Sunshine Act Meeting Notice, 27295-27297 [2014-11011]
Download as PDF
Federal Register / Vol. 79, No. 92 / Tuesday, May 13, 2014 / Notices
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 5, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–10879 Filed 5–12–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSK4VPTVN1PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–821–005.
Applicants: Scrubgrass Generating
Company, L.P.
Description: Notice of Non-Material
Change in Status of Scrubgrass
Generating Company, L.P.
Filed Date: 5/5/14.
Accession Number: 20140505–5200.
Comments Due: 5 p.m. ET 5/27/14.
Docket Numbers: ER13–2301–002.
Applicants: Dominion Energy
Marketing, Inc.
Description: Compliance Filing—
Supplement to Amdmt of April 21 to be
effective 10/1/2013.
Filed Date: 5/5/14.
Accession Number: 20140505–5148.
Comments Due: 5 p.m. ET 5/15/14.
Docket Numbers: ER14–1876–000.
Applicants: Arizona Public Service
Company.
Description: Service Agreement No.
331—Letter Agreement with IID—Yucca
Power Plant to be effective 9/1/2010.
Filed Date: 5/5/14.
Accession Number: 20140505–5137.
Comments Due: 5 p.m. ET 5/27/14.
Docket Numbers: ER14–1877–000.
Applicants: Entergy Arkansas, Inc.
Description: Entergy Arkansas, Inc.
submits Notices of Cancellation of
power coordination and interchange
agreements.
Filed Date: 5/5/14.
Accession Number: 20140505–5197.
Comments Due: 5 p.m. ET 5/27/14.
Docket Numbers: ER14–1878–000.
Applicants: Allegheny Energy Supply
Company, LLC.
VerDate Mar<15>2010
19:27 May 12, 2014
Jkt 232001
Description: Allegheny Energy Supply
Co., LLC Reactive Power Rate Schedule
FERC No. 2 to be effective 12/31/9998.
Filed Date: 5/5/14.
Accession Number: 20140505–5220
Comments Due: 5 p.m. ET 5/27/14.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 5, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–10882 Filed 5–12–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER14–1858–000]
Consolidated Power Co., LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of
Consolidated Power Co., LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR Part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
27295
to the applicant’s request for blanket
authorization, under 18 CFR Part 34, of
future issuances of securities and
assumptions of liability, is May 27,
2014.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: May 6, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–10883 Filed 5–12–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Sunshine Act Meeting Notice
The following notice of meeting is
published pursuant to section 3(a) of the
government in the Sunshine Act (Pub.
L. 94–409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING: Federal
Energy Regulatory Commission.
DATE AND TIME: May 15, 2014 10:00 a.m.
PLACE: Room 2C, 888 First Street, NE.,
Washington, DC 20426.
STATUS: OPEN.
MATTERS TO BE CONSIDERED: Agenda.
* NOTE—Items listed on the agenda
may be deleted without further notice.
E:\FR\FM\13MYN1.SGM
13MYN1
27296
Federal Register / Vol. 79, No. 92 / Tuesday, May 13, 2014 / Notices
CONTACT PERSON FOR MORE INFORMATION:
Kimberly D. Bose, Secretary, Telephone
(202) 502–8400.
For a recorded message listing items
struck from or added to the meeting, call
(202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all documents
relevant to the items on the agenda. All
public documents, however, may be
viewed on line at the Commission’s
Web site at https://www.ferc.gov using
the eLibrary link, or may be examined
in the Commission’s Public Reference
Room.
1005TH—MEETING
[Regular meeting, May 15, 2014, 10:00 a.m.]
Item No.
Docket No.
Company
Administrative
A–1 ........
A–2 ........
A–3 ........
AD02–1–000 ................................................
AD02–7–000 ................................................
AD05–9–000 ................................................
Agency Business Matters.
Customer Matters, Reliability, Security and Market Operations.
Energy Market and Reliability Assessment.
Electric
E–1 ........
E–2 ........
ER13–107–003 ............................................
ER13–107–005.
ER13–187–002 ............................................
ER13–187–003 ER13–187–004.
