Environmental Impact Statements; Notice of Availability, 26750-26751 [2014-10681]

Download as PDF ehiers on DSK2VPTVN1PROD with NOTICES 26750 Federal Register / Vol. 79, No. 90 / Friday, May 9, 2014 / Notices permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A 650-feet-wide and up to 7-feet-high concrete diversion structure; (2) a 6-mile-long penstock that would feed up to five, 1-mile-long pressurized, reinforced concrete pipes creating approximately 125 feet of head; (3) a powerhouse, containing up to four turbine-generators; and (4) an undefined interconnection point to the grid within five to eight miles of the proposed powerhouse. The estimated annual generation of the Stony Creek Project would be 100,000 megawatt-hours. Applicant Contact: Mr. Paul Grist, President, Archon Energy 1, Inc., 101 E. Kennedy Blvd., Suite 2800, Tampa, Florida 33602; phone: (415) 377–2460. FERC Contact: Shana Murray; phone: (202) 502–8333. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–14571–000. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14571) in the docket number field to access the document. For assistance, contact FERC Online Support. VerDate Mar<15>2010 14:53 May 08, 2014 Jkt 232001 Dated: May 1, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–10613 Filed 5–8–14; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–9014–8] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7146 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 04/28/2014 through 05/02/2014 Pursuant to 40 CFR 1506.9. Notice Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA’s comment letters on EISs are available at: https:// www.epa.gov/compliance/nepa/ eisdata.html. EIS No. 20140132, Final EIS, FHWA, TX, Grand Parkway Segments H and I–1, Review Period Ends: 06/09/2014, Contact: Gregory S. Punske 512–536– 5900. EIS No. 20140133, Final EIS, FERC, LA, Cameron Liquefaction Project, Review Period Ends: 06/09/2014, Contact: Danny Laffoon 202–502–6257. EIS No. 20140134, Draft Supplement, BPA, ID, Hooper Springs Transmission Project, Comment Period Ends: 08/07/2014, Contact: Tish Eaton 503–230–3469. EIS No. 20140135, Draft EIS, RUS, SC, McClellanville 115 kV Transmission Project, Comment Period Ends: 06/23/ 2014, Contact: Lauren McGee Rayburn 202–695–2540. EIS No. 20140136, Draft EIS, FTA, WA, Link Light Rail Operations and Maintenance Satellite Facility, Comment Period Ends: 06/23/2014, Contact: James Saxton 206–220–7954. EIS No. 20140137, Draft Supplement, BLM, ID, Cottonwood Resource Management Plan Amendment for Domestic Sheep Grazing, Comment Period Ends: 08/07/2014, Contact: Scott Pavey 208–769–5059. EIS No. 20140138, Final EIS, FHWA, OH, Cleveland Opportunity Corridor, Contact: Naureen Dar 614–280–6846. Under MAP–21 section 1319, FHWA has issued a single FEIS and ROD. Therefore, the 30-day wait/review PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 period under NEPA does not apply to this action. EIS No. 20140139, Draft EIS, USAF, FL, Gulf Regional Airspace Strategic Initiative Landscape Initiative, Comment Period Ends: 06/23/2014, Contact: Michael Spaits 850–882– 2836. EIS No. 20140140, Draft EIS, CALTRANS, CA, Centennial Corridor Project, Comment Period Ends: 07/08/ 2014, Contact: Jennifer Taylor 559– 445–6455. EIS No. 20140141, Final EIS, NPS, NJ, Gateway National Recreation Area Final General Management Plan, Review Period Ends: 06/09/2014, Contact: Jennifer Nersesian 718–354– 4664. EIS No. 20140142, Draft Supplement, STB, UT, Six County Association of Governments Proposed Rail Line between Levan and Salina, Comment Period Ends: 06/23/2014, Contact: Phillis Johnson-Ball 202–245–0304. EIS No. 20140143, Draft EIS, BR, CA, Contra Loma Reservoir and Recreation Area Resource Management Plan, Comment Period Ends: 07/02/2014, Contact: David Woolley 559–487– 5049. EIS No. 20140144, Draft