994).
    In addition, this rule does not have tribal implications as 
specified by Executive Order 13175 (65 FR 67249, November 9, 2000), 
because the SIP is not approved to apply in Indian country located in 
the State, and EPA notes that it will not impose substantial direct 
costs on tribal governments or preempt tribal law.

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Incorporation by 
reference, Intergovernmental relations, Oxides of nitrogen, Ozone, 
Reporting and recordkeeping requirements, Volatile organic compounds.

    Dated: April 25, 2014.
Jared Blumenfeld,
Regional Administrator, EPA Region 9.
[FR Doc. 2014-11432 Filed 5-16-14; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.