Sunshine Act Meeting Notice, 27295-27297 [2014-11011]

Download as PDF Federal Register / Vol. 79, No. 92 / Tuesday, May 13, 2014 / Notices 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 5, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–10879 Filed 5–12–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission mstockstill on DSK4VPTVN1PROD with NOTICES Combined Notice of Filings #2 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER13–821–005. Applicants: Scrubgrass Generating Company, L.P. Description: Notice of Non-Material Change in Status of Scrubgrass Generating Company, L.P. Filed Date: 5/5/14. Accession Number: 20140505–5200. Comments Due: 5 p.m. ET 5/27/14. Docket Numbers: ER13–2301–002. Applicants: Dominion Energy Marketing, Inc. Description: Compliance Filing— Supplement to Amdmt of April 21 to be effective 10/1/2013. Filed Date: 5/5/14. Accession Number: 20140505–5148. Comments Due: 5 p.m. ET 5/15/14. Docket Numbers: ER14–1876–000. Applicants: Arizona Public Service Company. Description: Service Agreement No. 331—Letter Agreement with IID—Yucca Power Plant to be effective 9/1/2010. Filed Date: 5/5/14. Accession Number: 20140505–5137. Comments Due: 5 p.m. ET 5/27/14. Docket Numbers: ER14–1877–000. Applicants: Entergy Arkansas, Inc. Description: Entergy Arkansas, Inc. submits Notices of Cancellation of power coordination and interchange agreements. Filed Date: 5/5/14. Accession Number: 20140505–5197. Comments Due: 5 p.m. ET 5/27/14. Docket Numbers: ER14–1878–000. Applicants: Allegheny Energy Supply Company, LLC. VerDate Mar<15>2010 19:27 May 12, 2014 Jkt 232001 Description: Allegheny Energy Supply Co., LLC Reactive Power Rate Schedule FERC No. 2 to be effective 12/31/9998. Filed Date: 5/5/14. Accession Number: 20140505–5220 Comments Due: 5 p.m. ET 5/27/14. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 5, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–10882 Filed 5–12–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER14–1858–000] Consolidated Power Co., LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Consolidated Power Co., LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 27295 to the applicant’s request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability, is May 27, 2014. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 6, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–10883 Filed 5–12–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sunshine Act Meeting Notice The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. 94–409), 5 U.S.C. 552b: AGENCY HOLDING MEETING: Federal Energy Regulatory Commission. DATE AND TIME: May 15, 2014 10:00 a.m. PLACE: Room 2C, 888 First Street, NE., Washington, DC 20426. STATUS: OPEN. MATTERS TO BE CONSIDERED: Agenda. * NOTE—Items listed on the agenda may be deleted without further notice. E:\FR\FM\13MYN1.SGM 13MYN1 27296 Federal Register / Vol. 79, No. 92 / Tuesday, May 13, 2014 / Notices CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, Telephone (202) 502–8400. For a recorded message listing items struck from or added to the meeting, call (202) 502–8627. This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission’s Web site at https://www.ferc.gov using the eLibrary link, or may be examined in the Commission’s Public Reference Room. 1005TH—MEETING [Regular meeting, May 15, 2014, 10:00 a.m.] Item No. Docket No. Company Administrative A–1 ........ A–2 ........ A–3 ........ AD02–1–000 ................................................ AD02–7–000 ................................................ AD05–9–000 ................................................ Agency Business Matters. Customer Matters, Reliability, Security and Market Operations. Energy Market and Reliability Assessment. Electric E–1 ........ E–2 ........ ER13–107–003 ............................................ ER13–107–005. ER13–187–002 ............................................ ER13–187–003 ER13–187–004. ER13–186–001. ER13–89–001 .............................................. ER13–89–002. ER13–101–002 ............................................ E–3 ........ E–4 ........ E–5 ........ E–6 ........ E–7 ........ E–8 ........ ER13–101–003. ER13–84–001 .............................................. ER13–95–001 .............................................. ER13–198–001 ............................................ ER13–198–002. ER13–195–001 ............................................ ER13–90–001 .............................................. ER13–90–002. ER13–85–001 .............................................. ER13–85–002. ER13–1909–000. ER11–2127–003 .......................................... ER11–2127–004. EL11–37–001. EL10–29–003 .............................................. EL10–36–003 .............................................. RM14–11–000 ............................................. TX11–1–001 ................................................ EL14–9–000 ................................................ QF11–424–002. EL14–18–000 .............................................. South Carolina Electric & Gas Company. Midwest Independent Transmission System Operator, Inc. and the MISO Transmission Owners. MidAmerican Energy Company and Midwest Independent Transmission System Operator, Inc. American Transmission Company LLC and Midwest Independent Transmission System Operator, Inc. Cleco Power LLC. Entergy Arkansas, Inc. PJM Interconnection, L.L.C. Indicated PJM Transmission Owners. PJM Interconnection, L.L.C. and Public Service Electric and Gas Company. Maine Public Service Company. Terra-Gen Dixie Valley, LLC. Terra-Gen Dixie Valley, LLC, TGP Dixie Development Company, LLC and New York Canyon, LLC. Green Borders Geothermal, LLC v. Terra-Gen Dixie Valley, LLC. Open Access and Priority Rights on Interconnection Customer’s Interconnection Facilities. Southern Cross Transmission LLC and Pattern Power Marketing LLC. Gregory and Beverly Swecker v. Midland Power Cooperative. Gregory and Beverly Swecker v. Midland Power Cooperative and Central Iowa Power Cooperative. Miscellaneous M–1 ........ M–2 ........ mstockstill on DSK4VPTVN1PROD with NOTICES G–1 ........ G–2 ........ G–3 ........ RM01–5–001 ............................................... IN13–15–000 ............................................... BP Corporation North America Inc.. BP America Production Company.. BP Energy Company.. OR14–21–000 ............................................. RP14–393–000 ............................................ RP12–514–002 ............................................ RP11–1566–014. RP11–2066–003. Electronic Tariff Filings. BP America Inc. North Dakota Pipeline Company LLC. Columbia Gas Transmission, LLC. Tennessee Gas Pipeline Company, L.L.C. Hydro H–1 ........ H–2 ........ H–3 ........ P–6618–007 ................................................ OMITTED. P–1290–013 ................................................ VerDate Mar<15>2010 19:27 May 12, 2014 Jkt 232001 PO 00000 Christopher M. Anthony. Appalachian Power Company. Frm 00020 Fmt 4703 Sfmt 4703 E:\FR\FM\13MYN1.SGM 13MYN1 Federal Register / Vol. 79, No. 92 / Tuesday, May 13, 2014 / Notices 27297 1005TH—MEETING—Continued [Regular meeting, May 15, 2014, 10:00 a.m.] Item No. Docket No. Company Certificates C–1 ........ CP13–83–000 .............................................. Issued: May 8, 2014. Kimberly D. Bose, Secretary. A free webcast of this event is available through www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The event will contain a link to its webcast. The Capitol Connection provides technical support for the free webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703–993–3100. Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service. [FR Doc. 2014–11011 Filed 5–9–14; 11:15 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14586–000] mstockstill on DSK4VPTVN1PROD with NOTICES James R. Robertson, PE; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 10, 2014, James R. Robertson, PE, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of hydropower at the U.S. Army Corps of Engineers’ (Corps) Sutton Dam, on the Elk River, in Sutton, Braxton County, West Virginia. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit VerDate Mar<15>2010 19:27 May 12, 2014 Jkt 232001 Arlington Storage Company, LLC. term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed Sutton Hydroelectric Power Project would consist of the following: (1) A new 80-foot-long by 40foot-wide powerhouse containing three generating units with a total installed capacity of 9.2 megawatts; (2) a new multiple-port intake structure to be located at the upstream face of the Sutton dam; (3) a new 12-foot-diameter, 300-foot-long steel penstock; (4) a new 70-foot-long by 30-foot-wide switchyard; (5) a new 138-kilovolt, 4,000-foot-long transmission line; and (6) appurtenant facilities. The estimated annual generation of the proposed project would be 36 gigawatt-hours. Applicant Contact: James R. Robertson, PE, 5702 Reno Court, Boonsboro, MD 21713; phone: (240) 405–5667. FERC Contact: Monir Chowdhury; phone: (202) 502–6736. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc. gov/docs-filing/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–14586–000. PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14586) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: May 6, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–10881 Filed 5–12–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14587–000] Vortex Hydro Energy; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 21, 2014, Vortex Hydro Energy filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the St. Clair River Hydrokinetic (St. Clair River Project or project) to be located on St. Clair River, in the city of Port Huron, St. Clair County, Michigan. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) Three new 20-footlong by 32-foot-wide by 27-foot-high oscylators, each containing four horizontal cylinders with a combined nameplate capacity of 33 kilowatts (kW), for a project total of 100 kW of installed capacity; (2) twelve 10-kW generator units; (3) a traditional direct current to alternating current inverter for power connection to the grid; (4) three 500-foot-long, 1-kilovolt (kV) to 3- E:\FR\FM\13MYN1.SGM 13MYN1