EIS, USMC, BR, CA, Santa Margarita River Conjunctive Use Project, Comment Period Ends: 06/23/2014, Contact: Kristin Thomas 760–725–9741. The U.S. Department of Defense’s Marine Corps and the U.S. Department of the Interior’s Bureau of Reclamation are joint lead agencies for the above project. EIS No. 20140145, Final EIS, USFS, CO, Cumbres Vegetation Management Project, Review Period Ends: 06/20/ 2014, Contact: Diana McGinn 719– 852–6241. Amended Notices EIS No. 20140086, Draft EIS, USFS, ID, Upper North Fork HFRA Ecosystem Restoration Project, Comment Period Ends: 05/05/2014, Contact: Maggie Seaberg 208–756–2711. Revision to FR Notice Published 3/21/2014; Extending Comment Period from 5/5/ 2014 to 5/19/2014. EIS No. 20140087, Final EIS, FHWA, TX, Trinity Parkway, From IH–35E/ SH–183 to US–17/SH–310, Review Period Ends: 05/09/2014, Contact: Salvador Deocampo 512–536–5950. Revision to the FR Notice Published 3/21/2014; Extending Review Period from 05/05/2014 to 05/09/2014. E:\FR\FM\09MYN1.SGM 09MYN1 Federal Register / Vol. 79, No. 90 / Friday, May 9, 2014 / Notices Dated: May 6, 2014. Cliff Rader, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 2014–10681 Filed 5–8–14; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [FRL–9910–58–OW] Notice of a Public Meeting: The National Drinking Water Advisory Council Lead and Copper Rule Working Group Meeting Environmental Protection Agency (EPA). ACTION: Notice of a public meeting. AGENCY: The U.S. Environmental Protection Agency (EPA) is announcing a public meeting of the National Drinking Water Advisory Council (NDWC) Lead and Copper Rule Working Group (LCRWG). The meeting is scheduled for May 29 and 30, 2014, in Arlington, VA. During this meeting, the LCRWG and the EPA will focus discussions on the Lead and Copper Rule sample site selection criteria. DATES: The meeting on May 29, 2014, will be held from 9 a.m. to 5 p.m., Eastern Time, and on May 30, 2014, from 9 a.m. to 3 p.m., Eastern Time. ADDRESSES: The public meeting will be held at the Cadmus Group Inc., 1555 Wilson Blvd., Suite 300, Arlington, VA, and will be open to the public. All attendees must sign in with the security desk and show photo identification to enter the building. FOR FURTHER INFORMATION CONTACT: For more information about this meeting or to request written materials contact Lameka Smith, Standards and Risk Management Division, Office of Ground Water and Drinking Water; by phone (202) 564–1629 or by email at LCRWorkingGroup@epa.gov. For additional information about the Lead and Copper Rule, please visit: https:// water.epa.gov/lawsregs/rulesregs/sdwa/ lcr/index.cfm. SUPPLEMENTARY INFORMATION: Details about Participating in the Meeting: Members of the public who would like to register for this meeting should contact Lameka Smith by May 27th, 2014, by email at LCRWorkingGroup@epa.gov or by phone at 202–564–1629. The LCRWG will allocate time for the public’s input at the meeting on May 29 and 30. Oral statements will be limited to five minutes at the meeting. It is preferred that only one person present the ehiers on DSK2VPTVN1PROD with NOTICES SUMMARY: VerDate Mar<15>2010 14:53 May 08, 2014 Jkt 232001 statement on behalf of a group or organization. To ensure adequate time for public involvement, individuals or organizations interested in presenting an oral statement should notify Lameka Smith no later than May 22, 2014. Any person who wishes to file a written statement can do so before or after the LCRWG meeting. Written statements intended for the meeting must be received by May 22, 2014, to be distributed to all members of the working group before the meeting. Any statements received on or after the date specified will become part of the permanent file for the meeting and will be forwarded to the LCRWG members for their information. Special Accommodations: For information on access