Turlock Irrigation District, Modesto Irrigation District; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 28506 [2014-11265]
Download as PDF
28506
Federal Register / Vol. 79, No. 95 / Friday, May 16, 2014 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2299–082]
EMCDONALD on DSK67QTVN1PROD with NOTICES
Turlock Irrigation District, Modesto
Irrigation District; Notice of Application
Tendered for Filing With the
Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2299–082.
c. Date Filed: April 28, 2014.
d. Applicant: Turlock Irrigation
District and Modesto Irrigation District.
e. Name of Project: Don Pedro
Hydroelectric Project.
f. Location: The Don Pedro Project
facilities are located on the Tuolumne
River in Tuolumne County, California.
Portions of the Don Pedro Project
occupy lands of the Bureau of Land
Management Sierra Resource
Management Unit.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Steven Boyd,
Director of Water Resources, Turlock
Irrigation District, P.O. Box 949,
Turlock, California 95381, 209–883–
8364 and Greg Dias, Project Manager,
Modesto Irrigation District, P.O. Box
4060, Modesto, California 95352, 209–
526–7566.
i. FERC Contact: Jim Hastreiter at
(503) 552–2760 or james.hastreiter@
ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. The Project Description: The Don
Pedro Project consists of the following
existing facilities: (1) The 580-foot-high,
1,900-foot-long earth and rockfill dam
with a gross storage capacity of
2,030,000 acre-feet, located on the
Tuolumne River 54.8 miles upstream of
its confluence with the San Joaquin
River; (2) the 30-foot-high, 45-footwide, 135-foot-long gated spillway
including three radial gates each 45foot-wide by 30-foot-high; (2) the 995foot-long ungated ogee spillway with a
crest elevation of 830 feet; (3) the set of
outlet works located at the left abutment
of the dam consisting of three
individual gate housings, each
containing two 4-foot-by-5-foot slide
gates; (4) the 3,500-foot-long concrete
lined tunnel with a total hydraulic
capacity of 7,500 cubic feet per second;
VerDate Mar<15>2010
20:00 May 15, 2014
Jkt 232001
(5) the 2,960-foot-long power tunnel
located in the left abutment of the dam
that transitions from an 18-foot
concrete-lined section to a 16-foot steellined section; (6) the 21-foot-high, 12foot-wide emergency closure fixedwheel gate; (7) a powerhouse located
immediately downstream of the dam
containing a 72-inch hollow jet valve
and four Francis turbine-generator units
with a nameplate capacity of 168
megawatts; (8) the switchyard located
on top of the powerhouse; (9) the 75foot-high earth and rockfill Gasburg
Creek dike with a slide-gate controlled
18-inch-diameter conduit located near
the downstream end of the spillway;
(10) three small embankments dikes
(dike A is located between the main
dam and spillway and dikes B and C are
located east of the main dam); (11)
recreation facilities on Don Pedro
reservoir, including Fleming Meadows,
Blue Oaks, and Moccasin Point,
primitive and semi-primitive lakeshore
camping, both floating and shoreline
restrooms in addition to those at the
developed recreation areas, and other
open water-based features including
houseboat marinas and a marked waterski slalom course; and (12) appurtenant
facilities and features including access
roads.
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule:
The application will be processed
according to the following preliminary
Hydro Licensing Schedule. Revisions to
the schedule may be made as
appropriate.
Milestone
Target date
Notice of Acceptance/Notice
of Ready for Environmental Analysis.
PO 00000
Frm 00034
Fmt 4703
May 2016.
Sfmt 4703
Milestone
Filing of recommendations,
preliminary terms and
conditions, and fishway
prescriptions.
Commission issues Draft
Environmental Impact
Statement (EIS).
Comments on Draft EIS ......
Modified Terms and Conditions.
Commission Issues Final
EIS.
Target date
July 2016.
January 2017.
February 2017.
April 2017.
July 2017.
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the Notice of Ready
for Environmental Analysis.
Dated: May 9, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–11265 Filed 5–15–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12721–006]
Pepperell Hydro Company, LLC; Notice
of Settlement Agreement and Soliciting
Comments
Take notice that the following
settlement agreement has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Settlement
Agreement.
b. Project No.: 12721–006.
c. Date filed: April 11, 2014.
d. Applicant: Pepperell Hydro
Company, LLC.
e. Name of Project: Pepperell
Hydroelectric Project.
f. Location: On the Nashua River, in
the town of Pepperell, Middlesex
County, Massachusetts. The project
would not occupy lands of the United
States.
g. Filed Pursuant to: Rule 602 of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.602.
h. Applicant Contact: Dr. Peter B.