Agencies

[Federal Register Volume 79, Number 92 (Tuesday, May 13, 2014)]
[Notices]
[Pages 27295-27297]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-11011]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Sunshine Act Meeting Notice

    The following notice of meeting is published pursuant to section 
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 
552b:

AGENCY HOLDING MEETING: Federal Energy Regulatory Commission.

DATE AND TIME: May 15, 2014 10:00 a.m.

PLACE: Room 2C, 888 First Street, NE., Washington, DC 20426.

STATUS: OPEN.

MATTERS TO BE CONSIDERED: Agenda.
    * NOTE--Items listed on the agenda may be deleted without further 
notice.

[[Page 27296]]


CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, 
Telephone (202) 502-8400.
    For a recorded message listing items struck from or added to the 
meeting, call (202) 502-8627.
    This is a list of matters to be considered by the Commission. It 
does not include a listing of all documents relevant to the items on 
the agenda. All public documents, however, may be viewed on line at the 
Commission's Web site at https://www.ferc.gov using the eLibrary link, 
or may be examined in the Commission's Public Reference Room.

                                                 1005TH--Meeting
                                   [Regular meeting, May 15, 2014, 10:00 a.m.]
----------------------------------------------------------------------------------------------------------------
        Item No.                     Docket No.                                    Company
----------------------------------------------------------------------------------------------------------------
                                                 Administrative
----------------------------------------------------------------------------------------------------------------
A-1.....................  AD02-1-000......................  Agency Business Matters.
A-2.....................  AD02-7-000......................  Customer Matters, Reliability, Security and Market
                                                             Operations.
A-3.....................  AD05-9-000......................  Energy Market and Reliability Assessment.
----------------------------------------------------------------------------------------------------------------
                                                    Electric
----------------------------------------------------------------------------------------------------------------
E-1.....................  ER13-107-003....................  South Carolina Electric & Gas Company.
                          ER13-107-005....................
E-2.....................  ER13-187-002....................  Midwest Independent Transmission System Operator,
                                                             Inc. and the MISO Transmission Owners.
                          ER13-187-003 ER13-187-004.......
                          ER13-186-001....................
                          ER13-89-001.....................  MidAmerican Energy Company and Midwest Independent
                                                             Transmission System Operator, Inc.
                          ER13-89-002.....................
                          ER13-101-002....................  American Transmission Company LLC and Midwest
                                                             Independent Transmission System Operator, Inc.
                          ER13-101-003....................
                          ER13-84-001.....................  Cleco Power LLC.
                          ER13-95-001.....................  Entergy Arkansas, Inc.
E-3.....................  ER13-198-001....................  PJM Interconnection, L.L.C.
                          ER13-198-002....................
                          ER13-195-001....................  Indicated PJM Transmission Owners.
                          ER13-90-001.....................  PJM Interconnection, L.L.C. and Public Service
                                                             Electric and Gas Company.
                          ER13-90-002.....................
E-4.....................  ER13-85-001.....................  Maine Public Service Company.
                          ER13-85-002.....................
                          ER13-1909-000...................
E-5.....................  ER11-2127-003...................  Terra-Gen Dixie Valley, LLC.
                          ER11-2127-004...................
