Pepperell Hydro Company, LLC; Notice of Settlement Agreement and Soliciting Comments, 28506-28507 [2014-11268]
Download as PDF
28506
Federal Register / Vol. 79, No. 95 / Friday, May 16, 2014 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2299–082]
EMCDONALD on DSK67QTVN1PROD with NOTICES
Turlock Irrigation District, Modesto
Irrigation District; Notice of Application
Tendered for Filing With the
Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2299–082.
c. Date Filed: April 28, 2014.
d. Applicant: Turlock Irrigation
District and Modesto Irrigation District.
e. Name of Project: Don Pedro
Hydroelectric Project.
f. Location: The Don Pedro Project
facilities are located on the Tuolumne
River in Tuolumne County, California.
Portions of the Don Pedro Project
occupy lands of the Bureau of Land
Management Sierra Resource
Management Unit.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Steven Boyd,
Director of Water Resources, Turlock
Irrigation District, P.O. Box 949,
Turlock, California 95381, 209–883–
8364 and Greg Dias, Project Manager,
Modesto Irrigation District, P.O. Box
4060, Modesto, California 95352, 209–
526–7566.
i. FERC Contact: Jim Hastreiter at
(503) 552–2760 or james.hastreiter@
ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. The Project Description: The Don
Pedro Project consists of the following
existing facilities: (1) The 580-foot-high,
1,900-foot-long earth and rockfill dam
with a gross storage capacity of
2,030,000 acre-feet, located on the
Tuolumne River 54.8 miles upstream of
its confluence with the San Joaquin
River; (2) the 30-foot-high, 45-footwide, 135-foot-long gated spillway
including three radial gates each 45foot-wide by 30-foot-high; (2) the 995foot-long ungated ogee spillway with a
crest elevation of 830 feet; (3) the set of
outlet works located at the left abutment
of the dam consisting of three
individual gate housings, each
containing two 4-foot-by-5-foot slide
gates; (4) the 3,500-foot-long concrete
lined tunnel with a total hydraulic
capacity of 7,500 cubic feet per second;
VerDate Mar<15>2010
20:00 May 15, 2014
Jkt 232001
(5) the 2,960-foot-long power tunnel
located in the left abutment of the dam
that transitions from an 18-foot
concrete-lined section to a 16-foot steellined section; (6) the 21-foot-high, 12foot-wide emergency closure fixedwheel gate; (7) a powerhouse located
immediately downstream of the dam
containing a 72-inch hollow jet valve
and four Francis turbine-generator units
with a nameplate capacity of 168
megawatts; (8) the switchyard located
on top of the powerhouse; (9) the 75foot-high earth and rockfill Gasburg
Creek dike with a slide-gate controlled
18-inch-diameter conduit located near
the downstream end of the spillway;
(10) three small embankments dikes
(dike A is located between the main
dam and spillway and dikes B and C are
located east of the main dam); (11)
recreation facilities on Don Pedro
reservoir, including Fleming Meadows,
Blue Oaks, and Moccasin Point,
primitive and semi-primitive lakeshore
camping, both floating and shoreline
restrooms in addition to those at the
developed recreation areas, and other
open water-based features including
houseboat marinas and a marked waterski slalom course; and (12) appurtenant
facilities and features including access
roads.
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule:
The application will be processed
according to the following preliminary
Hydro Licensing Schedule. Revisions to
the schedule may be made as
appropriate.
Milestone
Target date
Notice of Acceptance/Notice
of Ready for Environmental Analysis.
PO 00000
Frm 00034
Fmt 4703
May 2016.
Sfmt 4703
Milestone
Filing of recommendations,
preliminary terms and
conditions, and fishway
prescriptions.
Commission issues Draft
Environmental Impact
Statement (EIS).
Comments on Draft EIS ......
Modified Terms and Conditions.
Commission Issues Final
EIS.
Target date
July 2016.
January 2017.
February 2017.
April 2017.
July 2017.
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the Notice of Ready
for Environmental Analysis.
Dated: May 9, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–11265 Filed 5–15–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12721–006]
Pepperell Hydro Company, LLC; Notice
of Settlement Agreement and Soliciting
Comments
Take notice that the following
settlement agreement has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Settlement
Agreement.
b. Project No.: 12721–006.
c. Date filed: April 11, 2014.
d. Applicant: Pepperell Hydro
Company, LLC.
e. Name of Project: Pepperell
Hydroelectric Project.
f. Location: On the Nashua River, in
the town of Pepperell, Middlesex
County, Massachusetts. The project
would not occupy lands of the United
States.
g. Filed Pursuant to: Rule 602 of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.602.
h. Applicant Contact: Dr. Peter B.