or to request special accommodations for individuals with disabilities please contact Lameka Smith at (202) 564–1629 or by email at LCRWorkingGroup@epa.gov at least 10 days prior to the meeting to give EPA as much time as possible to process your request. Dated: April 30, 2014. Peter Grevatt, Director, Office of Ground Water and Drinking Water. [FR Doc. 2014–10677 Filed 5–8–14; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OAR–2010–0108; FRL–9910–59– OAR] Release of Final Policy Assessment Document Related to the Review of the National Ambient Air Quality Standards for Lead Environmental Protection Agency (EPA). ACTION: Notice of availability. AGENCY: The EPA is announcing the availability of a final document titled Policy Assessment for the Review of the Lead National Ambient Air Quality Standards. The Policy Assessment (PA) has been prepared by staff in the EPA’s Office of Air Quality Planning and Standards (OAQPS) as part of the agency’s ongoing review of the primary (health-based) and secondary (welfarebased) national ambient air quality standards (NAAQS) for lead (Pb). It presents analyses and staff conclusions regarding the policy implications of the key scientific and technical information that informs this review. DATES: The PA will be available on or about May 9, 2014. SUMMARY: PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 26751 This document will be available primarily via the Internet at the following Web site: https:// www.epa.gov/ttn/naaqs/standards/pb/ s_pb_index.html. FOR FURTHER INFORMATION CONTACT: Dr. Deirdre Murphy, Office of Air Quality Planning and Standards (mail code C504–06), U.S. Environmental Protection Agency, Research Triangle Park, NC 27711; telephone number: 919–541–0729; fax number: 919–541– 0237; email address: murphy.deirdre@ epa.gov. ADDRESSES: Two sections of the Clean Air Act (CAA) govern the establishment and revision of the NAAQS. Section 108 (42 U.S.C. section 7408) directs the Administrator to identify and list certain air pollutants and then to issue air quality criteria for those pollutants. The Administrator is to list those air pollutants that in her ‘‘judgment, cause or contribute to air pollution which may reasonably be anticipated to endanger public health or welfare;’’ ‘‘the presence of which in the ambient air results from numerous or diverse mobile or stationary sources;’’ and ‘‘for which . . . [the Administrator] plans to issue air quality criteria. . . .’’ Air quality criteria are intended to ‘‘accurately reflect the latest scientific knowledge useful in indicating the kind and extent of all identifiable effects on public health or welfare which may be expected from the presence of [a] pollutant in the ambient air . . .’’ 42 U.S.C. section 7408(b). Under section 109 (42 U.S.C. section 7409), the EPA establishes primary (health-based) and secondary (welfare-based) NAAQS for pollutants for which air quality criteria are issued. Section 109(d) requires periodic review and, if appropriate, revision of existing air quality criteria. The EPA is also required to periodically review and, if appropriate, revise the NAAQS based on the revised criteria. Section 109(d)(2) requires that an independent scientific review committee ‘‘shall complete a review of the criteria . . . and the national primary and secondary ambient air quality standards . . . and shall recommend to the Administrator any new . . . standards and revisions of existing criteria and standards as may be appropriate. . . .’’ Since the early 1980’s, this independent review function has been performed by the Clean Air Scientific Advisory Committee (CASAC). Presently, the EPA is reviewing the NAAQS for Pb.1 The document, whose SUPPLEMENTARY INFORMATION: 1 The EPA’s call for information for this review was issued on February 26, 2010 (75 FR 8934). E:\FR\FM\09MYN1.SGM 09MYN1