                          EL11-37-001.....................
                          EL10-29-003.....................  Terra-Gen Dixie Valley, LLC, TGP Dixie Development
                                                             Company, LLC and New York Canyon, LLC.
                          EL10-36-003.....................  Green Borders Geothermal, LLC v. Terra-Gen Dixie
                                                             Valley, LLC.
E-6.....................  RM14-11-000.....................  Open Access and Priority Rights on Interconnection
                                                             Customer's Interconnection Facilities.
E-7.....................  TX11-1-001......................  Southern Cross Transmission LLC and Pattern Power
                                                             Marketing LLC.
E-8.....................  EL14-9-000......................  Gregory and Beverly Swecker v. Midland Power
                                                             Cooperative.
                          QF11-424-002....................
                          EL14-18-000.....................  Gregory and Beverly Swecker v. Midland Power
                                                             Cooperative and Central Iowa Power Cooperative.
----------------------------------------------------------------------------------------------------------------
                                                  Miscellaneous
----------------------------------------------------------------------------------------------------------------
M-1.....................  RM01-5-001......................  Electronic Tariff Filings.
M-2.....................  IN13-15-000.....................  BP America Inc.
                          BP Corporation North America
                           Inc..
                          BP America Production Company...
                          BP Energy Company...............
G-1.....................  OR14-21-000.....................  North Dakota Pipeline Company LLC.
G-2.....................  RP14-393-000....................  Columbia Gas Transmission, LLC.
G-3.....................  RP12-514-002....................  Tennessee Gas Pipeline Company, L.L.C.
                          RP11-1566-014...................
                          RP11-2066-003...................
----------------------------------------------------------------------------------------------------------------
                                                      Hydro
----------------------------------------------------------------------------------------------------------------
H-1.....................  P-6618-007......................  Christopher M. Anthony.
H-2.....................  OMITTED.........................
H-3.....................  P-1290-013......................  Appalachian Power Company.
----------------------------------------------------------------------------------------------------------------

[[Page 27297]]

 
                                                  Certificates
----------------------------------------------------------------------------------------------------------------
C-1.....................  CP13-83-000.....................  Arlington Storage Company, LLC.
----------------------------------------------------------------------------------------------------------------


    Issued: May 8, 2014.
Kimberly D. Bose,
 Secretary.
    A free webcast of this event is available through www.ferc.gov. 
Anyone with Internet access who desires to view this event can do so by 
navigating to www.ferc.gov's Calendar of Events and locating this event 
in the Calendar. The event will contain a link to its webcast. The 
Capitol Connection provides technical support for the free webcasts. It 
also offers access to this event via television in the DC area and via 
phone bridge for a fee. If you have any questions, visit 
www.CapitolConnection.org or contact Danelle Springer or David 
Reininger at 703-993-3100.
    Immediately following the conclusion of the Commission Meeting, a 
press briefing will be held in the Commission Meeting Room. Members of 
the public may view this briefing in the designated overflow room. This 
statement is intended to notify the public that the press briefings 
that follow Commission meetings may now be viewed remotely at 
Commission headquarters, but will not be telecast through the Capitol 
Connection service.

[FR Doc. 2014-11011 Filed 5-9-14; 11:15 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.