Clark, 823 Bay Road, P.O. Box 149,
Hamilton, MA 01936; (978) 468–3999;
or pclark@swiftrivercompany.com.
i. FERC Contact: Brandon Cherry at
(202) 502–8328 or brandon.cherry@
ferc.gov.
j. Deadline for filing comments: June
2, 2014; reply comments are due on
June 12, 2014. This notice establishes a
deadline for filing comments on the
settlement agreement that corresponds
with the deadline established by the
E:\FR\FM\16MYN1.SGM
16MYN1
EMCDONALD on DSK67QTVN1PROD with NOTICES
Federal Register / Vol. 79, No. 95 / Friday, May 16, 2014 / Notices
Commission notice issued on April 1,
2014.
The Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–12721–006.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Pepperell Hydro Company, LLC
filed the settlement agreement on behalf
of itself, the U.S. Fish and Wildlife
Service, National Park Service,
Massachusetts Division of Fisheries and
Wildlife, Massachusetts Department of
Environmental Protection, Nashua River
Watershed Association, and town of
Pepperell, Massachusetts. The purpose
of the settlement agreement is to resolve
among the signatories all issues
associated with issuance of an original
license for the project regarding mode of
operation, bypassed reach flows,
impoundment refill, upstream and
downstream American eel passage,
upstream and downstream fish passage,
mussels, water quality, invasive species,
and recreation. The signatories request
that the Commission incorporate into
any original license for the project the
measures included in section 3 of the
settlement agreement.
l. A copy of the settlement agreement
is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
VerDate Mar<15>2010
20:00 May 15, 2014
Jkt 232001
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: May 9, 2014.
Kimberly D. Bose,
Secretary.
[Docket No. NJ14–14–000]
Federal Energy Regulatory
Commission
Oncor Electric Delivery Company LLC;
Notice of Filing
[Docket No. NJ14–11–000]
Oncor Electric Delivery Company LLC;
Notice of Filing
Take notice that on March 25, 2014,
Oncor Electric Delivery Company LLC
submitted its tariff filing per 35.28(e):
Oncor Tex-La Tariff Rate Changes,
effective October 27, 2011.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
Fmt 4703
Dated: May 9, 2014.
Kimberly D. Bose,
Secretary.
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
Frm 00035
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on May 23, 2014.
[FR Doc. 2014–11262 Filed 5–15–14; 8:45 am]
[FR Doc. 2014–11268 Filed 5–15–14; 8:45 am]
PO 00000
28507
Take notice that on March 28, 2014,
Oncor Electric Delivery Company LLC
submitted its tariff filing per 35.28(e):
Oncor TFO Tariff Rate Changes,
effective January 1, 2012.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on May 23, 2014.
E:\FR\FM\16MYN1.SGM
16MYN1
Agencies
[Federal Register Volume 79, Number 95 (Friday, May 16, 2014)]
[Notices]
[Pages 28506-28507]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-11268]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12721-006]
Pepperell Hydro Company, LLC; Notice of Settlement Agreement and
Soliciting Comments
Take notice that the following settlement agreement has been filed
with the Commission and is available for public inspection.
a. Type of Application: Settlement Agreement.
b. Project No.: 12721-006.
c. Date filed: April 11, 2014.
d. Applicant: Pepperell Hydro Company, LLC.
e. Name of Project: Pepperell Hydroelectric Project.
f. Location: On the Nashua River, in the town of Pepperell,
Middlesex County, Massachusetts. The project would not occupy lands of
the United States.
g. Filed Pursuant to: Rule 602 of the Commission's Rules of
Practice and Procedure, 18 CFR 385.602.
h. Applicant Contact: Dr. Peter B. Clark, 823 Bay Road, P.O. Box
149, Hamilton, MA 01936; (978) 468-3999; or
pclark@swiftrivercompany.com.
i. FERC Contact: Brandon Cherry at (202) 502-8328 or
brandon.cherry@ferc.gov.
j. Deadline for filing comments: June 2, 2014; reply comments are
due on June 12, 2014. This notice establishes a deadline for filing
comments on the settlement agreement that corresponds with the deadline
established by the
[[Page 28507]]
Commission notice issued on April 1, 2014.
The Commission strongly encourages electronic filing. Please file
comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to
6,000 characters, without prior registration, using the eComment system
at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-12721-006.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. Pepperell Hydro Company, LLC filed the settlement agreement on
behalf of itself, the U.S. Fish and Wildlife Service, National Park
Service, Massachusetts Division of Fisheries and Wildlife,
Massachusetts Department of Environmental Protection, Nashua River
Watershed Association, and town of Pepperell, Massachusetts. The
purpose of the settlement agreement is to resolve among the signatories
all issues associated with issuance of an original license for the
project regarding mode of operation, bypassed reach flows, impoundment
refill, upstream and downstream American eel passage, upstream and
downstream fish passage, mussels, water quality, invasive species, and
recreation. The signatories request that the Commission incorporate
into any original license for the project the measures included in
section 3 of the settlement agreement.
l. A copy of the settlement agreement is available for review at
the Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: May 9, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-11268 Filed 5-15-14; 8:45 am]
BILLING CODE 6717-01-P