ER13–186–001.
ER13–89–001 ..............................................
ER13–89–002.
ER13–101–002 ............................................
E–3 ........
E–4 ........
E–5 ........
E–6 ........
E–7 ........
E–8 ........
ER13–101–003.
ER13–84–001 ..............................................
ER13–95–001 ..............................................
ER13–198–001 ............................................
ER13–198–002.
ER13–195–001 ............................................
ER13–90–001 ..............................................
ER13–90–002.
ER13–85–001 ..............................................
ER13–85–002.
ER13–1909–000.
ER11–2127–003 ..........................................
ER11–2127–004.
EL11–37–001.
EL10–29–003 ..............................................
EL10–36–003 ..............................................
RM14–11–000 .............................................
TX11–1–001 ................................................
EL14–9–000 ................................................
QF11–424–002.
EL14–18–000 ..............................................
South Carolina Electric & Gas Company.
Midwest Independent Transmission System Operator, Inc. and the MISO Transmission
Owners.
MidAmerican Energy Company and Midwest Independent Transmission System Operator, Inc.
American Transmission Company LLC and Midwest Independent Transmission System Operator, Inc.
Cleco Power LLC.
Entergy Arkansas, Inc.
PJM Interconnection, L.L.C.
Indicated PJM Transmission Owners.
PJM Interconnection, L.L.C. and Public Service Electric and Gas Company.
Maine Public Service Company.
Terra-Gen Dixie Valley, LLC.
Terra-Gen Dixie Valley, LLC, TGP Dixie Development Company, LLC and New York
Canyon, LLC.
Green Borders Geothermal, LLC v. Terra-Gen Dixie Valley, LLC.
Open Access and Priority Rights on Interconnection Customer’s Interconnection Facilities.
Southern Cross Transmission LLC and Pattern Power Marketing LLC.
Gregory and Beverly Swecker v. Midland Power Cooperative.
Gregory and Beverly Swecker v. Midland Power Cooperative and Central Iowa Power
Cooperative.
Miscellaneous
M–1 ........
M–2 ........
mstockstill on DSK4VPTVN1PROD with NOTICES
G–1 ........
G–2 ........
G–3 ........
RM01–5–001 ...............................................
IN13–15–000 ...............................................
BP Corporation North America Inc..
BP America Production Company..
BP Energy Company..
OR14–21–000 .............................................
RP14–393–000 ............................................
RP12–514–002 ............................................
RP11–1566–014.
RP11–2066–003.
Electronic Tariff Filings.
BP America Inc.
North Dakota Pipeline Company LLC.
Columbia Gas Transmission, LLC.
Tennessee Gas Pipeline Company, L.L.C.
Hydro
H–1 ........
H–2 ........
H–3 ........
P–6618–007 ................................................
OMITTED.
P–1290–013 ................................................
VerDate Mar<15>2010
19:27 May 12, 2014
Jkt 232001
PO 00000
Christopher M. Anthony.
Appalachian Power Company.
Frm 00020
Fmt 4703
Sfmt 4703
E:\FR\FM\13MYN1.SGM
13MYN1
Federal Register / Vol. 79, No. 92 / Tuesday, May 13, 2014 / Notices
27297
1005TH—MEETING—Continued
[Regular meeting, May 15, 2014, 10:00 a.m.]
Item No.
Docket No.
Company
Certificates
C–1 ........
CP13–83–000 ..............................................
Issued: May 8, 2014.
Kimberly D. Bose,
Secretary.
A free webcast of this event is
available through www.ferc.gov. Anyone
with Internet access who desires to view
this event can do so by navigating to
www.ferc.gov’s Calendar of Events and
locating this event in the Calendar. The
event will contain a link to its webcast.
The Capitol Connection provides
technical support for the free webcasts.
It also offers access to this event via
television in the DC area and via phone
bridge for a fee. If you have any
questions, visit
www.CapitolConnection.org or contact
Danelle Springer or David Reininger at
703–993–3100.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters, but will
not be telecast through the Capitol
Connection service.