Agencies

[Federal Register Volume 79, Number 90 (Friday, May 9, 2014)]
[Notices]
[Pages 26750-26751]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-10681]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-9014-8]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7146 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed 04/28/2014 through 05/02/2014 Pursuant to 40 CFR 1506.9.

Notice

    Section 309(a) of the Clean Air Act requires that EPA make public 
its comments on EISs issued by other Federal agencies. EPA's comment 
letters on EISs are available at: https://www.epa.gov/compliance/nepa/eisdata.html.

EIS No. 20140132, Final EIS, FHWA, TX, Grand Parkway Segments H and I-
1, Review Period Ends: 06/09/2014, Contact: Gregory S. Punske 512-536-
5900.
EIS No. 20140133, Final EIS, FERC, LA, Cameron Liquefaction Project, 
Review Period Ends: 06/09/2014, Contact: Danny Laffoon 202-502-6257.
EIS No. 20140134, Draft Supplement, BPA, ID, Hooper Springs 
Transmission Project, Comment Period Ends: 08/07/2014, Contact: Tish 
Eaton 503-230-3469.
EIS No. 20140135, Draft EIS, RUS, SC, McClellanville 115 kV 
Transmission Project, Comment Period Ends: 06/23/2014, Contact: Lauren 
McGee Rayburn 202-695-2540.
EIS No. 20140136, Draft EIS, FTA, WA, Link Light Rail Operations and 
Maintenance Satellite Facility, Comment Period Ends: 06/23/2014, 
Contact: James Saxton 206-220-7954.
EIS No. 20140137, Draft Supplement, BLM, ID, Cottonwood Resource 
Management Plan Amendment for Domestic Sheep Grazing, Comment Period 
Ends: 08/07/2014, Contact: Scott Pavey 208-769-5059.
EIS No. 20140138, Final EIS, FHWA, OH, Cleveland Opportunity Corridor, 
Contact: Naureen Dar 614-280-6846.

    Under MAP-21 section 1319, FHWA has issued a single FEIS and ROD. 
Therefore, the 30-day wait/review period under NEPA does not apply to 
this action.
EIS No. 20140139, Draft EIS, USAF, FL, Gulf Regional Airspace Strategic 
Initiative Landscape Initiative, Comment Period Ends: 06/23/2014, 
Contact: Michael Spaits 850-882-2836.
EIS No. 20140140, Draft EIS, CALTRANS, CA, Centennial Corridor Project, 
Comment Period Ends: 07/08/2014, Contact: Jennifer Taylor 559-445-6455.
EIS No. 20140141, Final EIS, NPS, NJ, Gateway National Recreation Area 
Final General Management Plan, Review Period Ends: 06/09/2014, Contact: 
Jennifer Nersesian 718-354-4664.
EIS No. 20140142, Draft Supplement, STB, UT, Six County Association of 
Governments Proposed Rail Line between Levan and Salina, Comment Period 
Ends: 06/23/2014, Contact: Phillis Johnson-Ball 202-245-0304.
EIS No. 20140143, Draft EIS, BR, CA, Contra Loma Reservoir and 
Recreation Area Resource Management Plan, Comment Period Ends: 07/02/
2014, Contact: David Woolley 559-487-5049.
EIS No. 20140144, Draft EIS, USMC, BR, CA, Santa Margarita River 
Conjunctive Use Project, Comment Period Ends: 06/23/2014, Contact: 
Kristin Thomas 760-725-9741.

    The U.S. Department of Defense's Marine Corps and the U.S. 
Department of the Interior's Bureau of Reclamation are joint lead 
agencies for the above project.

EIS No. 20140145, Final EIS, USFS, CO, Cumbres Vegetation Management 
Project, Review Period Ends: 06/20/2014, Contact: Diana McGinn 719-852-
6241.

Amended Notices

EIS No. 20140086, Draft EIS, USFS, ID, Upper North Fork HFRA Ecosystem 
Restoration Project, Comment Period Ends: 05/05/2014, Contact: Maggie 
Seaberg 208-756-2711. Revision to FR Notice Published 3/21/2014; 
Extending Comment Period from 5/5/2014 to 5/19/2014.
EIS No. 20140087, Final EIS, FHWA, TX, Trinity Parkway, From IH-35E/SH-
183 to US-17/SH-310, Review Period Ends: 05/09/2014, Contact: Salvador 
Deocampo 512-536-5950. Revision to the FR Notice Published 3/21/2014; 
Extending Review Period from 05/05/2014 to 05/09/2014.


[[Page 26751]]


    Dated: May 6, 2014.
Cliff Rader,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2014-10681 Filed 5-8-14; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.