Clark, 823 Bay Road, P.O. Box 149,
Hamilton, MA 01936; (978) 468–3999;
or pclark@swiftrivercompany.com.
i. FERC Contact: Brandon Cherry at
(202) 502–8328 or brandon.cherry@
ferc.gov.
j. Deadline for filing comments: June
2, 2014; reply comments are due on
June 12, 2014. This notice establishes a
deadline for filing comments on the
settlement agreement that corresponds
with the deadline established by the
E:\FR\FM\16MYN1.SGM
16MYN1
Agencies
[Federal Register Volume 79, Number 95 (Friday, May 16, 2014)]
[Notices]
[Page 28506]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-11265]
[[Page 28506]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2299-082]
Turlock Irrigation District, Modesto Irrigation District; Notice
of Application Tendered for Filing With the Commission and Establishing
Procedural Schedule for Licensing and Deadline for Submission of Final
Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2299-082.
c. Date Filed: April 28, 2014.
d. Applicant: Turlock Irrigation District and Modesto Irrigation
District.
e. Name of Project: Don Pedro Hydroelectric Project.
f. Location: The Don Pedro Project facilities are located on the
Tuolumne River in Tuolumne County, California. Portions of the Don
Pedro Project occupy lands of the Bureau of Land Management Sierra
Resource Management Unit.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Steven Boyd, Director of Water Resources,
Turlock Irrigation District, P.O. Box 949, Turlock, California 95381,
209-883-8364 and Greg Dias, Project Manager, Modesto Irrigation
District, P.O. Box 4060, Modesto, California 95352, 209-526-7566.
i. FERC Contact: Jim Hastreiter at (503) 552-2760 or
james.hastreiter@ferc.gov.
j. This application is not ready for environmental analysis at this
time.
k. The Project Description: The Don Pedro Project consists of the
following existing facilities: (1) The 580-foot-high, 1,900-foot-long
earth and rockfill dam with a gross storage capacity of 2,030,000 acre-
feet, located on the Tuolumne River 54.8 miles upstream of its
confluence with the San Joaquin River; (2) the 30-foot-high, 45-foot-
wide, 135-foot-long gated spillway including three radial gates each
45-foot-wide by 30-foot-high; (2) the 995-foot-long ungated ogee
spillway with a crest elevation of 830 feet; (3) the set of outlet
works located at the left abutment of the dam consisting of three
individual gate housings, each containing two 4-foot-by-5-foot slide
gates; (4) the 3,500-foot-long concrete lined tunnel with a total
hydraulic capacity of 7,500 cubic feet per second; (5) the 2,960-foot-
long power tunnel located in the left abutment of the dam that
transitions from an 18-foot concrete-lined section to a 16-foot steel-
lined section; (6) the 21-foot-high, 12-foot-wide emergency closure
fixed-wheel gate; (7) a powerhouse located immediately downstream of
the dam containing a 72-inch hollow jet valve and four Francis turbine-
generator units with a nameplate capacity of 168 megawatts; (8) the
switchyard located on top of the powerhouse; (9) the 75-foot-high earth
and rockfill Gasburg Creek dike with a slide-gate controlled 18-inch-
diameter conduit located near the downstream end of the spillway; (10)
three small embankments dikes (dike A is located between the main dam
and spillway and dikes B and C are located east of the main dam); (11)
recreation facilities on Don Pedro reservoir, including Fleming
Meadows, Blue Oaks, and Moccasin Point, primitive and semi-primitive
lakeshore camping, both floating and shoreline restrooms in addition to
those at the developed recreation areas, and other open water-based
features including houseboat marinas and a marked water-ski slalom
course; and (12) appurtenant facilities and features including access
roads.
l. Locations of the Application: A copy of the application is
available for review at the Commission in the Public Reference Room or
may be viewed on the Commission's Web site at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in item (h) above.
m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Procedural Schedule:
The application will be processed according to the following
preliminary Hydro Licensing Schedule. Revisions to the schedule may be
made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready for May 2016.
Environmental Analysis.
Filing of recommendations, preliminary July 2016.
terms and conditions, and fishway
prescriptions.
Commission issues Draft Environmental January 2017.
Impact Statement (EIS).
Comments on Draft EIS................... February 2017.
Modified Terms and Conditions........... April 2017.
Commission Issues Final EIS............. July 2017.
------------------------------------------------------------------------
o. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the Notice
of Ready for Environmental Analysis.
Dated: May 9, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-11265 Filed 5-15-14; 8:45 am]
BILLING CODE 6717-01-P