[FR Doc. 2014–11011 Filed 5–9–14; 11:15 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14586–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
James R. Robertson, PE; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On February 10, 2014, James R.
Robertson, PE, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of
hydropower at the U.S. Army Corps of
Engineers’ (Corps) Sutton Dam, on the
Elk River, in Sutton, Braxton County,
West Virginia. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
VerDate Mar<15>2010
19:27 May 12, 2014
Jkt 232001
Arlington Storage Company, LLC.
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed Sutton Hydroelectric
Power Project would consist of the
following: (1) A new 80-foot-long by 40foot-wide powerhouse containing three
generating units with a total installed
capacity of 9.2 megawatts; (2) a new
multiple-port intake structure to be
located at the upstream face of the
Sutton dam; (3) a new 12-foot-diameter,
300-foot-long steel penstock; (4) a new
70-foot-long by 30-foot-wide
switchyard; (5) a new 138-kilovolt,
4,000-foot-long transmission line; and
(6) appurtenant facilities. The estimated
annual generation of the proposed
project would be 36 gigawatt-hours.
Applicant Contact: James R.
Robertson, PE, 5702 Reno Court,
Boonsboro, MD 21713; phone: (240)
405–5667.
FERC Contact: Monir Chowdhury;
phone: (202) 502–6736.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief
comments up to 6,000 characters,
without prior registration, using the
eComment system at https://www.ferc.
gov/docs-filing/ecomment.asp. You
must include your name and contact
information at the end of your
comments. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14586–000.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14586) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: May 6, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–10881 Filed 5–12–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14587–000]
Vortex Hydro Energy; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On February 21, 2014, Vortex Hydro
Energy filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
St. Clair River Hydrokinetic (St. Clair
River Project or project) to be located on
St. Clair River, in the city of Port Huron,
St. Clair County, Michigan. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) Three new 20-footlong by 32-foot-wide by 27-foot-high
oscylators, each containing four
horizontal cylinders with a combined
nameplate capacity of 33 kilowatts
(kW), for a project total of 100 kW of
installed capacity; (2) twelve 10-kW
generator units; (3) a traditional direct
current to alternating current inverter
for power connection to the grid; (4)
three 500-foot-long, 1-kilovolt (kV) to 3-
E:\FR\FM\13MYN1.SGM
13MYN1
Agencies
[Federal Register Volume 79, Number 92 (Tuesday, May 13, 2014)]
[Notices]
[Pages 27295-27297]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-11011]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Sunshine Act Meeting Notice
The following notice of meeting is published pursuant to section
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C.
552b:
AGENCY HOLDING MEETING: Federal Energy Regulatory Commission.
DATE AND TIME: May 15, 2014 10:00 a.m.
PLACE: Room 2C, 888 First Street, NE., Washington, DC 20426.
STATUS: OPEN.
MATTERS TO BE CONSIDERED: Agenda.
* NOTE--Items listed on the agenda may be deleted without further
notice.
[[Page 27296]]
CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary,
Telephone (202) 502-8400.
For a recorded message listing items struck from or added to the
meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It
does not include a listing of all documents relevant to the items on
the agenda. All public documents, however, may be viewed on line at the
Commission's Web site at https://www.ferc.gov using the eLibrary link,
or may be examined in the Commission's Public Reference Room.
1005TH--Meeting
[Regular meeting, May 15, 2014, 10:00 a.m.]
----------------------------------------------------------------------------------------------------------------
Item No. Docket No. Company
----------------------------------------------------------------------------------------------------------------
Administrative
----------------------------------------------------------------------------------------------------------------
A-1..................... AD02-1-000...................... Agency Business Matters.
A-2..................... AD02-7-000...................... Customer Matters, Reliability, Security and Market
Operations.
A-3..................... AD05-9-000...................... Energy Market and Reliability Assessment.
----------------------------------------------------------------------------------------------------------------
Electric
----------------------------------------------------------------------------------------------------------------
E-1..................... ER13-107-003.................... South Carolina Electric & Gas Company.
ER13-107-005....................
E-2..................... ER13-187-002.................... Midwest Independent Transmission System Operator,
Inc. and the MISO Transmission Owners.
ER13-187-003 ER13-187-004.......
ER13-186-001....................
ER13-89-001..................... MidAmerican Energy Company and Midwest Independent
Transmission System Operator, Inc.
ER13-89-002.....................
ER13-101-002.................... American Transmission Company LLC and Midwest
Independent Transmission System Operator, Inc.
ER13-101-003....................
ER13-84-001..................... Cleco Power LLC.
ER13-95-001..................... Entergy Arkansas, Inc.
E-3..................... ER13-198-001.................... PJM Interconnection, L.L.C.
ER13-198-002....................
ER13-195-001.................... Indicated PJM Transmission Owners.
ER13-90-001..................... PJM Interconnection, L.L.C. and Public Service
Electric and Gas Company.
ER13-90-002.....................
E-4..................... ER13-85-001..................... Maine Public Service Company.
ER13-85-002.....................
ER13-1909-000...................
E-5..................... ER11-2127-003................... Terra-Gen Dixie Valley, LLC.
ER11-2127-004...................
EL11-37-001.....................
EL10-29-003..................... Terra-Gen Dixie Valley, LLC, TGP Dixie Development
Company, LLC and New York Canyon, LLC.
EL10-36-003..................... Green Borders Geothermal, LLC v. Terra-Gen Dixie
Valley, LLC.
E-6..................... RM14-11-000..................... Open Access and Priority Rights on Interconnection
Customer's Interconnection Facilities.
E-7..................... TX11-1-001...................... Southern Cross Transmission LLC and Pattern Power
Marketing LLC.
E-8..................... EL14-9-000...................... Gregory and Beverly Swecker v. Midland Power
Cooperative.
QF11-424-002....................
EL14-18-000..................... Gregory and Beverly Swecker v. Midland Power
Cooperative and Central Iowa Power Cooperative.
----------------------------------------------------------------------------------------------------------------
Miscellaneous
----------------------------------------------------------------------------------------------------------------
M-1..................... RM01-5-001...................... Electronic Tariff Filings.
M-2..................... IN13-15-000..................... BP America Inc.
BP Corporation North America
Inc..
BP America Production Company...
BP Energy Company...............
G-1..................... OR14-21-000..................... North Dakota Pipeline Company LLC.
G-2..................... RP14-393-000.................... Columbia Gas Transmission, LLC.
G-3..................... RP12-514-002.................... Tennessee Gas Pipeline Company, L.L.C.
RP11-1566-014...................
RP11-2066-003...................
----------------------------------------------------------------------------------------------------------------
Hydro
----------------------------------------------------------------------------------------------------------------
H-1..................... P-6618-007...................... Christopher M. Anthony.
H-2..................... OMITTED.........................
H-3..................... P-1290-013...................... Appalachian Power Company.
----------------------------------------------------------------------------------------------------------------
[[Page 27297]]
Certificates
----------------------------------------------------------------------------------------------------------------
C-1..................... CP13-83-000..................... Arlington Storage Company, LLC.
----------------------------------------------------------------------------------------------------------------
Issued: May 8, 2014.
Kimberly D. Bose,
Secretary.
A free webcast of this event is available through www.ferc.gov.
Anyone with Internet access who desires to view this event can do so by
navigating to www.ferc.gov's Calendar of Events and locating this event
in the Calendar. The event will contain a link to its webcast. The
Capitol Connection provides technical support for the free webcasts. It
also offers access to this event via television in the DC area and via
phone bridge for a fee. If you have any questions, visit
www.CapitolConnection.org or contact Danelle Springer or David
Reininger at 703-993-3100.
Immediately following the conclusion of the Commission Meeting, a
press briefing will be held in the Commission Meeting Room. Members of
the public may view this briefing in the designated overflow room. This
statement is intended to notify the public that the press briefings
that follow Commission meetings may now be viewed remotely at
Commission headquarters, but will not be telecast through the Capitol
Connection service.
[FR Doc. 2014-11011 Filed 5-9-14; 11:15 am]
BILLING CODE 6717-01-P